Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    The World's Longest Directional Impact Driven Pile

    By Robert F. Stevens, Robin Givet, Kenneth Viking

    "Summary This paper describes a case of a directional pile installation conducted from an existing oil platform in the Caspian Sea, offshore Baku. Results are presented for 660 mm outer diameter (660

    Jan 1, 2014

  • DFI
    A Case Study - Drilled Pier Foundations for a New Atlanta Stadium

    By Jean Wehbe, Daniel C. Brahana

    "This paper presents a case history of drilled pier construction for a new stadium in Atlanta, Georgia. The stadium structure is supported on several different foundation types, with the heaviest ""me

    Jan 1, 2017

  • DFI
    Ground Freezing for Groundwater Cutoff at the Seattle Seawall Replacement Project

    By Brenton Cook, Daniel Mageau, Larry Applegate, Aaron McCain

    "Ground freezing was successfully used to create an impermeable barrier wall along 3,000 feet of the downtown Seattle waterfront as part of the Seattle Seawall Replacement Project. This $360 million r

    Jan 1, 2016

  • DFI
    Remediation Of Rail Structures Impacted By Landslides Using Sleeved Bored Piles

    By Paul Hewitt, Aaron Rastall

    The New South Wales South Coast rail corridor is key infrastructure for both freight and passenger transport. Geomorphological and geological evidence suggests that land instability has been widesprea

    Nov 1, 2022

  • DFI
    Rectification Measures And Restoration Of Distressed Pump Foundations

    By V K. Panwar, Sampat Raj

    At a Fertilizer plant located in the southern part of India, 74 numbers of pump foundations have shown non-uniform settlements causing the tilting of pump foundations under self-weight primarily due t

    Nov 1, 2022

  • DFI
    Micro-Pile Foundations in Difficult Subsurface Conditions

    By D. Dreher Whetstone, Paul M. Blakita, Christopher M. Reith, Ravi P. Malviya

    "Micro-piles are small diameter (5 to 10 inches), cast-in-place piles which can develop high load capacities by bonding with soil or rock. Micro-piles are particularly well-suited for moderate to heav

    Jan 1, 2005

  • DFI
    Building Above And Excavating Below An Iconic Building In Manhattan

    By John S. Civetta, Seth Martin, Marc J. Gallagher, Arthur J. Alzamora, Ronald Peralta

    The Crown Building, built circa 1921, is a 26-story iconic building located at West 57th Street and Fifth Avenue in the heart of Manhattan. The paper highlights collaboration between the geotechnical

  • DFI
    Capitol Complex Phase 1 Expansion

    By Eric S. Lindquist, Charles A. Luxford

    The State of Texas recently adopted a master plan to expand the existing Capitol Complex in Austin. Phase 1 of this expansion will add two new State office buildings and five levels of underground par

  • DFI
    Self Hardening Slurry Wall Installation By Hydromill At The Herbert Hoover Dike ? An Innovative Solution

    By Mario Mauro

    In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehabi

  • DFI
    The Choice between HSDT and RLT: Selection Criteria for Concrete Pile Testing

    By P. Middendorp, Gerald E. H. Verbeek

    "INTRODUCTIONStatic Load Testing (SLT) is generally considered the pile testing method that provides the de-facto answers regarding pile capacity and load-deflection behavior. However, as this testing

    Jan 1, 2006

  • DFI
    High Capacity Drilled Piles in Brooklyn

    By Ahmed Elmekati, Frederick C. Rhyner, Steven R. Lowe

    "The current phase of the Pacific Park development (formerly, Atlantic Yards) in Brooklyn involves constructing buildings on a platform over an existing LIRR rail yard. To preserve the maximum amount

    Jan 1, 2016

  • DFI
    Case Histories of Circular Secant Pile Access Shafts for Tunnels

    By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann

    Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The

    Jan 1, 2019

  • DFI
    Foundations Of The 'Kö-Galerie' In Düsseldorf Using Top/Down Building Technologies

    By P. Arz

    With a total of five basement levels, ground floor and a further six levels above grade, construction of the Kö-Galerie building, on the Königsallee, in the centre of Düsseldorf, was completed with al

    Jan 1, 1989

  • DFI
    What It Takes (Geostructurally) To Extend The Plane Train Tunnel Under The World'S Busiest Airport

    By Ryan T. Smith, Anthony Sahj, Alexander T. Darnell

    Every second can count when trying to board a departing flight or catch a ride-share to your final destination. Hartsfield-Jackson Atlanta International Airport is in the midst of a project that aims

    Oct 1, 2022

  • DFI
    Top-Loaded Bidirectional Test, a New Approach to Deep Foundations Load Testing

    By Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam

    The Top-Loaded Bi-Directional Test (“TLBT”) is a new method to apply bi-directional loads to a deep foundation element with the loading source located above the foundation head. In the TLBT reusable l

    Sep 8, 2021

  • DFI
    Construction Of The Drilled Shaft Foundations For The Huey Long Mississippi River Bridge, New Orleans

    By Dan A. Brown

    The foundations at the Huey P. Long Bridge in New Orleans presented special challenges for construction due to the requirements for very deep drilled shafts in the Mississippi River beneath the existi

    Jan 1, 2010

  • DFI
    Characteristic Features of Deep Excavations in the Metropolis and the Probable Hazards.

    By Sudhir Kumar Das

    "The exorbitant price of the land in the metropolis has restricted the horizontal expansion and compelled the owners, the developers and the engineers to opt for vertical expansion. This has resulted

    Jan 1, 2015

  • DFI
    Inspection and Observation Methods

    "Full time inspection of drilled shafts by qualified personnel is a necessary part of construction. Detailed inspection procedures for routine inspection are provided in the Drilled Shaft Inspector’s

    Jan 1, 2004

  • DFI
    Numerical Evaluation of Top of Rock Profile, Rock Strength and Conductivity.

    By Zhang Wengang, L. John Endicott

    The properties of many geological materials are variable. This is especially true for variations in elevation of the top of rock profile, strength of weathered rock, and conductivity of rock masses. O

    Jan 1, 2019

  • DFI
    Numerical Study On Behavior Of Unreinforced And Reinforced Disconnected Piled Raft Foundation

    By P. Seethalakshmi, Yatakuri Yaswanth Naidu

    The use of a single pile, group of piles with pile cap, piled raft foundation system, etc., are prevalent in transferring the superstructure load from the soft soil layers to the firm underground laye

    Sep 1, 2022