East Boston Branch Sewer Relief Project: Support Of Excavation Case Study
By Eric P. Bregman
As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed
-
East Boston Branch Sewer Relief Project: Support of Excavation Case Study (FULL Project)
By Eric P. Bregman, Franklin M. Grynkewicz, John E. Regan
"As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed
Jan 1, 2017
-
Pneumatic Sinking 2.0: A World Record Caisson Project By Large Scale Innovations Evolution In Theory And Revolution In Practice
By Bartho J. Admiraal, Antoine Feddema
Pneumatic sinking of caissons has been established from mid-19th century. The technique of pneumatic sinking has been applied on many projects for underground construction up to depths over 20m below
May 1, 2022
-
Design And Construction Of Underground Basin Using Composite Slurry Wall 500 Feet Away From The Pacific Ocean
By Ihab Allam PE, Meeok Kim. PE. Ph. D
The wet weather equalization basin (EB) planned for Pacifica, CA is a 45 feet deep rectangular shaped underground water tank containing over 2.1 million gallons of water, and located only 500 feet awa
-
Removal of the Former San Francisco-Oakland Bay Bridge Foundation Caisson E3 by Mechanical Means and Explosives
By Michael Gebman, Jack Gerwick
"With the opening of the new San Francisco-Oakland Bay Bridge East Span, the former bridge and its caisson foundations are being demolished. Caisson foundations are in the path of a future shipping ch
Jan 1, 2016
-
Innovative Drilled Shaft Installation Process Through Existing Bridge Foundations
By Tracy Brettmann
The Highway 146 Bridge Expansion Project across the Clear Creek Channel in Houston, Texas was designed on driven precast concrete piles. However, during construction, the piles along one side of the b
May 1, 2022
-
Mindful Monitoring Of A Variable Excavation Support System
By B. Philip Shull, Allen W. Cadden, Johanna M. Simon, Michael S. Senior
A 670 linear meter (2,200 linear foot) large-diameter sanitary sewer interceptor installation at depths ranging from 3 to 10 m (10 to 30 ft) below existing grade in an area with a high water table req
-
Full-Scale O-Cell Load Test for a Rotator Drilled Rock Socket at the Main Span of the New Benicia-Martinez Bridge
By Ronnie X. Gu, Xing Zheng, Gem-Yeu Ma
Due to implementation of the rotator construction method from which a smooth shaft was anticipated, a full-scale pile load test (Osterberg Method) was performed at Pier 14 Pile 9 of the main span of t
Jan 1, 2005
-
Supported Excavation Movement Causing Lateral Displacement and Cracks in Drilled Shafts - Lessons Learned from a Case Study in Chicago
By Eric R. Borys, Amaneh E. Kenarsari, Brett Gitskin
This case study discusses impacts of excessive Earth Retention System (ERS) lateral movement at a project in city of Chicago. The ERS (cantilevered sheeting) moved inward towards the excavation and ca
Jan 1, 2018
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KY
By Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Foundations For Light Buildings On Lime/Cement (L/C) Columns ? Summary
By Per Eriksson
For light buildings on clay, foundations on L/C-columns is in many cases a competitive alternative to piles when the thickness of the clay is moderate (<20 m). The method is applicable for the above m
Jan 1, 2000
-
New Possibilities for Quality Assurance of Diaphragm Wall Joints
By Joram M. Amir, Ernst Niederleithinger, Nikolaus Schneider
"Abstract: Diaphragm walls are used to provide a stable and watertight confinement for the construction of tunnels, underground railway stations, deep basements and other structures requiring deep exc
Jan 1, 2014
-
Augered Cast-In-Place Concrete Piles In Flood Plains - 1.0 Introduction
By Javaid M. Alvi
This paper is an attempt to outline the emergence of Augered Cast-ln-Place piles as one of the more economical types of foundation for supporting high-rise buildings and heavily loaded structures rece
Jan 1, 2001
-
Design And Construction Of The Sutong Bridge Foundations
By Robert B. Bittner
The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo
Jan 1, 2007
-
An Active Soil Nail Wall Underpinning Solution
By Jonathan Ernst
The Bruce Museum is an art, science and natural history museum in Green- wich, Connecticut. The museum was originally built as a private residence in 1853, and has undergone several reno- vations, the
Aug 1, 2023
-
Design And Construction Of The Sutong Bridge Foundations
By Robert B. Bittner
The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations f
Jan 1, 2013
-
Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation Remediation
By Michael Arnold, Bob Faulhaber, Joe Nichols
"Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam
Jan 1, 2017
-
Quality Assurance In Jet Grouting For A Deep Seated Slab In Amsterdam
By Thomas Passlick
By means of further developed machines and techniques and with growing experiences in jet grouting, the challenge of this building method becomes more and more complex. To keep the concerning risks as
Jan 1, 2006
-
Investigations on the Distress to the Pavements/PQC Slab around Monorail Piers, Wadala, Mumbai
By Unnikrishnan Nair, Sandeep S. Nikam, Sanjay D. Patil, Prabir C. Basu
"Mumbai Metropolitan Region Development Authority (MMRDA) entrusted to implement Monorail Systems in various parts of Mumbai Metropolitan Region (MMR) with the objective to supplement the present tran
Jan 1, 2015
-
Oldie But Goldie – Bi-Directionally Tested Foundation Piles With Base Enlargement As A Smart And Economical Alternative To Conventional Piles At Geneva, Switzerland
By Dipl. -Ing. (FH) Thomas Schmitt, Dr. Melvin England
Foundations in Geneva are difficult and expensive due a large overlayer of clay and silt above competent bearing material in the moraine. Common foundation schemes use deep barrettes or bored piles, f
May 1, 2022