Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Deep Foundation Solutions And Implementation For Pittsburgh International Airport Midfield Terminal ? 1.0 Introduction

    By Peter Florian

    At 5:50 am on October 1, 1992, the new $800 million Pittsburgh International Airport Midfield Terminal opened its gates to the world after five years of construction and more than 24 years of planning

    Jan 1, 1993

  • DFI
    Methods Of Constructing Concrete Piles On Heavily Contaminated Sites

    By N. C. Matheson

    The West's Shell Pile has been used on sites with very soft ground conditions for over 60 years. Fibre reinforced precast concrete shells 900mm long are threadled onto an internal mandrel which c

    Jan 1, 1989

  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999

  • DFI
    Critical Evaluation of Indian Standard for the Design of Laterally Loaded Piles

    By Sanket Rawat, Ravi Kant Mittal, Vikash Prasad

    "The understanding of the response of pile foundations under various types of loads is a necessary prerequisite to analyze and design them properly. Therefore, this paper highlights and compares the p

    Jan 1, 2017

  • DFI
    Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge Consortium

    By Jacob Chacko

    The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten

    Jan 1, 2011

  • DFI
    Pile Load Test On 1200 Mm Dia Pile In Cemented Soil - Synopsis:

    By B. Ramanathan

    The results of a pile load test on a 1200 mm dia and 25 m long bored Cast-in-situ pile in soft rock is reported. The subsoil has a high N value of above 60 from 7 m to 21 m. The soft rock was observed

    Jan 1, 1996

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field Work

    By Darrell L. Beddard

    Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai

    Jan 1, 1996

  • DFI
    Case History Of The Support Of Excavation System At The Dulles Automated People Mover (DAPM) Tunnels And Stations

    By Marlion T. McQuinn

    This paper will discuss the design, construction, and performance of the support of excavation on the Dulles East and West Automated People Mover Tunnels and Station projects. The elements of the sys

    Jan 1, 2006

  • DFI
    The Realities Of Foundation Engineering ? Synopsis

    By J. O. Osterberg

    The realities of foundation enginering are that the work never proceeds exactly as expected. The various reasons, exploration, design, construction, and legal are discussed. Case histories are present

    Jan 1, 2010

  • DFI
    Ultimate Soil Pressures For Pile Groups In Soft Clay Subjected To Lateral Soil Movements

    By L. F. Miao

    Studies were carried out to investigate the ultimate soil pressure acting on pile(s) undergoing lateral soil movement in soft clay. A special apparatus has been designed to apply a uniform rectangular

    Jan 1, 2008

  • DFI
    Non-Conventional Practice: Recent Case Histories of the use of Vertical Buttress Piles in Deep Excavation Support

    By Tony Brunger, Abid O. Adekunte, George Munteanu, David Greentree

    A number of novel solutions have been proposed in recent years as alternatives to props and tie-backs in deep excavation support e.g. Adekunte (2008), Deschamps et. al. (2008), Adekunte et al. (2010)

    Jan 1, 2018

  • DFI
    250 M Ultra Deep Milled Diaphragm Wall: The New Frontier for the Cut off Wall Depth has Been Doubled by Trevi Group Technology

    By Maurizio Siepi, Stefano Trevisani, Pagliaccim Federico, Daniele Vanni

    "Abstract: The paper describes a large innovative project completed in 2012-20123 by Trevi Group, to develop equipment capable to install ultra-deep diaphragm wall. The project highlights the capacity

    Jan 1, 2014

  • DFI
    Upgrading Projects of Existing Infrastructures by Steel Piles – Press-in Method and Implant Structure

    By Tsunenobu Nozaki

    "AbstractThe PRESS-IN METHOD is widely recognised as “an environmentally friendly piling method”. However, this characteristic is only one of the fundamental advantages of the method and this paper pr

    Jan 1, 2014

  • DFI
    Shaft End Bearing Capacity In Cavernous Limestone

    By Issa S. Oweis

    Limestone is a sedimentary rock composed primarily of calcite (calcium carbonate). In the presence of an aqueous solution of carbon dioxide (carbonic acid) bicarbonate radicals (2HCO3)- are produced t

    Jan 1, 2009

  • DFI
    In-Situ Permeability Testing For Cement-Bentonite Cutoff Wall ? Lessons Learned

    By François G. Bernardeau

    Cement-bentonite (C-B) slurry walls have been used for ground water cutoff in deep excavations, contamination containment, and other applications. Hydraulic conductivity is of great concern for cement

    Jan 1, 2008

  • DFI
    Integrity Testing Of Deep Foundations - Synopsis

    By R. T. Stain

    Integrity testing of deep foundations is now common practice in Europe, indeed in the City of London such testing is a contractural requirement on every site. This paper is in two parts: Part

    Jan 1, 1987

  • DFI
    High-Capacity Rock Anchors Provide Uplift Resistance For Concrete-Filled Steel Pipe Piles - A Case Study

    By James Weaver

    During the past 16 years, the authors have successfully used high-capacity rock anchors installed inside open-ended pipe piles, driven to bedrock, to provide uplift and overturning resistance for vari

    Jan 1, 2011

  • DFI
    Static-Load Hydraulic Piledriving: An Alternative System For Noise & Vibration-Sensitive Applications ? Introduction

    By Robert A. Field

    Static-Load Piledriving systems utilize hydraulic push to advance piles into the ground. Dynamic systems (ie. hammers and vibratory equipment) utilize impact, or vibration, to advance the piles. S

    Jan 1, 1995

  • DFI
    Underpinning Support Pipeline Compressor Station Founded On Timber Piles Potter, Ontario - DFI Conference, Toronto, Oct 1997 - Underpinning Support - Pipeline Compressor Station - Background

    By Brian Isherwood

    TransCanada Pipelines, Calgary (TCPL) is one of North America's leading transporters of natural gas through its energy transmission business. TransCanada also operates significant complementary b

    Jan 1, 1997

  • DFI
    Design Of The Drilled Shaft Foundations For The Cooper River Bridge

    By Liang Shen

    The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South

    Jan 1, 2013