Diaphragm Walls Seismic Design According to the Eurocodes
By J. Matos e Silva
"Abstract Although one can think that it is very low the probability of a seism occurrence during the execution of an excavation in an urban lot protected by a diaphragm wall curtain, reality shows th
Jan 1, 2014
-
A Seepage Control Cutoff in an Extreme Saline Environment
By Kevin Green, Iván Contreras, Aaron Grosser, Jon Ausdemore, Rachel Leier, Amr Ragy
"Construction of a new tailings dam was required to increase tailings storage capacity at a trona mine near Green River, Wyoming. The new dam was founded on overburden soils underlain by both fracture
Jan 1, 2016
-
Interlocking Caisson Walls
By William E. Lardner
Interlocking caisson walls developed from conventional "soldier pile and lagging" shoring. In the latter, the soldier piles receive directly most of the soil load. Natural arches form in the soil behi
Jan 1, 1987
-
Stability Analysis Of A Rubble Mound Breakwater Resting On The Weak Seabed By 2D Finite Element Modelling
By Vijaya R, Boominathan A
The design of a rubble mound breakwater resting on a problematic seabed is quite challenging and expensive. In the present study, stage-wise construction of a typical section of the breakwater for a p
Sep 1, 2022
-
Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 Walton
By Joel B. Dellaria, Justin R. Lewis
"No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca
Jan 1, 2017
-
The Design And Construction Of Large Diameter Base Grouted Piles In Thanet Sand At Blackwall Yard, London
By J. A. Yeats
This paper describes the loading to 25MN of a 1.2m diameter bored cast-in-situ test pile founded in the Thanet Sand which was base grouted. The pile was sleeved over the major portion of its length to
Jan 1, 1989
-
Kentucky Route 9 - Licking Pike Widening Design Build Slope Stabilization
By Frederick W. Slack
This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage
Jan 1, 2003
-
Alternative Binder For Ground Improvement To Reduce Co2 Footprint
By Brandon M. Robinson, Osman F. Besler, Dominik Gaechter
The Sandbukta-Moss-Såstad (SMS) project is a part of the Intercity development project, which is part of the largest transport project in Norway, consisting of 270 km of new double-track rail. The SMS
May 1, 2022
-
Deep Foundation Underpinning Support For Fort Monroe, Virginia YMCA Historic Building Renovation
By David C. Kraft
Atlas Systems, Inc. (ASI) resistance type piers were used to underpin a 100 year old historic structure at Fort Monroe, Virginia. This 3-story structure with basement was underpinned with 155 steel tu
Jan 1, 2002
-
Construction of Long Deep Mixing Columns by Low-Height Rig
By Shigenori Horikawa, Nobutaka Tanaka, Toshiro Hara, Kengo Yamamoto
"The CDM-LODIC method(Low Displacement and Control method), a modified the CDM(Cement Deep Mixing) method, reduces the ground displacement through the removal of in-situ soil equivalent to the amount
Jan 1, 2015
-
Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)
By Jeffrey M. Taylor, Arturo Ressi di Cervia
"Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con
Jan 1, 2004
-
The First Cut-Off Wall In The Indian Himalayas For The Dam Of The Dhauliganga Hydroelectric Project
By Wolfgang G. Brunner
In the far north of Uttar Pradesh Province in the Indian Himalayas, the 280 MW Dhauliganga hydroelectric power plant is under construction by National Hydroelectric Power Corporation (NHPC), a state-
Jan 1, 2004
-
Piling Problems - Introduction
By D. Millgard
Dennis Millgard introduced the Session by hoping that participants to the Conference would also share their piling problems. He then invited the first speaker to present his paper. Paper 5.1.
Jan 1, 1991
-
Wolf Creek Dam Foundation Remediation – An Innovative Solution
By Fabio Santillan, Lyndon Bedford
"This paper presents the main features of the Wolf Creek Dam Foundation Remediation Project, highlighting the innovative construction approach and stressing on how the collaboration between the contra
Jan 1, 2015
-
Sustainability Considerations in Deep Mixing Applications, With Examples from LPV 111 in New Orleans, LA
By Craig M. Shillaber, Joseph E. Dove, James K. Mitchell
"This paper addresses two primary factors affecting the sustainability of Deep Mixing Methods (DMMs): construction materials and handling of the spoil from wet mixing methods. We examine these factors
Jan 1, 2015
-
Foundation in Simsima Lime Stone for an Underground Reservoir
By Chandramohan P. V., Ravi Kishore
"An underground reservoir was to be constructed at Doha in Qatar. Simsima lime stone is present at the bottom. When the reservoir is empty, there will be uplift at the bottom but this will change to d
Jan 1, 2017
-
Full Scale Uplift Load Testing of Micropiles in Cohessionless Soil
By M. Hesham El Naggar, Maged A. Abdlrahem
"Hollow bar micropiles have constructional advantages such as: fast and low-noise and low vibration installation process and small installation equipment, which allow access to tight places. In additi
Jan 1, 2016
-
Large Scale Lateral Testing Of Pile Foundations (Young Professor Paper Competition 2010)
By Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010
-
Impact Of Groundwater Flow On Design Of Open Underground Excavation
By Heman Manchanda, Sandeep Sharma
Several infrastructure projects are in various stages of construction and planning in India and almost all of them involves open ground excavation extending to varying depths. These structures are gen
Sep 1, 2022
-
Numerical Modelling of a Deep Excavation Shoring for Replacement of Control Structure at a Dam
By Lok M. Sharma, Deep K. Khatri, Bradfield. Brett
"A shored enclosure was required to access a control structure upstream below the dam of a deep lake. The shoring involves the interaction of the structure, soil, and water and the loads imposed inclu
Jan 1, 2017