Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Ground Control and the Inundation of the Retsof Mine

    By Vincent A. Scovazzo

    On March 12, 1994, the 1,100-foot deep 2 Yard South panel of the 1l0 year-old Retsof Mine collapsed. At the time of this occurrence, the Retsof Mine was characterized as the world's largest, most

    Jan 1, 1997

  • SME-ICGCM
    Pillar Strength and Design Methodology for Stone Mines

    By Gabriel Esterhuizen

    Underground stone mines in the United States make use of the room-and-pillar method of mining. A prerequisite for a safe working environment is that the pillars should adequately support the overburd

    Jan 1, 2008

  • SME-ICGCM
    A First Step in Developing Standing Roof Support Design Criteria Based on Ground Reaction Data for Pittsburgh Seam Longwall Tailgate Support

    By Thomas Barczak

    Roof support systems are designed for roof control to prevent unplanned falls. It sounds logical and has been the conventional thinking in support design since supports were first installed. In orde

    Jan 1, 2008

  • SME-ICGCM
    Coal-Mining-Induced Seismicity in Utah?Improving Spatial Resolution Using Double-Difference Relocations

    By Kristineq Pankow

    The August 2007 Crandall Canyon mine disaster raised national awareness of mining-induced seismicity (MIS) in Utah as well as general interest in how seismic monitoring might improve mine safety in th

    Jan 1, 2008

  • SME-ICGCM
    Progressive Hangingwall Caving And Subsidence Prediction At The San Giovanni Mine, Italy

    By R. Balia

    The upper part of the "Contatto Ovest" orebody, at the San Giovanni Pb-Zn sulphur mine (Sardinia, Italy), is mined by a sublevel caving method. With increasing mining depth, a progressive caving of th

    Jan 1, 1990

  • SME-ICGCM
    Estimation Of Long-Term Stability Of Mine Pillars In Underground Pit

    By S. Yamashita

    Recently in Japan, unexpected degradation (surface subsidence) at old underground quarry sites, such as 'Ohya-Ishi' (pumice tuff) pit field has often been occurred. At these quarry sites, th

    Jan 1, 1996

  • SME-ICGCM
    Mine Stability Evaluation From Microseismic Activity (5cc6a13d-fd4e-4c74-a7d1-2213b7f2a1da)

    By Brian R. A. Wood

    Any defect activity resulting from an applied stimulus on a structure will generate a stress wave which travels in the medium under the laws of acoustics, thus the name of acoustic emission (AE). AE t

    Jan 1, 1992

  • SME-ICGCM
    The Back Pressures Associated With Resin Rock Bolt Installations And Methods To Control And Predict It (1a0250a7-1c1e-4686-8a66-dbfc2dd6e095)

    By Anthony S. Spearing

    The vast majority of the estimated 100 million rock anchors installed in mines in the USA per year use resin cartridges (Tadolini and Mazzoni, 2006). About 4.5 million per annum of these are bolts wi

    Jan 1, 2009

  • SME-ICGCM
    Innovative Tailgate Support For Heavy Ground: 11 Left Longwall Panel, Cyprus Shoshone Mine

    By Christopher C. Woomer

    Cyprus Shoshone Mine uses the longwall method to extract a deep, thick, pitching coal seam in the Hanna Basin of South Central Wyoming. The immediate, and main roof rock consists of weak, thinly-bedde

    Jan 1, 1995

  • SME-ICGCM
    Successful Application of Rock Bolt Support and Mechanised Depillaring in Difficult Roof Conditions at Tandsi Mine, Western Coalfields, India

    By D. C. Oldroyd

    Western Coalfield?s Tandsi Mine, has difficult support conditions and a history of roof falls, resulting in mining roadway widths and depths being restricted for safety reasons. Rock Mechanics Technol

    Jan 1, 2006

  • SME-ICGCM
    Integrated Instrumentation Method of Stress State, Material Property, and Deformation Measurement for Stress Control Method of Mining

    By Shosei Serata

    The application of conventional rock mechanics methods to complex ground is very difficult. Yet. In most underground mining, the ground is complex. Therefore. conventional methods are not only difficu

    Jan 1, 1986

  • SME-ICGCM
    Comparative Study Of Western US Longwall Panel Entry Systems

    By Khamis Y. Haramy

    This paper summarizes ground control studies of longwall panel entry systems in two Western U.S. coal mines. Presented are comparisons of in situ pressure change measurements and assessments of chain

    Jan 1, 1989

  • SME-ICGCM
    New Approach in Rock Bolting that Adds to Bearing Capacity and Yield of the Bolts without Increase to the Cost of the Technology

    By Victor Nazimko

    A new technique for reaming the holes has been tested. This technique is available for reaming a hole at its deep end creating an enlarged cavity that has helicoidal grooves oriented at less than 40 d

    Jan 1, 2008

  • SME-ICGCM
    Study Of Coal Fragmentation Under Conical Bit Indentation (151fd177-8c94-4b7d-bb78-001df228dd2a)

    By S. J. Jung

    A fundamental study of fragment size distribution and characteristics of fracture pattern is presented for the dynamic penetration of a conical bit into coal block. In this paper, damaged zones during

    Jan 1, 1989

  • SME-ICGCM
    Pillar Stability Issues Based on a Survey of Pillar Performance in Underground Limestone Mines (08bccb54-5d4b-443a-860e-90b5a6841ec3)

    By Gabriel S. Esterhuizen

    A survey of pillar conditions was carried out at 21 operating limestone mines that use the room-and-pillar method. The surveyed pillars were all located in rock that was classified as ?Good? to ?Very

    Jan 1, 2006

  • SME-ICGCM
    Stability of Slopes in Discontinuously Jointed Rock (4d3fd7d1-f3a8-44f5-b86c-03d96a9b1123)

    By T. M. Tharp

    Attempts to analyze the stability of slopes, foundations and underground openings in discontinuously jointed rock have generally assumed full joint continuity or ignored the role of stress concentrati

    Jan 1, 1984

  • SME-ICGCM
    An Applications Approach To Barrier Pillar Design For Improved Resource Recovery

    By John R. Koehler

    Available barrier pillar design methods do not adequately account for overburden caving characteristics, the timing and magnitude of associated load transfers, the occurrence of unusual geologic featu

    Jan 1, 1989

  • SME-ICGCM
    Factors Influencing the Occurrence of Coal Pillar Bumps at the 9-Right Section of the Olga Mine

    By David C. Oyler

    The Bureau of Mines conducted research at the 9-Right Section of the Olga Mine to determine the cause of bumps and aid in the development of appropriate control techniques. The purpose of this paper i

    Jan 1, 1987

  • SME-ICGCM
    Design Of Multi-Level Thick Seam Extractions Under Major Aquifers And Considering Spontaneous Combustion Risk

    By D. J. Reddish

    An understanding of the mechanisms that cause large seismic events in a deep mine provides a foundation for designing effective measures to reduce the incidence of these events, as well as reduce the

    Jan 1, 1996

  • SME-ICGCM
    The Investigation Of The Rock Mass Stressed-Deformed State Under The Conditions Of Floating Earth Presence In The Roof Of The Level Working

    By V. Bondarenko

    The forecasting of floating earth inrush into the working is to a great extent connected with the investigation of the rock mass stressed-deformed state around the working. The aim of such investigati

    Jan 1, 1996