Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Reducing Mercury Production at Bald Mountain Gold Mine

    By Jim Wickens, Vince Lofftus, Mark Kravetz

    "This paper discusses how Bald Mountain Gold Mine (Ely, NV) dramatically reduced mercury production by treating process solutions with a liquid reagent based on organic sulfide chemistry. Cherokee Che

    Jan 1, 2001

  • CIM
    Predicting the penetration rate of percussive blasthole drills using coarseness index and median particle size

    By S. Kahraman, K. Develi, E. Yasar

    Four hydraulic top hammers, one pneumatic top hammer, and three down-the-hole drills were observed in several rock types at quarries and highway construction sites to measure the performance data. At

    Jan 1, 2004

  • CIM
    Hollinger Shaft Practice

    By V. J. Southey

    HOLLINGER mining operations have required development by 24 vertical shafts having a total length of 28,160 feet. Seventeen of these are sunk from surface and seven are interior shafts. Four surface s

    Jan 1, 1939

  • CIM
    Contrasting Styles of Gold Mineralization along the Grand Pabos-Restigouche Fault System: Implication for Carlin-like Au-mineralization in the Southwestern Gaspé Appalachians

    By André Chagnon, Michel Malo, Benoît Dubé, Chantal Pelchat

    "Abstract- In the southern Gaspé Appalachians, gold mineralization is spatially associated with the Acadian dextral strike-slip Grand Pabos-Restigouche fault system. Two different structurally-control

    Jan 1, 1998

  • CIM
    The Development of Process Mineralogy at Falcon Bridge Limited, and Application to the Raglan Mill

    By Norman O. Lotter, Lori Kormos, Greg J. Wilkie, Peter J. Whittaker, Johannes S. Stickling

    "Assessment of opportunities to improve mineral processing performance in existing concentrators and in describing undeveloped orebodies is key to improving the business case of a mining company. This

    Jan 1, 2002

  • CIM
    Deep Shaft Hoisting at Laronde - The Penna Shaft Hoisting Plant

    By Bennett McLaughlin

    AGNICO-EAGLE started sinking the Penna Shaft in 1995 with a hoisting plant capable of hoisting 1,800 tonnes per day from a 2,240 metre deep shaft. Exploration success lead to the installation of a hoi

    May 1, 2001

  • CIM
    Post Crunch Financial Management ?the Role of Agency Debt

    By Douglas Macaulay

    "The Work contains the personal views and opinions of the Author and in no manner should it be construed as reflecting the official position of Export Development Canada. The Author makes no represent

    May 1, 2010

  • CIM
    The Application of Simulation and Design-of-Experiments Techniques to the Optimization of Grinding circuits at the Heath Steele Concentrator

    By Donald Leroux, Lori Lynn Smith, Robert Hutchison

    "The grinding circuit of the Heath Steele concentrator was sampled under five different sets of operating conditions. The balanced results of the sampling campaigns were used to calibrate steady-state

    Jan 1, 1999

  • CIM
    Process Control... And Where Are We Going?

    By Brian Flintoff

    "When I was first asked to prepare this paper and presentation in late June, I thought it might be fun to ""step back and paint the bigger picture."" Having attempted to do this, fun is not the first

    Jan 1, 1998

  • CIM
    Meeting Today’s Challenge in Nickel Production: Reducing Operating Costs at Nickel Sulphide and Laterite Plants

    By A. E. M. Warner, A. Vahed, P. J. Mackey

    "Since early 2015, the price of nickel has dropped from the region of US$6/pound to current levels of around US$4.60/pound (March 2017), reflecting several market factors, but principally due to lower

    Jan 1, 2017

  • CIM
    Latest Development in Cathode Stripping Machines

    By M. Schmidt, P. Nord, M. Larinkari

    Cathode stripping machine technology has been developed significantly both in electrorefining (ER) and electrowinning (EW) applications in the last ten years. The main driver has been robotic cathode

    Jan 1, 2019

  • CIM
    Valorisation of Thermal Residues by Intensified Mineral Carbonation

    By D. Ling, Santos. R. M., T. Van Gerven, M. Guo

    The valorization of alkaline waste materials from thermal processes utilizing intensified mineral carbonation routes is investigated. The principal advantages of this approach are the chemical stabili

    Jan 1, 2011

  • CIM
    Stability of Pillars and Tabular Excavations under Shear Loading Conditions ? Implications for Mine Planning and Design

    By Fidelis T. Suorineni

    Rockbursts are a major hazard in deep hard rock underground mining and tunneling. To date a significant number of rockbursts still defy conventional explanations. A review of rockburst case histories

    May 1, 2011

  • CIM
    The Ecstall Story: The Employee Relations Department

    By Gerald R. Larocque, Donald F. Grenville

    "IN APRIL, 1965, the employee relations department (then called the personnel department) was established as a separate function within the company. Its aims and objectives were to hire an effective w

    Jan 1, 1974

  • CIM
    Hydrochloric acid leaching of an Elliot Lake uranium ore

    By G. M. Ritcey, K. E. Haque, S. H. Lucas

    "Laboratory-scale hydrochloric acid leach tests were conducted on an Elliot Lake uranium ore. Hydrochloric acid leaches without an oxidant or with molecular oxygen (i.e., air or pure oxygen gas) as an

    Jan 1, 1980

  • CIM
    Paragenesis of Fluorspar Deposits on the Southern Burin Peninsula, Newfoundland, Canada

    By B. A. Sparkes, J. H. Reeves

    "The St. Lawrence Granite hosts vein-type fluorite mineralization that was mined until 1977. Recent drilling identified a significant fluorite-bearing structure hosted in adjacent meta-sedimentary cou

    Jan 1, 2016

  • CIM
    FLAC Simulation of Split-Pipe Tests on an Instrumented Cable Bolt

    By Marc Ruest

    A new instrumented cable bolt has been developed by the National Institute for Occupational Safety and Health at the Spokane Research Laboratory in Spokane, WA. Although various instruments are availa

    May 1, 2002

  • CIM
    Deep Bed Thickener Operation at the EKATITM Diamond Mine

    By T. G. Paradis, C. A. Mohns

    "This paper summarizes the Wren CAT (Clarifier and Accelerated Thickener) deep bed thickener operation at the EKATITM Diamond Mine in Canada’s Northwest Territories. EKATITMs’ thickener project is pre

    Jan 1, 2000

  • CIM
    Supercharge Your Ore Testing and Characterisation with the JKRBT

    By Peter Rubie, Toni Kojovic, Fengnian Shi

    "Mining companies have recognized that characterization of ore breakage plays an essential role in the design and optimization of comminution circuits.Recently the Julius Kruttschnitt Mineral Research

    Jan 1, 2009

  • CIM
    Flowsheet development, commissioning, and start-up of the Voisey’s Bay mill

    By P. Langlois, G. Labonté, J. J. Barrett, J. Holmes

    "The Voisey’s Bay mill processes a high-grade pentlandite and chalcopyrite ore in a largely pyrrhotite/troilite matrix. From 1994 to 1997, circuit development focused on making a 14% nickel concentrat

    Jan 1, 2017