Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The CMIC / CanmetMINES Comminution Energy Recovery Potential Initiative – The Agnico Eagle Goldex Division Case

    By Yan Germain, Université Laval, Bernard Dallaire, Jocelyn Bouchard, Peter Radziszewski, Gilles LeBlanc, Michelle Levesque, Nicolas Tremblay

    "The comminution process is estimated to be only 1% efficient, resulting in waste energy dissipated as heat, noise, and vibration. Energy recovery from grinding circuits has not been implemented mainl

    Jan 1, 2016

  • CIM
    Amenability of Gold Ores to Coarse Particle Gangue Rejection (Preconcentration) Processes

    "Decreasing gold-in-ore grades is one of the main drivers of poorer productivity and rapidly escalating unit costs. Grinding costs, water use and reagent consumption are all intimately related to the

    Jan 1, 2016

  • CIM
    Arntfield Mine

    By E. A. Hart, J. E. Gill

    "The property of Arntfield Mining Corporation, formerly Arntfield Gold Mines, Limited, covers an area of 2,110 acres and lies in Beauchastel township, western Quebec. The Francoeur mine lies to the we

    Jan 1, 1954

  • CIM
    Rabbit Lake project - mining and development

    By G. W. Clark

    "The mining of the ore bodies at Rabbit Lake has in the past been by the open pit method. This method is presently being used to develop the B-zone and will continue into the future with the developme

    Jan 1, 1989

  • CIM
    Some Views on the Strength and Ductility of Ultra Fine Grained Steels through Micro Plasticity Approach

    By M. Venkatraman

    The limit of Hall - Petch relationship in ultra fine grained steels has been examined based on dislocation pile-up mechanism. When the grain size becomes small the dislocation multiplicity ceases resu

    Jan 1, 2004

  • CIM
    Applications of X-Ray Emission Spectrometry to Rock and Ore Analysis

    By G. R. Webber

    CHEMICAL AN AL YSIS by x-ray emission spectrometry has become increasingly important during the past few years. The method is analogous to optical spectrography ?with x-rays being used instead of ligh

    Jan 1, 1957

  • CIM
    Effect of Process Conditions on Froth Stability in an Industrial Copper Flotation Circuit

    By G. Bartolacci

    In a COREM-McGill collaborative research and development project, gas dispersion parameters and froth properties were manipulated in a copper flotation plant to study interactions between the collecti

    Jan 1, 2007

  • CIM
    The Dominance of the Competent (132ad218-068a-4432-85e5-c44062e501fc)

    By Å. Partapuoli, M. Henriksson, P. Wikström, J. Worth, G. Adolfsson

    The control of AG mills fed by ores with harder and softer components can be challenging due to the sensitivity of the mill to the ratio of hard to soft components. The mills at LKAB’s iron ore operat

    Jan 1, 2012

  • CIM
    Stability of high narrow backfills

    By R. J. Mitchell

    "High narrow backfills of significant strike length approach the stress conditions associated with a free standing wall but this lower bound design approach is not considered efficient for earth struc

    Jan 1, 1989

  • CIM
    Revisiting Ground Vibrations Due to Mining Equipment Motion

    By T. G. Joseph, M. Welz

    ABSTRACT: Joseph (2002) introduced passive seismic monitoring to measure mining equipment performance. This paper evaluates the potential of passive seismic monitoring to correlate mining equipment op

    Jan 1, 2011

  • CIM
    The Influence of Roasting Temperature Upon Gold Extraction by Cyanidation from Refractory Gold Ores

    By R. Carter, C. S. Samis

    "SummaryThe results of this investigation indicate that the gold in the cyanide tailing of refractory gold cyanides is occluded in fused •particles formed during roasting. This conclusion was reached

    Jan 1, 1952

  • CIM
    Throwing the Switch - The Planning, Process and Challenges of a Ventilation System Changeover

    By Arsalan Talebzadeh

    Construction -Surface ?First two intake fans constructed in 2007; third fan added in 2008 to reduce resistance in the system. 450 HP fans. ?Excavation for exhaust fans started in 2008. ?In parallel

    Oct 1, 2010

  • CIM
    Energy Consumption in Canadian Mills

    By E. G. Joe

    The continuing increase in costs for power and fuel are affecting significantly the cost of milling Canadian ores. In order to ascertain the scope and source of energy consumption in Canadian mills fo

    Jan 1, 1979

  • CIM
    Implementing Technical Change, a Selection of Rio Tinto Case Studies

    By Daniel D. M. Adams

    In 2004, Rio Tinto started a major project to implement Mine Monitoring and Control (MMC) systems worldwide. A detailed selection processes was undertaken and migration to a standard system was starte

    May 1, 2010

  • CIM
    Process Mineralogy of Samples from the Wellgreen Cu-Ni-Pt-Pd Deposit, Yukon

    By Larry J. Hulbert, Louis J. Cabri, John L. Campbell, Gilles Laflamme, Chris G. Ryan, Soey H. Sie, Rolando Lastra

    "Abstract- The mineralogy of samples from the Wellgreen Cu-Ni-Pt-Pd deposit, Yukon Territory, is complex and the metals of interest are contained within fme-grained minerais which vary in size and min

    Jan 1, 1993

  • CIM
    Metrology in Mineral Exploration

    By Jan W. Merks

    The objective of metrology in mineral exploration is to derive unbiased confidence limits for masses of metals contained in reserves and resources. Sets of test results for gold and silver determined

    Oct 1, 2009

  • CIM
    Performance improvement at the Bell Mine

    By M. C. Ethier, A. L. Laramie

    "The Granisle and Bell Copper mines were officially put into production in 1966 and 1972, respectively. The Granisle Mine was purchased in late 1979by Noranda and the two operations were amalgamated a

    Jan 1, 1990

  • CIM
    The Impact of Copper Mine Tailings Dam on the Groundwater Quality

    By A. Torkian

    Process water from production of concentrates in Meydook copper sulfide mine is transferred to the 8.3 million m3 tailings dam and a water retention pond after initial thickening. Elevated concentrati

    Aug 1, 2013

  • CIM
    Estimating Rock Mass Properties and Seismic Response Using Higher Order, Discontinuous, Finite Element Models

    By D. A. Beck

    The load-deformation response of discontinuous rock under static and dynamic loading conditions has been simulated using Explicit Finite Element models. The intent of the analysis was to investigate t

    May 1, 2009

  • CIM
    Practical Considerations for the Use of Microseismic Systems at Mining Operations

    By Ian S. Leslie

    Seismic monitoring systems for mining operations are being utilized more than ever before in the characterization of rock mass response to underground and open pit mining. This paper provides a review

    Jun 1, 2012