Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Blasting Practice in the East Bluff Section of the Britannia MineBy Chris G. Dobson
Introduction The Britannia mine is at Britannia Beach, on Howe sound, approximately thirty miles from Vancouver. The first claims were staked in 1898, and a local company was formed at that time to d
Jan 1, 1935
-
The Physical Nature of Solid Condensates Produced in the Distillation of Volatile MetalsBy I. I. Bethcherman
Introduction 1.-lmportance of Physical Nature of Condensates The metals of commercial interest which have reasonably high vapour pressures below 1,200° C. are mercury, cadmium, sodium, zinc, magnesi
Jan 1, 1951
-
Competition and Canadian coal prices in the Japanese coking coal marketBy Lorne Sivertson, Peter Kitrredge
"World metallurgical coal imports totalled 110million tonnes in 1978. Of this amount, Japan imported 50 million tonnes, making it by far the largest and most important coking coal market . British Col
Jan 1, 1980
-
The Frood-Stobie MineBy H. F. Zurbrigg
"The Frood-Stobie Mine is by far the largest metal producer in the Sudbury area. Its efficient development was made possible by the consolidation of three mining properties that covered parts of the s
Jan 1, 1949
-
The Bullmoose Mille ProjectBy R. Drozd
"The Bullmoose Mine is currently under construction in the North East Coal area of British Columbia, and approximately $300 million will be spent to bring this 2.3 million-tonnes-per-year metallurgica
Jan 1, 1983
-
Mine and tailings effluent treatment at the Kimberley, B.C. operations of Cominco Ltd.By W. J. Kuit
"Complex facilities which provide for the collection, management and treatment of effluents emanating from the Sullivan mine and concentrator tailings were made operational in October 1979. Key featur
Jan 1, 1980
-
Geology and age of the Kemess porphyry copper-molybdenum deposit, north-central British ColumbiaBy A. M. Cann, C. I. Godwin
"The Kemess porphyry copper-molybdenum deposit occurs in the Intermontane Belt of north-central British Columbia. The deposit is in andesitic to basaltic flows and tuffs which may be correlated with t
Jan 1, 1980
-
The Mechanical Aspects of Large Grinding MillsBy C. A. Roloff
Demands for increased grinding production, lower-grade are and limited capital have resulted in ever larger grinding mills, some as large as 36ft (/1 m) in diameter and 12,000 hp (8,950 kw). The resul
Jan 1, 1979
-
Treatment of ferro-manganese fines in an extended arc flash reactorBy A. McLean, D. K. A Donyina, R. S. Segsworth
"Various aspects of processing ferro-manganese fines generated during the crushing of standard ferro-manganese have been studied in laboratory-scaleplasma furnaces. These laboratory furnaces are based
Jan 1, 1982
-
Fe Skarn, Iron Oxide Cu-Au, and Manto Cu-(Ag) Deposits in the Andes Cordillera of Southwest Mendoza Province (34°-36°S), ArgentinaBy I. B. Schalamuk, R. E. de Barrio, M. J. Pons, M. B. Franchini, L. Meinert
"Several Fe, Fe-Cu, and Cu-Ag prospects hosted by Mesozoic carbonate-rich sedimentary rocks that were intruded by diorite stocks define an approximately 20 × 200 km belt along the Andes Cordillera of
Jan 1, 2007
-
Mine planning and design integrationBy Earl Gebhardt
The planning and design of mining panels in the Potash Corporation of Saskatchewan Inc., Lanigan Division mine Block B involved a number of investigative techniques. The techniques utilized to gain in
Feb 1, 1993
-
Coarse Potash Flotation Machine Design AdvancesBy J. B. Sabey, V. R. Degner, D. MacGillivray
"Hydrodynamics principals are applied to the design of a natural air ingestion flotation machine for coarse solids applications. Preliminary laboratory test data and subsequent operating plant flotati
Jan 1, 1986
-
Ventilation of Development Headings at the Sullivan MineBy O E. Weightman
This paper describes the methods used for the ventilation of raises, sublevels and drawholes at Cominco's Sullivan mine. The problems involved in ventilation during blasting, drilling and scrapin
Jan 1, 1965
-
Mineral Deposits Related to Major Structures in the Precambrian of ManitobaBy J F. Davies
A review is presented of the fundamental differences between the Superior and Churchill geologic provinces. Structure, lithology, grade of metamorphism and a single recent age determination suggest th
Jan 1, 1964
-
Role of Oxygen in Interfacial Phenomena during High Temperature ReactionsBy K. S. Coley, M. A. Rhamdhani, G. A. Brooks
Interfacial phenomena in high temperature reactions such as between iron alloy and slag is well documented but not fully understood. It is believed that a gradient of oxygen concentration plays an imp
Jan 1, 2004
-
Ceramic clays of the Cypress HillsBy LUKE O. LINDOE
A major clay products industry in the Medicine Hat area since before 1910 has maintained a continued interest in the clays of the Cypress Hills. For the first forty years the materials used were local
Jan 1, 1984
-
Mine planning and design integration (8b994481-1a73-40ce-ac2d-755d2a73f2cd)By Earl Gebhardt
"The planning and design of mining panels in the Potash Corporation of Saskatchewan Inc., Lanigan Division mine Block B involved a number of investigative techniques. The techniques utilized to gain i
Jan 1, 1993
-
Zero-Process-Ignorance in the Comminution Circuits, Why Not?By A. Bouajila1
Minerals processing organisations will be more and more under intense competitive pressure. Major changes are being experienced with intense respect to resources, processes, production strategies and
May 1, 2001
-
Rainfall-Induced and Structurally-Controlled Slope Failure and Rockfall Incidents along part of Werka Descent Road and Remedial Measures, North West of Saudi ArabiaBy B. H. Sadagah
"Construction of mountain roads at north westerly Saudi Arabia is a difficult task in rugged terrains, where the rock masses are steep slopes, and full of geomorphological constraints.Werka descent li
Jan 1, 2015
-
Performance of the Lomex 34-foot variable speed millBy J. G. Mieczaniec
"A key element for a successful mining operation is the grinding circuit. It must be reliable, maintainable and must perform to or above design capacities for 95% of the time. Once chosen and installe
Jan 1, 1985