Search Documents
Search Again
Search Again
Refine Search
Refine Search
- 
                    
                Dewatering of Mine Waste Using Geotextile TubesBy Gökhan Çevikbilen, Ümit Karadoğan, Sevde Korkut, Berrak Teymur
This study proposes a methodology for dewatering of mine waste using a multistage process, combining geotextile tubes and anionic polyacrylamide (PAM), which accelerates the recycling process of water
Sep 29, 2022
 - 
                    
                Ordered Rock Mass Properties - I. Introduction - A. ScopeBy Lawrence Adler
The properties of a geologic mass may be considered from a resource or an engineering viewpoint. The primary engineering applications include ground control, excavation, bulk handling, and hydrology.
Jan 1, 1973
 - 
                    
                Mineral Policy in IrelandBy Anthony Leddin, Gillian Dooley
This paper is concerned with mineral policy in Ireland and how it might be improved to encourage more exploration and investment in mining in the country. The approach is to first outline the main des
Jan 1, 2005
 - 
                    
                Flaw Detection In Mine Hoist Transportation SystemsBy Dennis N. Poffenroth
One concern of the Mine Safety and Health Administration is the structural integrity of steel wire ropes used on mine personnel hoists and elevators. Failure of such ropes has resulted in loss of life
Jan 1, 1982
 - 
                    
                Exploration Of P.T. Inco's Nickel Laterite Deposits In Sulawesi, IndonesiaBy H. O. Harju
In July 1968, P.T. Inco Indonesia was granted a Contract of Work to explore and develop the nickel laterite resources on the southeastern peninsula of the island of Sulawesi. Since 1970, exploration h
Jan 1, 1979
 - 
                    
                Construction of the Lewis Street CSO Tunnel, Nashville, TennesseeBy Patrick J. Doig
The Lewis Street CSO Tunnel is an important element in the efforts of the Metropolitan Government of Nashville and Davidson County (Metro) to improve the treatment of waste-water in the area. The t
Jan 1, 1997
 - 
                    
                Bureau Contribution To Slope Angle Research At The Kimbley Pit, Ely, NevadaBy Robert H. Merrill
In 1960, the Kennecott Copper Corp. and the U.S. Bureau of Mines entered into a joint research program to determine the changes in stress, strain, and displacement created by changes in slope angles.
Jan 1, 1968
 - 
                    
                Multi-Step Thermodynamic Calculation for Copper Dross Bath Smelting Process "Mining, Metallurgy & Exploration (2021)"By Tianzu Yang, Weifeng Liu, Lin Chen, BOYI XIE, DUCHAO ZHANG, HUI XIAO
The oxygen-rich bath smelting process of copper dross was simulated using Factsage software. It was found that the two-step simulation results agreed better with the industrial data, especially in the
Oct 19, 2020
 - 
                    
                Consequences Of The Forest Service Cercla Action At Mansfield CanyonBy R. M. Corn
The Non-Time Critical Forest service CERCLA Action at Mansfield Canyon, Santa Cruz County, Arizona designated previous locators of unpatented mining claims as owners/operators of the Hazardous Waste F
Jan 1, 2000
 - 
                    
                Dispute Review Boards -- Current Status And RecommendationsBy Robert M. Matyas, P. E. Sperry, Robert J. Smith, A. A. Mathews
INTRODUCTION The first Dispute Review Board (DRB) was utilized on a tunnel project 20 years ago. Increasingly utilized on a wide range of construction projects, DRB's are becoming the norm on
Jan 1, 1995
 - 
                    
                Ultra-Long Tunnel Drive with TBM for the Construction of the Mineral Transport for the Woodsmith Project Polyhalite Mine - NAT2024By Karin Bäppler
A new polyhalite fertilizer mine is currently being developed in the UK by Anglo American Crop Nutrients. The project includes the construction of a Mineral Transport Tunnel almost 37 kms long to hous
Jun 23, 2024
 - 
                    
                A Discussion on Design Methods to Improve Long-Term Performance of Tunnel ProjectsBy Lei Fu
In the wake of the collapse of the ceiling panels in the I-90 section of the Central Artery/Tunnel (CA/T) Project in 2006, the long term performance of tunnels became the focus of the tunneling indust
Jan 1, 2008
 - 
                    
                Cresson Mine: Case History of a Rapidly Evolving Mining ProjectBy Jeffrey A. Pontius
The Cresson gold deposit is in the southcentral portion of the Cripple Creek mining district in central Colorado (Fig. 1). The deposit is hosted by a series of 32 Ma (Kelley, 1995) felsic to mafic, a
Jan 1, 1996
 - 
                    
                Dry Coal Separation With A Vibrated Air-Dense Medium Fluidized Bed - Preprint 09-112By M. Fan
Dry coal separation technology has particular advantages in the applications in arid and cold regions, or low rank coal separation. The hazardous pollutants in low rank coals can not be efficiently re
Jan 1, 2009
 - 
                    
                Commercialization Of Oil Shales Via In Situ Retorting-Some ConsiderationsBy Hemendra N. Kalia
Several attempts have been made in the past sixty or so years to commerciliaze the vast oil shale deposits of the United States of America. However, the industry has yet to become viable and economic.
Jan 1, 1983
 - 
                    
                Tunneling Under Highway 401: Construction of Large Diameter Pre-Support Pipe Canopy - RETC2021By Tyler Lahti, Peter Borgacci, Mary Jane Ferraro, Prakash Nadesparan
Toronto Tunnel Partners (TTP), under contract to Metrolinx/IO, is constructing new twin rail tunnels under the Highway 401 & 409 interchange to accommodate additional tracks to support the GO Expansio
Jun 13, 2021
 - 
                    
                Selective Flocculation And Flotation Of Some Fine Grained Michigan Iron OresBy D. W. Frommer
In continuing its long range studies of methods of treating low-grade iron ores, the Bureau of Mines has developed a new selective flocculation, desliming, and flotation procedure that enables effecti
Jan 1, 1964
 - 
                    
                Discussion - An open-pit production scheduler : algorithm and implementation - by M. E. Gershon Technical Papers, MINING ENGINEERING, Vol. 39, No. 8 August 1987, pp. 793-796By C. J. Hall
I would like to congratulate Professor Gershon on an idea that is obviously valuable and is certainly new to me. It has, however, to be further developed, in that one can get fallacious results by lim
Jan 1, 1988
 - 
                    
                Long-Range Planning Commission - Report of the Educational Activities CommitteeBy Thomas V. Falkie, Howard L. Hartman, Bruce R. Palmer, Donald W. Gentry, John E. Frost, Peter T. Luckie, Michael K. McCarter, Lee W. Saperstein
Education in the mineral engineering professions is in the same flux and turmoil as is the entire minerals industry. Overcapacity in some areas, undercapacity in others, and the constant fear of subst
Jan 6, 1984
 - 
                    
                Caldecott Improvement ProjectBy William W. Edgerton
The California Department of Transportation (Caltrans), the Contra Costa Transportation Authority (CCTA), and the Alameda County Congestion Management Agency (Alameda CMA) are involved in a unique par
Jan 1, 2008