    High Strain Testing Of Large Diameter, High Capacity Unlined Bored Piles ? Introduction

    By Dhanvin B. Mehta

    Pile testing is generally understood as static load test. It is our common experience that for high capacity, large diameter bored piles, static testing is expensive and time consuming. It is practica

    Jan 1, 1996

  • DFI
    Advancing Severe Flood-Related Engineering Knowledge

    By Anne Lemnitzer

    When a major storm system stalled over Western Europe last summer, it pro- duced the deadliest flood on European territory in the last two decades. Beyond record-setting rainfall over countries such

    Feb 1, 2022

  • DFI
    CPT Role in Rigid Inclusion Design and Quality Assurance

    By Jesus Gomez, Mary Nodine

    Rigid inclusions are widely used in the U.S. as a ground improvement tech- nique, particularly for industrial, low- rise and highway applications with poor subsurface conditions, where control of sett

    May 1, 2023

  • DFI
    Sustainable Cement for Greener Foundations

    By Greg Halsted, Joshua Gilman

    Today's civil and geotechnical engineers play an important role in helping to achieve sustainable infrastructure. To address environmental sustainability and climate change caused by green- house gas

    Jan 1, 2023

  • DFI
    Making Expansion Possible: Mayo Clinic

    By Nathan Iverson, Allie Brady

    Located on rolling bluffs on the Zumbro River's south fork in Southeast Minnesota, Rochester is the state's third largest city and is the home and birthplace of the renowned Mayo Clinic, a nonprofit a

    Jan 1, 2023

  • DFI
    Effect Of Curing Stresses On The Mechanical Properties Of Soil-cement Mixed Materials

    By George Onorato, Giovanni Bonita

    Deep soil mixing (DSM) has now become a ubiquitous ground improvement technique across the globe for producing soil-cementous materials for many types of complex civil and environmental applications.

  • DFI
    Long, High-Capacity Ground Anchors for Soldier Pile Walls

    By Bryan Bet

    Retaining wall systems of soldier pile ground anchors (SPGAs) have been used for many decades to stabilize landslide activity. Due to successful use of these walls to address slope instability on the

    Jul 1, 2022

  • DFI
    Foundation Reuse Is the Future

    By Andy Boeckmann

    Engineers and owners widely recognize the benefits of foundation reuse - cost savings, reduced construction schedules and reduced environmental impacts, among others. Yet for many projects with existi

    Jul 1, 2022

  • DFI
    Innovative Methods Of Dealing With Contaminated Soils In Drilled Shafts - Synopsis

    By William F. Loftus

    When high capacity diameter pipe piles are driven open-ended into the underlying bedrock, the material gathered inside the pipe often must be excavated to allow concrete to be placed within, in a clea

    Jan 1, 1996

  • DFI
    Deep Soil Mixing Use in Poland

    By Michal Topolnicki

    Deep Mixing Series: This article is the second keynote highlighted from DFI's virtual Deep Mixing Conference in 2021, for which Topolnicki served as a committeee co-chair Polish applications of deep s

    Apr 1, 2022

  • DFI
    Theoretical Simulation Approach For Load Settlement Characteristics Of Piles In Shale Deposits. - Synopsis :-

    By Subrata Ray

    A large no of power stations are being set up in Chandrapur area having coal deposits. Several industries are also coning up in this area. The subsurface is geologically formed under Gondwana system a

    Jan 1, 1996

  • DFI
    Session 19 "Compensation Grouting"

    By Douglas Heenan

    The fracture orientations were inferred based on theory and previous experience. The fracture pattern was not monitored during the project. Grout volume was recorded at each sleeve port and real time

    Feb 10, 2003

  • DFI
    Diplomacy And Innovation: Octakong And The Hong Kong-Zhuhai-Macau Bridge Project

    By David White

    When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau a

  • DFI
    Diplomacy and Innovation: Octakong and the Hong Kong-Zhuhai-Macau Bridge Project

    By David White

    "When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau

    Jan 1, 2017

  • DFI
    Vibrodriving And The Compaction Of Granular Soils

    By RAP Bement

    Installation by vibrodrivers of sheet and bearing piles generates periodic vibrations in the surrounding ground, which have been widely measured and reported. One of the possible consequential effects

    Jan 1, 1996

  • DFI
    Studies On Pile Driving Cushion Materials ? Synopsis

    By H. R. Shen

    Cushion materials are one of the most important links in an efficient piling system. In the past, little has been done in China on this problem, so engineers are still used to those traditional woods,

    Jan 1, 2010

  • DFI
    Reliability Approach For Deep Foundation Studies ? Synopsis

    By R. Chowdhury

    The relevance of reliability studies for deep foundations is considered in this paper with special reference to pile foundations. Attention is drawn to uncertainties related to applied loads, the load

    Jan 1, 2010

  • DFI
    Exploring the Historical Development of Geotechnical Engineering

    By Thomas Kennedy, Michael Bennett

    "History never repeats itself, but it often rhymes." The old aphorism reflects how the study of the past may, perhaps, be most widely valued when it can be used to improve current and future decision

    Jan 1, 2023

  • DFI
    Piled Raft System - Approximate Design Methods. - Synopsis

    By S. L. Karunakaran

    There are cases where it is found that a raft foundation would have adequate factor of safety against ultimate bearing capacity failure but the settlements would be excessive. Piles may be introduced

    Jan 1, 1996

  • DFI
    Ground Improvement For The Deep Foundation Of A 650 M Long Quay Wall In The Port Of Hamburg

    By Peter Arz

    In the port of Hamburg a 650 m long quay wall was completed in mid-1985. The watertight wall consists of loadbearing steel buttress piles PSP 1012 which are up to 28 m long and infill interlocking she

    Jan 1, 1987