Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Augered Cast-In-Place Pile Load Tests On The Cincinnati, Ohio/Northern Kentucky Riverfront

    By Theodore W. Vogelpohl

    Augered cast-in-place piles have proven to be effective, adaptable and economical for projects throughout the Ohio River Valley. Specifically, they have been used extensively for high-rise structures,

    Jan 1, 2005

  • DFI
    Underwater Concrete In Drilled Shafts: The Key Issues And Case Histories

    By Sam X. Yao

    In construction of drilled shafts under water, placing concrete in the shafts is technically demanding and involves complex construction logistics. Past construction experience has demonstrated that h

    Jan 1, 2013

  • DFI
    New I-95 Woodrow Wilson Bridge Foundations

    By Roderic A. Ellman

    The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.

    Jan 1, 2009

  • DFI
    Session 18 "Grouting for Micropiles & Anchors"

    By Jim Bruce

    No answer required. From the drilling equipment suppliers, but the specifications must be tailored to be project-specific. Yes, the sonic technique is very interesting as we said, and it is not so muc

    Feb 10, 2003

  • DFI
    Excavation Techniques For Underground Drinking Water Pipe Line With Micro Piles As A Special Application

    By Andhra Pradesh, Nagarajkumar B. V

    As a part of Mumbai City Mega Drinking Water Project at Amar Mahal Tunnel-1 Ghatkopar East Mumbai, drinking water tunnels were proposed by MCGM from Amar Mahal to Trombay reservoirs, Amar Mahal to Wad

    Sep 1, 2022

  • DFI
    Design Build & Failure: Perils at a High Risk Shoring and Retaining Wall Project.

    By Mark Spence, Tom Lardner, Matthew Janes

    "IntroductionThe design-build method streamlines project delivery through a single contract between the Contract manager and the design-build team. The design-build method places emphasis on collabora

    Jan 1, 2015

  • DFI
    CFA Secant Piling In California

    By Philip Derbyshire, Dale J. Scheffler

    "Continuous Flight Auger (CFA) piling is a variation of Augered Cast-In-Place (ACIP) or augercast piling. In both cases a continuous auger with a hollow stem is used to drill a hole and a pile is form

    Jan 1, 2005

  • DFI
    New Technique To Drive Piles By Impact Hammer Inside The Pile - Synopsis

    By Djk Arentsen

    A new technique to drive tubular piles by impact hammer inside the pile has confirmed a dramatic reduction of noise and the opportunity to save steel. Also a reduction in driving time and a higher bea

    Jan 1, 1996

  • DFI
    Stone Column Ground Improvement – A Trial in Silty Sands

    By Ana Pereira, Naomi Norris, Donald Bruggers

    The city of Christchurch, New Zealand is predominantly founded on alluvial sediments consisting of interbedded layers of loose to medium dense sand, soft to stiff silt and clay mixtures, and pockets o

    Jan 1, 2019

  • DFI
    Development Of Vertical-Horizontal Yield Envelopes Of Pile Group Supported Bridges Subjected To Scour

    By Aditi Sharma, Sumanta Haldar

    Scouring of soil is the major concern forthe various hydraulic structures built in the flowing rivers since scouring impacts the bearing capacity of foundations. Hence, consideration of scouring in th

    Sep 1, 2022

  • DFI
    Post-Katrina Emergency Interim Flood Protection

    By Fred Fuchs

    "Most deep foundation work is either unseen by the general public or viewed as an inconvenience in their daily lives. Hurricane Katrina changed that perspective for everyone in New Orleans — and many

    Jan 1, 2008

  • DFI
    Using Seismic Tomography To Evaluate Foundation Structures

    By Ed Kase

    Cross-hole sonic logging (CSL) has become the universal standard, nondestructive testing (NDT) method used in evaluating the integrity of foundation structures to maintain quality assurance and qualit

    Jan 1, 2003

  • DFI
    Session 24 "Compaction Grouting and Consensus Guide"

    By Richard Berry

    The spacing of grout injections is typically about 2 to 2 V½ meters if the purpose of the grouting is densification of the in-situ soils. Hole spacing will vary with the in-situ soil properties and th

    Feb 10, 2003

  • DFI
    Construction Of A Pre-Founded Anchored Wall, Monitoring Of Execution Based On The Eurocode 7 Observation Method, And Taking Account Of The Transmission Of Seismic Forces In The Retaining Structures Towards The Buildings Structure

    By Denis Huber

    The technical assessment of the final works on the "Stéphany Palace" project at Menton in France's Alpes-Maritimes region shows the importance of daily project monitoring based on the observation

    Jan 1, 2002

  • DFI
    Producing Sealing Walls And Sealing Slabs By Applying The Soilcrete Process

    By E. W. Raabe

    The paper discusses the increasing role of specialist grouting techniques to form water seals or cut-offs for deep basement construction. Raabe and Toth discuss the various grouting methods available

    Jan 1, 1989

  • DFI
    Comparison of Numerical Predictions Using P-Y Curves and Finite Element Analyses of Monopiles of Ocean Energy Converters under a Very Large Number of Low Amplitude Lateral Load Cycles

    By Deepak Pappusetty, Miguel A. Pando

    This study is motivated from the increased interest in recent years to explore use of Ocean Energy Converters (OEC’s).OEC’s can be tidal or generate electricity from wave or current action. Design of

    Jan 1, 2015

  • DFI
    Resonance Pile Driving with Zero Ground Vibration

    By Mark Johnson, Mathew Janes

    "The Resonator RD 260 Resonant Pile Driver delivers ground disturbance free, high production pile driving. The Resonator has recently been used on numerous production pile driving sites in the Netherl

    Jan 1, 1900

  • DFI
    Heating and Cooling Structures with Steel Pile Foundations - Closed Loop Standing Column Well Technology (df25801f-7df6-457c-ab18-569c2a6ce07f)

    By Paul Suver

    "The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing c

    Jan 1, 2017

  • DFI
    Design And Construction Of Micropiles Each Subject To 110 Kips Of Lateral Load

    By Andrew Baxter

    The Crystal Bridges Museum of American Art in Bentonville, Arkansas is a beautiful glass and concrete structure cut into a valley that mingles with water ponds spanned by multiple bridges with suspend

    Jan 1, 2008

  • DFI
    Drilled Pier Foundation In Hard Carbonate Rock ? Synopsis

    By K. E. Darnell

    Drilled pier foundations have long been a favored foundation type for heavily loaded structures. Drilled piers derive their load-bearing capacity from end-bearing, and/or sidewall friction. This type

    Jan 1, 2010