Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Roof Bolting in Low Seam Mining with Thick "Stack Rock" Roof under High Horizontal Stress

    By Peter Zhang, Gary Deemer, Rod Lawrence, Scott Peterson, Scott Wade, Mike Mishra, Rick Smith, Robert Bottegal, Ed Zeglen

    "Thinly-laminated silty shale that falls like ""stack rock"" is always difficult to support in underground coal mines. With thin laminations of 2.5 to 52 mm (0.1 to 2 in) thick and weak bonding betwee

    Jan 1, 2010

  • SME-ICGCM
    Roof Span Design for Underground Stone Mines

    By Essie Esterhuizen, John Ellenberger, Dennis Dolinar

    "Underground stone mines in the United States use the room-and- pillar method of mining. The stability of the roof between pillars determines the mining dimensions and size of equipment that can be us

    Jan 1, 2010

  • SME-ICGCM
    Extending the Limits of Strata Bolting by the Use of Flexible Strand Rockbolts

    By Dennis R. Barratt

    Rockbolting is now used extensively as a method of primary support in UK coalmines. Over the past fifteen years an optimum bolting system has evolved, based on a high grade steel bolt and a very stro

    Jan 1, 1997

  • SME-ICGCM
    Mechanical Properties of Pizza Pans and Their Effectiveness in Underground Coal Mining

    By Brian Daniels, James Farroni

    "Draw rock (small rock that forms/falls when bolting the roof and/or rib) is the cause of numerous injuries annually. These injuries result in lost work hours and low morale. The report below explains

    Jan 1, 2010

  • SME-ICGCM
    Evaluation Of Polyurethane Injection For Beltway Roof Stabilization In A West Virginia Coal Mine (4376a6c8-d15e-4751-9754-663f60fbf3a4)

    By Gregory Molinda

    Extremely difficult ground conditions were encountered in the main belt entry in a room and pillar mine in West Virginia. Several generations of supplemental support, including cable bolts, cribbing,

    Jan 1, 2004

  • SME-ICGCM
    Trial of Small Gateroad Pillar in Top Coal Caving Longwall Mining of Large Mining Height

    By Kun Li, Shuaishua Yue, Huigui Li, Yuan Ruifu, Yongxiang Xu, Huamin Li

    "Coal seams in Tashan Mine of Datong Coal Group in China average 49.2 ft (15m) thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 12.5 ft

    Jan 1, 2015

  • SME-ICGCM
    Whole-Mine Subsidence over Tabular Deposits and Related Seismicity

    By William G. Pariseau, Michael K. McCarter

    "The challenge of estimating mine-wide subsidence and linkages to seismicity over tabular deposits is addressed by a special finite element technique (dual node - dual mesh). Subsidence and mine-induc

    Jan 1, 2016

  • SME-ICGCM
    Update: Analysis and Case Study of Impact?Resistant Steel Sets for Underground Roof Fall Rehabilitation

    By Dakota Faulkner

    Unexpected roof falls often occur in the entries or intersections of active mining sections in underground mines. For large roof falls (greater than 20 ft in height), it becomes dangerous and impract

    Jan 1, 2014

  • SME-ICGCM
    Study Of Quantitative Impacts To Ground Water Associated With Longwall Coal Mining At Three Mines Sites In The Northern West Virginia Area

    By Denise Y. Dixon

    The objectives of this study were to (1) document the hydrologic impacts of longwall mining on ground water, (2) identify the factors which affect the extent of dewatering, and (3) develop empirical t

    Jan 1, 1988

  • SME-ICGCM
    Simulation Test on Accumulation Laws of Paste-Like Slurry in Cavity Goaf of a Coal Mine

    By Boqiang Wu, Ganggang Xu, Xiaodong Wang, Hai Wang, Shibin Zhu

    "Using a paste-like slurry as a filling from the ground surface to the goaf, artificial pillars can be built in the cavity goaf to support the goaf roof to prevent roof collapse and ground subsidence.

    Jan 1, 2018

  • SME-ICGCM
    The Initial Collapse of the Overburden Over Longwall Panels

    By Gennaro Marino

    Documented case histories are studied where data were found on the initial collapse of the overburden above the longwall panels. Under this scenario, the most controlled conditions exist for assessing

    Jan 1, 1987

  • SME-ICGCM
    Field and Laboratory Studies for Mechanised Depillaring Under Easily Caveable Roof Strata

    By Ashok Kumar, Rajendra Singh, Arun Kr. Singh

    "A simple analysis of site conditions and capability of the mechanised depillaring (MD) operation found that this approach is suitable to address the strata control issues in coal pillar extraction un

    Jan 1, 2018

  • SME-ICGCM
    Research on Abutment Pressure Distribution for Longwall Face Mining Through Abandoned Gateroads

    By Peng Cao, Jimin Su, Yang Li

    "Abutment pressure distribution is different when a longwall panel is passing through the abandoned gateroads in a damaged coal seam. According to the geological conditon of panel E13103 in Cuijiazhai

    Jan 1, 2018

  • SME-ICGCM
    Illinois Basin Coal Geology and Roof Control

    By Marvin B. Thompson

    "The depositional model for major Illinois Basin coalbeds is well documented and defined on a regional scale. The model was a driving force during past exploration for lower sulfur and thicker coal de

    Jan 1, 2010

  • SME-ICGCM
    Optimization Of District-Wide Mine Layout In Multi-Seam Mining: A Case Study

    By Huamin Li

    Mine # 8 of Pindingshan Coal Group, Henan Province, China has an annual production 2 million metric tons. But it encounters many problems, e.g. mine layout is complicated, roadway maintenance is diffi

    Jan 1, 2000

  • SME-ICGCM
    Stability Analyses and Remediation of Two Mined?Out Coal Seams Adjacent to a Building

    By Gennaro G. Marino

    As part of the development of a shopping center in West Virginia, a significant bench had to be cut into a mountainside that was over 700 ft. high. As a result, a steeply stepped, over 400-ft.- high w

    Jan 1, 2013

  • SME-ICGCM
    Analysis of Gateroad Stability at Two Longwall Mines Based on Field Monitoring Results and Numerical Model Analysis

    By David F. Gearhart, Mark Van Dyke, Heather Dougherty, Ted Klemetti, Gabriel S. Esterhuizen

    "Coal mine longwall gateroads are subject to changing loading conditions induced by the advancing longwall face. The ground response and support requirements are closely related to the magnitude and o

    Jan 1, 2018

  • SME-ICGCM
    Photogrammetric Monitoring of Rock Mass Behavior in Deep Vein Mining

    By Donovan J. Benton

    Photogrammetric methods are advancing rapidly and show considerable promise as a ground control research tool. The ability to quickly capture three-dimensional geometry, especially changes in geometr

    Jan 1, 2014

  • SME-ICGCM
    Introduction of a New Superior Coating on Ground Support Products

    By Renn Oler

    Corrosion can often cause significant strength reduction and failure of steel rockbolts, thus demanding continuous rehabilitation and posing challenges to underground mines in maintaining long term gr

    Jan 1, 2014

  • SME-ICGCM
    Understanding the Connection between Blasting and Highwall Stability

    By R. Quentin Eades, Kyle Perry

    "Surface mines continue to implement highwalls for several reasons, such as increasing recovery, improving margins, and justifying higher stripping ratios. Highwall stability is a complex issue that i

    Jan 1, 2018