Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Drilling of EM Anomalies Caused by Overburden

    By D. C. Fraser, W. J. Scott

    "Airborne electromagnetic surveys were flown during 1965 in the Moose River area of Ontario. The systems used were INPUT Mark II and the Canadian Aero Otter. Anomalies indicated by both systems were l

    Jan 1, 1973

  • CIM
    Geotechnical Challenges At The Beal Mountain Mine, MT

    By David Stone

    The Beal Mountain Mine near Anaconda, MT is an interesting case history of a mine that has continued operations despite several large pit wall failures over a period of about 10 years. The largest eve

    May 1, 2001

  • CIM
    Investigation of Suitability of Pb-Zn Mine Tailings for Surface Paste Disposal

    By A. Bascetin

    The mining industry in Turkey has been developing in the last 10 years. Mine wastes and tailings have thus been increasing, depending on the rising production rates. There are many problems related to

    Aug 1, 2013

  • CIM
    Process Control in Gold Milling at Noranda's Hemlo Gold Mines Inc.

    By C. Larsen, R. A. Walker, A. Voth, C. Daoust

    "The 3000 t/d mill at Hernia Gold Mines Inc. was commissioned in March, 1985. By Canadian standards the concentrator is highly automated, however, unlike the retrofit systems in many other plants, the

    Jan 1, 1988

  • CIM
    Interpretation of Pressure Data Water Saturation in the Bellshill and Lake Capillary Field

    By A. J. Miller

    Estimates of interstitial water saturation derived from capillary pres-sure data are compared with residual water saturations found by the analysis of cores out in oil-base drilling fluid. A theoretic

    Jan 1, 1960

  • CIM
    Research Progress on Stability Classification for Rocks Surrounding Coal Roadways in China

    By Renliang Shan

    Site conditions of China?s coal roadways are complex and changeable, and scientific classification of them is the fundamental basis for coal roadway support design, with great significance for ensurin

    Aug 1, 2013

  • CIM
    Rare earth element lithogeochemistry of granitoid mineral deposits

    By B. J. Fryer, R. P. Taylor

    "As a monitor of the processes involved in the formation of granitoid mineral deposits the coherent group behaviour of the rare earth elements (REE) actively reflects changing fluid characteristics. F

    Jan 1, 1983

  • CIM
    The Importance of High-Pressure Compressed Air to Mining Operations

    By A. R. Pasieka, J. C. Wilson

    "Compressed air still remains an essential source of power in underground hardrock mining. As a power medium it has a high convenience factor, although, in many cases, it is expensive to generate and

    Jan 1, 1966

  • CIM
    A Mathematical Model of The Hydrocyclone Classifier

    By L. R. Plitt

    A series of experiments were carried out in an effort to develop a universally applicable mathematical model of the hydrocyclone classifier. The design and operating variables studied were: cyclone di

    Jan 1, 1976

  • CIM
    Model of Rock Mass Destruction in Conditions of Exploitation of a Copper Ore Deposit

    By J. Dubinski

    Underground mining of copper ore in the Legnicko-Glogowski Copper District basin generates a number of seismic events, whose energy often exceeds 108 J (Butra, 2010). The number of tremors and their l

    Aug 1, 2013

  • CIM
    A Study of Strength Characteristics of an Andesite

    By G Zahary

    THE most acceptable approacl1 to analyzing rock behaviour, at the present time, is based on the application of principles of mechanics and strength of materials. Analyses have been made in which the c

    Jan 1, 1963

  • CIM
    Flowsheet Development and Integrated Pilot Plant Testing for a Pyrochlore Bearing Carbonatite Ore

    By S. Kelebek, B. Ingram, C. Gibson, T. MacNeil, M. Aghamirian

    "The beneficiation and upgrading of pyrochlore from its ores is carried out through flotation. In industrial practice, upgrading is conducted in a two-stage flotation process in which pyrochlore flota

    Jan 1, 2016

  • CIM
    Temperature Field in the Exploration Area of the Gorleben Site – Geothermal Borehole Logging and Numerical Model Calculations

    By S. Fahland, P. Vogel

    "The Gorleben salt dome has been investigated since 1979 for its suitability as a repository for the disposal of high-level radioactive wastes. The geoscientific surface exploration was followed by un

    Jan 1, 2015

  • CIM
    Effect of Cold Working on Microstructure and Performance of CuCrZr Alloys

    By H. Huang, H. M. Chen, W. B. Xie

    Cu-0.8Cr-0.1Zr alloy were prepared by atmospheric melting. the microstructure and properties of the CuCrZr alloy after first cold rolled, solid solution, second cold rolled and aging treatment were an

    Jan 1, 2019

  • CIM
    Potash in Saskatchewan: An Overview of Exploration and Developments

    By Jason Berenyi

    Presentation Overview ? What is Potash? ? Where are the potash deposits? ? Current potash mines ? production, capacity and planned upgrades ? Saskatchewan Saskatchewan?s Potash Production Potenti

    May 1, 2009

  • CIM
    Alternatives to flow-through

    By Robert B. Parsons

    "It is generally felt that flow-through shares face a bleak future under the set of tax rules proposed in the federal government's tax reform white paper. Industry and government circles are begi

    Jan 1, 1988

  • CIM
    Yanacocha Gold Single Stage SAG Mill Design, Operation, and Optimization

    By Ben Burger

    This paper describes the design, the first three years of operation and optimization of a large, single stage SAG mill at Minera Yanacocha?s Gold Mill facility located in northern Peru. The Gold Mill

    Jan 1, 2012

  • CIM
    Summary of industrial minerals in Nova Scotia

    By John H. Fowler

    Nova Scotia has been mining and exporting industrial minerals for over two hundred years. As an industrial mineral producer, this province continues to rank as the number one gypsum mining and exporti

    Jan 1, 1984

  • CIM
    Risk Assessment of Confined Space Using Fuzzy Set Theory at Mine Reclamation Sites

    By L. Mohammadi

    Outline ?Background on the accident at the Sullivan Mine No.1 Waste Dump ?Holistic approach to understand the reason for accidents (Atmospheric) ?Specific hazards at reclamation sites ?Regular atm

    May 1, 2010

  • CIM
    Fe(III)-As(V) Precipitates Obtained from the Fe(II)-As(V)-SO42--H2O System and Their Leaching Stability

    By Pingchao Ke, Zhihong Liu

    Fe(III)-As(V) precipitates were synthesized from the Fe(II)-As(V)-SO42--H2O system at 90°C in initial Fe(II)/As(V) molar ratios of 4.0 and 5.0, respectively. The synthesis were carried out by introduc

    Jan 1, 2017