Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Lithogeochemistry as a guide to identifying favourable areas for tile discovery of volcanogenic massive sulphide deposits

    By V. J. Sopuck, O. P. Lavin, Ian Nichol

    "A major challenge of contemporary exploration geochemistry is the development of procedures that can locate blind mineralization or mineralization that sub-crops below a cover of transported overburd

    Jan 1, 1980

  • CIM
    Inflows in Uranium Mines of Northern Saskatchewan: Risks And Mitigation

    By R. Bashir, J. F. Hatley

    ABSTRACT Northern Saskatchewan boasts some of the world’s largest known high-grade uranium deposits. The successful mining of these deposits cannot be accomplished without overcoming technical challen

    Jan 1, 2013

  • CIM
    Reclamation of Coal Mine Wastes in New Brunswick

    The major factors limiting the establishing of vegetation on the shale and sandstone wastes at Minto are high exchange acidity and low pH (shale pH 4-5, sandstone pH < 4). In the first revegetation pr

    Jan 1, 1977

  • CIM
    Current Research in Mine Equipment Automation in Australia

    By Michael Hood

    An overview is given of some of the major mining research activities in Australia. Automation of mining equipment is not an objective in its own right. The objective is to improve the safety and the e

    May 1, 2002

  • CIM
    Instauration des détonateurs électroniques à la mine Beaufor

    By Steve Simard

    Suite aux excellents résultats, obtenus avec la technologie des détonateurs électroniques dans des chantiers longs trous de grandes dimensions, nous avons décidé d?étendre cette technologie dans les o

    Oct 1, 2004

  • CIM
    Application Practice of Bottom Blowing Continuous Converting to Replace Copper P-S Converter

    By Hongfei Li, JianLong Wang

    This paper introduces the technical characteristics, transformation scheme and production practice of the project in which Copper P-S Converter was replaced by Bottom Blowing Continuous converting for

    Jan 1, 2019

  • CIM
    Recent Developments in Drilling Mud

    By R. B. Hyde

    "Severe drilling conditions and difficult mud problems are briefly out-lined as the major cost items in all production operations. The chief problems discussed are abnormal pressures, high temperature

    Jan 1, 1959

  • CIM
    Haile Gold Mine Metallurgy and Flowsheet Review

    By P. Tittes, M. Deal, M. Spicher, S. McDaniel, J. Wickens

    "Haile Gold Mine is located near Kershaw, South Carolina, approximately 50 miles south of Charlotte, North Carolina. Gold was first discovered at the site in 1827, and the property has been through se

    Jan 1, 2013

  • CIM
    Quantifying the Effects That Changes in Transmitter-Receiver Geometry Have on the Capability of an Airborne Electromagnetic Survey System to Detect Good Conductors

    By C. Samson, R. S. Smith, S. W. Hefford

    "Abstract - Time-domain electromagnetic systems are most sensitive to highly conductive targets during the transmitter on-time. Data collected during the on-time is highly influenced by the geometric

    Jan 1, 2006

  • CIM
    Column Flotation in an Oilsand Application

    By Kim Wiwchar, Elizabeth Mbaja, Lynne Dang, Jim Furey, Anita Marks

    "Suncor Energy Inc., located north of Fort McMurray, Alberta, commenced pilot scale operation using a CPT 4’ diameter flotation column in March 2003. This larger scale trial follows two previously suc

    Jan 1, 2004

  • CIM
    Information Strategy Planning on Nuclear Power Plant Project Management System

    By Son Hye Jin

    Abstract ? KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. ? We want to improve our construction project management process. ? So we are now developing the

    Aug 1, 2013

  • CIM
    The Greenhills surface coal mining project

    By Clifford Britch

    "Kaiser Resources Ltd. has completed feasibility studies resulting in approval of $277,500,000 for the construction of the Greenhills Surface Coal Mine, located 35 km north of Sparwood, B.C. The mine

    Jan 1, 1981

  • CIM
    Process Development for Milling B-Zone Ore at Rabbit Lake

    By S. Dicarlo

    "In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia

    Jan 1, 1988

  • CIM
    Advanced Process Control for Grinding Circuits

    By E. Gallestey, D. Groenveld, F. Kolb, M. Rozou

    "Recent copper price evolution pushes modern mining industry even harder to achieve highest production with maximum efficiency. Operations are bound by numerous contractual and environmental condition

    Jan 1, 2015

  • CIM
    Constrained Multivariable Control of a Pilot Flotation Column at the Laronde Concentrator

    By D. E. Calisaya, É. Poulin, A. Desbiens, R. del Villar, A. Riquelme

    "A 15 cm diameter by 732 cm height, fully automated pilot column was installed in the Agnico-Eagle’s Laronde concentrator (Québec), for evaluating the performance of newly developed sensors and advanc

    Jan 1, 2012

  • CIM
    Frother Analysis: Procedure and Plant Experience (9afbd8b8-3e71-4680-a005-b07f0c7c29ef)

    By Frank Cappuccitti, James A. Finch, Stéphanie Gélinas

    "A colorimetric technique, originally developed for methyl iso butyl carbinol (MIBC) based on the Komarowsky reaction, has been extended to a wide range of common mineral flotation frothers. The proce

    Jan 1, 2005

  • CIM
    "Linatex Dewatering Equipment in Selected North American Applications"

    By T. A. Kirk

    "The Linatex Dewatering System is a compact, low capital and maintenance cost matched set of processing equipment suitable for solids recovery, dewatering and desliming sand-like materials in the rang

    Jan 1, 1978

  • CIM
    Geophysical Case Study of the Gallen Deposit, Québec, Canada

    By D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, D. K. Fountain

    "As part of a larger research program, a number of MEGATEM airborne electromagnetic (EM) test flights were flown over the Gallen massive sulfide deposit in northwest Québec. A particularity of this te

    Jan 1, 2007

  • CIM
    Noise and Vibration: Mine Workers’ Exposure in Quebec Underground Mines (bf19411f-d782-4aed-bfa6-78838c9cf781)

    By P. Marcotte, G. LeBlanc, S. Ouellette, J. Boutin

    "To characterize noise and vibration sources of different types of mining equipment used in underground mining, the authors performed a study in eight Quebec mines on 28 pieces of equipment. This pape

    Jan 1, 2015

  • CIM
    Coal Quality Estimation using Geophysical Logging Without Radioactive Sources

    By Filipe Beretta

    This study investigates geophysical logging capacity to predict coal quality. It was analyzed for possible correlation, some parameters determined via laboratory analysis of coal against results for t