    Modified Stability Graph Method with a new Rock Stress Factor

    The Stability Graph Method is widely used in Canadian underground hard rock mines for open stope support design and is frequently used in the mine planning phase to assess the viability of stope geome

    May 1, 2011

  • CIM
    Developments in at-Face/in-Pit Processing Technologies

    By Martin Stoklossa

    Surface mining operations typically require run-of-mine material to be sized for further processing. In-pit crushing facilities serve this need, as stationary, semi-mobile or fully mobile units. Altho

    May 1, 2008

  • CIM
    A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams Mine

    By David Evans, David Barnes, Robert Raponi

    "The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind

    Jan 1, 1997

  • CIM
    Fleet management system for underground mines (dd9c7c45-cd77-4292-966a-863f63e39c89)

    By R. Grimard, M. Gamache, L. -P. Bigras, P. Cohen

    This paper describes a real-time fleet management system for an undergroun mine. Dispatching, routing and scheduling are handled simultaneously, taking into account the mine status, operational constr

    Jan 1, 2004

  • CIM
    Thompson Mine Geology

    The introduction consists of back-ground information, of an historical and statistical nature, relating to the Thompson mine. The geological presentation is based on illustrations that are intended to

    Jan 1, 1963

  • CIM
    Geochemistry of the Platinum-Group Elements

    "4.1. IntroductionThis chapter reviews the geochemistry of the platinum-group elements (POE) in sulphur-poor silicate rocks, and the limited data on POE in silicate, oxide, sulphide, arsenide and sulp

    Jan 1, 1979

  • CIM
    Arsenic Hydrometallurgy; Fundamentals, Technology and Applications

    By K. D. Mills, R. G. Robins, C. G. Anderson, L. G. Twidwell

    Arsenic is a metalloid which has attracted great environmental scrutiny in recent decades. Moreover, its control and deportment is becoming increasingly important in the metallurgical processing of mo

    Jan 1, 2014

  • CIM
    Heap Leaching in Ontario - An Example

    By W. J. Witte, M. K. Witte

    "The purpose of this report is to present a generalized preliminary design and cost estimates for a typical heap leach operation such as might be undertaken in Northern Ontario. This report should be

    Jan 1, 1985

  • CIM
    Sustainability Rise through Process Improvement from the Industrial Revolution to the Present

    By H. J. McQueen

    Mineral and energy resource consumption were continuously reduced by process improvements as chemical understanding was developed and applied. During the past two centuries, technological improvements

    Jan 1, 2012

  • CIM
    Kiena Maintains Up To Date Image with a New Gold Mill

    By R. Jolicoeur, J. F. Jackson, M. A. Green

    "The design, construction and commissioning of Kiena Gold Mines Limited's new mill was completed in 15 months ending in September 1984. Rated at 1250 tonnes per day the mill incorporates the latest in

    Jan 1, 1986

  • CIM
    The Development of a Small-scale Test to Determine Work Index for High Pressure Grinding Rolls

    By Dave Bulled, Khiratt Husain

    "The use of High Pressure Grinding Rolls is gaining significant interest as a replacement for SAG milling in the comminution of hard rock ores because of the potential for reduced costs in terms of en

    Jan 1, 2008

  • CIM
    Materials for controlling wear in surface mining

    By Ree Llewellyn

    "It has been estimated conservatively that the costs of wear damage and friction in the Canadian mining and mineral processing industry amount to over one billion dollars per year. These are mainly in

    Jan 1, 1996

  • CIM
    The Impact of Grinding Chemistry on Galena Flotation at Rosh Pinah Zinc Corporation, Namibia

    By Marco Lombard, Paulus Kapolo, Christopher J. Greet

    "The conversion of a concentrator from one grinding media type to another is a major undertaking in terms of both financial and technical risk. So, a strategy of completing sufficient laboratory and f

    Jan 1, 2013

  • CIM
    Implementation of Cyanidation by Size Class at Sleeping Giant Mill

    By Gilles Landry, Mohamed Ourriban, Pierre Pelletier, Ahmed Bouajila, Claude Gagnon

    "This paper summarizes the work carried out to develop and implement the gold cyanidation by size class (CSC) process, a novel concept aiming to reduce cyanide consumption.First, the authors will pres

    Jan 1, 2009

  • CIM
    Upgrading Molybdenite Ores between Mine and Mill Using Microwave/Infrared (MW/IR) Sorting Technology

    By Eugen Gluck, Gus Van Weert, Peter Kondos

    "Microwaves have the capability to heat up sulphides, especially clusters of particles of approx. 1 mm. Some sulphides absorb microwaves more readily than others. Molybdenite is especially effective i

    Jan 1, 2009

  • CIM
    Estimating the Energy Recovery Potential of Newmont’s Carlin Mine Dry Grinding Circuit

    By Aidan Giblett, Michael McGlynn, Peter Radziszewski

    "On the basis that 99% of the energy input into a mill is converted into heat, it is possible to estimate the amount of energy captured in the slurry, the amount that is lost to the environment as wel

    Jan 1, 2016

  • CIM
    Jolu Gold Mine Low Cost Gold Recovery Configuration

    By J. Kazakoff

    "The success of gold recovery at the Jolu gold mill depends on many variables. The most important ones are the people, the ore body, plant design parameters, equipment selection and cost control. This

    Jan 1, 1990

  • CIM
    Removal of Organic Carbon with a Jameson Cell at Red Dog Mine

    By Todd Smith, Brigitte Lacouture, Greg Anderson, David Lin

    "The lead and zinc flotation circuits at Red Dog Mine are preceded by a preflotation circuit which recovers naturally-floating organic carbon contained in the ore. Organic carbon is a potential contam

    Jan 1, 2008

  • CIM
    The integration of condition monitoring into the maintenance process (16e8fde4-e738-4229-a500-8c29dcc904ed)

    By M. W. Lewis, J. Werner

    Fluctuating metal prices, declining head grade, and increased operational costs are forcing many open pit mining companies to look to their balance sheets for significant cost reductions in order to r

    Jan 1, 2005

  • CIM
    Copper Concentrate Quality Improvements at Myra Falls (40th Annual Meeting of the January 22 to 24, 2008 Canadian Mineral Processors Ottawa, Ontario, Canada )

    By Trevor Yeomans

    "NVI Mining’s Myra Falls Operation is a forty year old underground mining operation feeding a 4000 mtpd concentrator.The current Mill, built in 1985, was designed to process a large massive sulphide o

    Jan 1, 2008