Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Beneficiation of the Clear Hills Ironstone

    By T. H. Etsell, P. Kerr

    Over the past 50 years, there have been a number of geological, mineralogical and metallurgical studies carried out on the Clear Hills ironstone deposits in northern Alberta, Canada. Due to the low gr

    Jan 1, 2015

  • CIM
    Development of an Electrochemicalmicrobial Sensor for Analyticaldetermination of Pb(II) Ions in Aqueous Solution

    By R. V. Kumar, C. Schwandt, S. Subramanian, S. Sampath, S. Vimalnath

    Waste waters and industrial effluents containing toxic heavy metals such as Pb, Hg, As and Cr, beyond permissible limits (0.1 ppm, 0.01 ppm, 0.02 ppm and 0.05 ppm, respectively) (WHO, 2011), pose seri

    Jan 1, 2016

  • CIM
    Current Mining Developments Committee Coal Division C.I.M.

    By H. Wilton Clark

    "IntroductionTHE CANADIAN use of short-period delay-action detonators in coal shooting has been carried on for about two years, mostly in British Columbia, and this is a preliminary report on progress

    Jan 1, 1953

  • CIM
    Financial Feasibility of Integrating Mineral Carbonation into Proposed Mining Operations at the Turnagain Nickel Site, Northern BC

    By Sarah R. Hindle

    Carbon capture and storage has jumped to the forefront of climate change mitigation efforts for its capacity to sequester large amounts of carbon. Mineral carbonation is one prominent option, mimickin

    May 1, 2010

  • CIM
    Coal Valley Mine

    By J. Keith Haddock

    "Introduction The Coal Valley Mine is operated by Luscar Stereo (1977) Ltd. with the Alberta Energy Company having a minority interest. The mine produces 2.0 million tonnes of bituminous thermal coal

    Jan 1, 1985

  • CIM
    National Instrument 43-101, Companion Policy 43-101CP

    "The Companion Policy is guidance and not law. It sets out the views of the Canadian Securities Administrators (CSA) at to the manner in which the CSA interprets and applies certain provisions of NI 4

    Jan 1, 2003

  • CIM
    Iron (III) Removal from Chloride Solutions by Solvent Extraction

    By A. P. Paiva

    The solvent extraction properties exhibited by some /V,N'-tetrasubstituted malonamides to efficiently and selectively recover iron(III) from concentrated chloride leaching solutions can be found

    Jan 1, 2006

  • CIM
    Mining Engineering Curricula

    M INE production requires the coordination of the talents of men and the use of equipment. Mine operators maintain a continual surveillance of equipment, looking for improvements and modifications tha

    Jan 1, 1963

  • CIM
    Hydro-Electric Power Possibilities Along the Route of the Pacific Great Eastern Railway

    By E. A. Cleveland

    A glance at the map discloses the fact that the Pacific Great Eastern railway either traverses or crosses some of the most important rivers of the province: the Squamish with its branches the Stawamus

    Jan 1, 1925

  • CIM
    Experimental characterization of the noise generation mechanism of percussion drill rods

    By Y. Champoux, N. Atalla, R. Oddo, C. Lesage

    "Percussion drills are the source of the most serious noise problems in mining activities, due to their extremely high noise levels(114-122 dB(A)) and widespread use(Bartholomae and Stein, 1988). Perc

    Jan 1, 1997

  • CIM
    Andco-Torrax: A Slagging Pyrolysis Solid Waste Conversion System

    By P. E. Davidson

    The management of solid waste is known to be a large and increasing problem in high-population areas throughout the world. It is not necessary here to add further definition to the nature and magnitud

    Jan 1, 1977

  • CIM
    Mineralogical Characterization of Sudbury Pyrrhotite Tailings: Evaluating the Bioleaching Potential

    By Tassos Grammatikopoulos, Vladimiros Papangelakis, Douglass Duffy, Cheryl Washer, Srinath Garg

    Flotation operations in Sudbury, Ontario, seeking to separate pentlandite and chalcopyrite from mixed sulphide deposits, produce pyrrhotite tailings that have been disposed of in tailings ponds for ov

    Jan 1, 2015

  • CIM
    Microseismic Imaging and Hydrofracture Numerical Simulations

    By Will S. Pettitt

    Fracture Network Engineering (FNE) is the engineering design of rock mass disturbance through the use of advanced techniques to model fractured rock masses numerically, and then correlate field observ

    Jun 1, 2012

  • CIM
    The Function and Organization of the Technical Library in the Service of the Mining, Metallurgical and Chemical Industries

    By C. R. Whittemore

    Introduction The technical library in the service of industry is gradually becoming a well recognized and important part of all progressive industrial organizations. The larger mining, metallurg

    Jan 1, 1930

  • CIM
    Podolsky Mine?s Ammonia Challenge

    ?Podolsky Water treatment plant discharges to Norman North bog which drains into Whistle / Post Creek watershed and into Wanapitei Lake ?Whistle Mine closed and reclaimed but continues to treat and d

    May 1, 2009

  • CIM
    Fibrous Dust -Its Measurement and Control

    By Gyan S. Rajhans

    "The strategy of fibrous dust sampling is discussed, various sampiing methods are critically reviewed .and their application to coal dust is demonstrated. Fibre counting is described in detail. An att

    Jan 1, 1970

  • CIM
    A Study of the Capillary Pressure.-Hydrodynamic Relationship to Soil Accumulation in Stratigraphie Traps

    By Ben Habermann

    "The object of the work described in this paper was to increase the understanding of the relation that capillary pressure of a rock, hydro-dynamics, and accumulation of oil in stratigraphie traps have

    Jan 1, 1960

  • CIM
    Revision of the Geology of the Southern Alberta Plains

    By Loris S. Russell

    THE plains of southern Alberta constitute one of the classic areas of geological investigation in Canada, for it was here in 1874, and in 1881 to 1883, that George Mercer Dawson (1, 2, 3) made the pio

    Jan 1, 1937

  • CIM
    Budget Control At the Hollinger Mine

    By J. W. Thomson, H. J. Lloyd, R. J. Taylor

    "THE HOLLINGER MINE has been producing gold and by-product silver almost continuously for forty-eight years. The value of current production is $10,000,000 annually from one million tons of ore. Its m

    Jan 1, 1960

  • CIM
    Pilot-Scale Industrial Microwave-IR Sorting of Porphyry Copper Ores

    By C. Dodds, R. S. Ferrari-John, The University of Nottingham, G. Dimitrakis, J. Katrib, A. R. Batchelor

    "Sorting technologies have the potential to reduce energy use in comminution by rejecting uneconomic ore before feed material enters the mill. However, a major challenge for sorting porphyry copper or

    Jan 1, 2016