Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Namew Lake Mill Project

    By K. Hoover, G. Labarre, S. Rantanen

    "As part of the Namew Lake project a mill was constructed to treat 1900 tpd of ore grading approximately 0.90% CU and 2.45% Ni to produce copper and nickel concentrates.Nickel occurs mainly as pentlan

    Jan 1, 1990

  • CIM
    Dense Medium Separation – An Effective and Robust Pre-Concentration Technology

    By Erin Legault Seguin, Mike Rylatt, Curtis Mohns

    "With energy costs increasing and ore grades diminishing, the role of pre-concentration in hard rock mining operations has been gaining greater interest. To maximize energy conservation, the pre-conce

    Jan 1, 2016

  • CIM
    Reliability and Application of Instrumented Rock Bolts in Underground Coal Mines

    By T. R. Kostecki

    "Instrumented rock bolts are effective tools for assessing the reinforcement and condition of immediate roofs; however, instrumentation can have relatively high costs, which can be justified by high r

    Jan 1, 2018

  • CIM
    Project Environmental Approval

    By B. R. Boardman

    Project Environmental Approval is a multi-faceted issue. From a mining perspective, it is a costly item because of avoidable time delay. The government perspective is that the approvals are a necessar

    Jan 1, 1978

  • CIM
    Deep shaft hoisting at LaRonde —The Penna shaft hoisting plant

    By B. McLaughlin

    Agnico-Eagle started sinking the Penna Shaft in 1995 with a hoisting plant capable of hoisting 1800 t/d from a 2240 m deep shaft. Exploration success led to the installation of a hoisting plant capabl

    Jan 1, 2004

  • CIM
    "Dacum" at the Carol Project

    By G. Taylor

    "The Iron Ore Company Of Canada's Carol Project is located in Labrador City, Newfoundland. Labrador City is some 912 air kilometers northeast of Montreal, and 417 ratl kilometers north of Sept-Iles, Q

    Jan 1, 1982

  • CIM
    Evaluation of liner capacity for blast damage mitigation

    By J. F. Archibald

    A research effort has been undertaken, under Workplace Safety and Insurance Board of Ontario (WSIB) sponsorship, to characterize the support capabilities of conventional and innovative spray-on lining

    Jan 1, 2004

  • CIM
    Goldstream Concentrator Design and Operation

    By Stuart McTavish

    "Noranda's Goldstream mine is a 1,500 ton per day copper-zinc mine located 60 miles north of Revelstoke, B.C.The orebody which contains 3.69% Cu and 2.69% Zn was discovered in 1972. Construction of th

    Jan 1, 1985

  • CIM
    Geologic, Geochemical, and Geochronological Constraints on the Genesis of Gold Mineralization at Poplar Mountain, Western New Brunswick, Canada

    By G. Chi, W. J. Davis, S. Watters, D. Hoy, S. Castonguay

    "The Poplar Mountain gold occurrence in western New Brunswick is hosted in the Poplar Mountain volcanic complex (PMVC), which is located along the southern segment of the regional Woodstock fault zone

    Jan 1, 2008

  • CIM
    The Social Acceptability Process of the Canadian Malartic Mine

    By Philippe Angers

    This article analyzes the social acceptability process of a mining project located in an existing city. It will explore how the principles of sustainable development have been integrated in the projec

    Aug 1, 2013

  • CIM
    Corrosion Behaviour of Swellex Bolts in Underground Mining Environments

    By F. Charette

    The paper reviews recent investigations of the impact of corrosion on the performance of both plain and coated Swellex rock bolts. It addresses the problems associated with estimating and predicting c

    May 1, 2004

  • CIM
    The Recovery of Rare Earths, Uranium and Pyrite from Pele Mountain’s Proposed Eco Ridge Mine Project

    By Roger Payne, John R. Goode, Feng Gao, James Brown

    The Eco Ridge deposit is located in the Elliot Lake mining camp in Northern Ontario, Canada. Between 1955 and 1996, the area produced more than 138,000 t (300 million pounds) of U3O8 and very signific

    Jan 1, 2014

  • CIM
    The economics of diamond projects in the Canadian Arctic (bbedb282-085a-4c62-8fa2-4245fef0430a)

    By W. Bullen

    A hypothetical economic model has been developed for diamond projects in the Canadian Arctic using data from recent exploration and mining projects. The model reflects economic conditions applicable t

    Jan 1, 2006

  • CIM
    Real-time Assisted Driving System in Open Pit Mining Operations using Google Earth

    By E. J. Sun

    The ADS system was developed to reduce accidents related to haul trucks operating under low visibility conditions in surface mining and construction sites, which is based on the GPS, mesh-wireless net

    Oct 1, 2009

  • CIM
    Advanced Control for Column Flotation

    By G. A. Kosick, G. S. Dobby

    "This paper presents the principles and application of a recently developed control system for flotation columns and column circuits. The control system uses triple pressure sensors to directly sense

    Jan 1, 1990

  • CIM
    Hope Bay Project: Canada?s Premier Undeveloped Greenstone Gold Belt Nunavut Territory, Canada

    By Stephen P. Quin

    One of the most prospective undeveloped greenstone belts in Canada, the Hope Bay greenstone belt extends over 80km in a north-south direction and is between 7 and 20km wide. The belt lies on the arcti

    May 1, 2003

  • CIM
    Ensuring Safety of Autoclave Plants with Emergency Shutdown Systems

    By Murray Pearson, Jack Murray

    "The danger of autoclaves lies in the high temperatures and pressures that exist in autoclave vessels. The usage of autoclaves will continue to expand in the mining industry because of their efficienc

    Jan 1, 2009

  • CIM
    World?s Largest 28 MW AG Mills, Largest Shop Trial, One Piece Delivery & Installation

    By Rajiv Kalra

    This paper reviews the following aspects of the world?s largest manufactured Grinding Mill?s in terms of diameter and power, along with the world?s biggest shop assembly and trial run of the mills del

    Jan 1, 2012

  • CIM
    World’s Largest 28 MW AG Mills, Largest Shop Trial, One Piece Delivery & Installation (26e1b765-3ec1-447d-8206-6ab79dbb100f)

    By Rajiv Kalra, Ji Jiangang

    "This paper reviews the following aspects of the world’s largest manufactured Grinding Mill’s in terms of diameter and power, along with the world’s biggest shop assembly and trial run of the mills de

    Jan 1, 2012

  • CIM
    Mudrush Risk Evaluation

    By A. R. Guest, R. Clayton, J. Jakubec

    "The potential for mudrushes is a potential hazard that should be evaluated during cave mining studies. Mudrushes are a phenomenon that can have very different origins, but produce the same results: i

    Jan 1, 2016