Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Technical Note - Simplified Settlement Model For A Shallow Foundation On Composite Ground With Rigid Piles
By Timothy C. Siegel
A piled raft refers to a shallow foundation that is structurally connected to the piles, while composite ground refers to a soil-pile matrix where the piles are not structurally connected. The design
Jan 1, 2011
-
Analysis of Three Axial Load Tests on Large Bored Grouted Deep Foundations
By Hayel M. El-Naggar, Marawan M. Shahien
"Large capacity piles are important type of foundation elements that are needed in case of high column loads such as in tall buildings with large span between columns. In many projects, especially if
Jan 1, 2017
-
The Secret to Dewatering
By Gregory M. Landry
"There is an old joke at Moretrench that defines dewatering as “that element of an underground construction project, which, when disregarded, will generate the low bidder.” Sigmund Freud wrote that al
Jan 1, 2017
-
Laboratory Modeling of Internal Erosion in Dam Foundations
By Kenneth E. Henn, David B. Paul, John D. Rice, Brian H. Greene
"Several laboratory modeling programs have been conducted to investigate the mechanisms associated with internal erosion of dam embankments and foundations. The investigation consists of developing l
Jan 1, 2016
-
Practical Reuse of Foundations in High Rise Construction
By William H. Walton, Clyde N. Baker Jr., Darren S. Diehm
"A 51-story concrete core and steel frame commercial office tower was recently constructed on the site of the former US Gypsum building in downtown Chicago, Illinois, USA The structure foundation reus
Jan 1, 2005
-
Load Tests On Large Diameter Bored Piles In Cemented Sands
By Nabil F. Ismael
Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait.
-
4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. Introduction
By B. De Paoli
At Pietrafitta, between Assisi and Perugia, ENEL (Italian National Electricity Authority) has for some time been managing a power-station operated with lignite, mined from an open mine on the way to e
Jan 1, 1994
-
Cutter Soil Mixing and Augered-Cast-In-Place Piling Close to the Gulf of Mexico
By Justin Simmons, Michael Arnold, Bob Faulhaber
"In order to remodel an existing beach resort on the Gulf of Mexico, an existing three story structure, founded on stepped tapered piles, was to be replaced by a ten-story building with service rooms
Jan 1, 2017
-
2022 OPA Winner: Mosul Dam Rehabilitation Project
By Raffaella Granta
Mosul Dam is an earth fill dam located on the Tigris River, approximately 40 km (25 mi) northwest of Mosul, Iraq. The construction of the dam was completed in 1984. It is one of the largest multipurpo
Oct 1, 2022
-
An Explosive Waterproofing Of A Riverbank - A Difficult Waterproofing Problem Solved By The Unique And Controversial Combination Of A Mining Technique (Blasting) And A Soil Improvement Technique (Jet-Grouting) - The Problem
By M. Zanotto
[ ] A period of heavy rains caused the river Adda to flood parts of the Valtellina, one of the Alpine valleys of Northern Italy. The exceptionally high waters put under considerable strain the whole
Jan 1, 1992
-
Tresfjord Bridge -Pile Works
By Andreas Andenæs, Arne Schram Simonsen
"AbstractThe Tresfjord bridge is with its variety in foundation concepts and difficult soil conditions one of the most geotechnically challenging projects in Norway at the time. The project comprises
Jan 1, 2014
-
Large Diameter Steel Pipe Piles Running Under Self Weight In Soft Clay ' Predicted Vs. Observed Behavior ' Richmond San Rafael Bridge Seismic Retrofit
By A. R. Dover
The Richmond San Rafael Bridge (Figure 1) is a 4.3 mile long major toll bridge span across northern San Francisco Bay. Tutor-Saliba/Koch/Tidewater (TSKT) conducted a comprehensive seismic retrofit, wh
Jan 1, 2006
-
Difficulties In Caisson Construction
By Ronnie W. Sisk
1. Troubles start early - Inadequate Geotechnical Data A. Owners think they are saving money by allowing limited soil borings at their site. This places a high gamble on the bidders and the Lump Sum
Jan 1, 1988
-
History Of Chicago Foundation Systems & Underground Construction ? Summary
By Theodore R. Maynard
The history of foundation engineering in Chicago is a tale of innovation, made necessary in order to keep pace with structural technology which allowed taller buildings with heavier bearing loads, to
Jan 1, 1991
-
Insight to Foundation Construction of Extradosed - 3rd Narmada Bridge over River Narmada, Bharuch, Gujarat
By Ekhlaq A. Khan
"The new third Bridge over Narmada River at Bharuch which was recently completed is characterized by some aesthetically appealing elevations of the pylon and large size of the deck. This paper gives a
Jan 1, 2017
-
Defective Piles In Clay - Synopsis
By S. Narasimha Rao
Bored cast in situ piles are highly susceptible to construction defects like necking, discontinuity in concreting, poor compaction of concrete, improper end bearing condition due to inadequate cleanin
Jan 1, 1996
-
St. Anthony Falls, I-35w Bridge Drilled Shaft Load Test Program
By Jeffrey A. Gebhard
As part of the design and construction of the new St. Anthony Falls I-35W Bridge, a full-scale load test was conducted on a 6 1/2-foot diameter drilled shaft in the St. Peter Sandstone. This load tes
Jan 1, 2009
-
Design and Construction of Mixed Ground Working Platform for a CCR Surface Impoundment
By Juan M. Pestana, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, William Tanner, Daniel J. Woeste
An access pathway and working platform were designed and constructed for equipment access for a Deep Soil Mixing (DSM) pilot study over a coal combustion residual (CCR) surface impoundment (SI). The D
Jan 1, 2019
-
Conventional Static And Rapid Load Tests On CIDH Piers At A University Of California Berkeley Site
By Gyimah Kasali
Rapid Load Testing was performed as part of an extensive drilled pier testing program for the University of California Berkeley Capital Improvement Program. The purpose of the program was to: (1)
Jan 1, 2002
-
Vertical Load Test on a Drilled Shaft Installed in Glacially Derived Sediments
By Robert C. Simpson, Ghada S. Ellithy
"There are several methods for estimating the axial capacity of drilled shafts installed in coarse-grained soils. Most methods estimate the ultimate capacity for side friction and tip resistance. Desi
Jan 1, 2015