Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Evaluation of the Effect of Mixing Method, Sequence and Time on the Properties of Gelfill

    By C. Doucet

    Since 2001, CANMET Mining and Mineral Sciences Laboratories (MMSL) have worked with Falconbridge Ltd. (now Xstrata Nickel) to evaluate trends in the strength development and water retention properties

    May 1, 2007

  • CIM
    The U.S. Mineral Property Valuation Patchwork of Regulations and Standards (b596e322-36dd-40ba-820a-fc3646322652)

    By Trevor R. Ellis

    "The valuation of mineral properties in the U.S. is only partially regulated. The regulations which have jurisdiction or impact appear to have such mainly as a consequence of unintended fallout, since

    Jan 1, 2003

  • CIM
    The Coal Resources of Nova Scotia and their Future

    By A. E. Cameron

    The curve of coal production in Nova Scotia over the past forty years shows a definite maximum reached in 1913. Continued production to this maximum will require a greater tonnage per man-day, and thi

    Jan 1, 1944

  • CIM
    Retimbering No. 2 Shaft at Sigma Mines (Quebec) Limited

    By G. E. Peacock

    SIGMA MINES is situated in the township of Bourlamaque, Abitibi County, Quebec. It is a gold producer, and presently treats an average of 1,200 tons of ore per day, at a grade of approximately 0.18 oz

    Jan 1, 1962

  • CIM
    Fuel Research Facilities in Canada

    By R. E. Gilmore

    PREAMBLE THIS PAPER comprises material presented in two separate 'Papers at the British Commonwealth Scientific Specialist Conference on Fuel Research held in London, England, in July, 1950. The

    Jan 1, 1951

  • CIM
    Failure Mechanisms of Pillars Under Shear Loading

    By Joseph J. Mgumbwa

    Pillars are any structures left between two or more underground openings. The stability of pillars is normally considered to depend on shape (defined by width to height ratio), rock mass strength, ext

    Oct 1, 2010

  • CIM
    Mining strategy for the Retreat Zone at Noranda’s Bell-Allard mine

    By D. Ouellet, G. Gagnon, B. Simser, V. Falmagne

    The mining sequence at Noranda’s Bell- Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modelli

    Jan 1, 2004

  • CIM
    Unique construction methods employed for a ventilation raise at Petro-Canada's Kipp coal project

    By S. A. G. Poppen, J. Konopka

    "Petro-Canada's project investigative and experimental underground work in the Galt coal seam at Kipp, Alberta included the construction of an emergency egress and ventilation raise from surface.

    Jan 1, 1983

  • CIM
    Considerations Regarding the Development of an Economic Mathematical Model for Optimizing the Technological Variants in the Coal Mine Faces

    By Dolea Gabriel Gheorghe

    In the present paperwork is proposed an economical-mathematical model (fuzzy) that aims optimize the technological variants of the mechanized coal face. By fuzzification, the issues to solve become mo

    Oct 1, 2009

  • CIM
    Monitoring the Burner Emission Spectrum in a Commercial Flash Furnace Using a Novel Optical Probe

    By G. Stokreef, B. R. Davis, M. Kadiyski, Alvear Montenegro, H-P. Loock, V. Montenegro

    An optical probe for burner monitoring in copper flash smelting, first developed at the University of Concepcion, is being industrially tested in a collaboration between Kingston Process Metallurgy, A

    Jan 1, 2019

  • CIM
    Latest Fire Protection Innovations for Large-Scale Mining Equipment

    By Don A. Toth

    Until recently, the fire protection systems used to protect mining equipment were based on generically designed, off the- shelf concepts. These systems were reliant on single agent approaches and were

    Apr 1, 2005

  • CIM
    The Cigar Lake project — Mining, ore handling and milling

    By 12670

    The Cigar Lake project will develop the world’s second largest high-grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U3

    Jan 1, 2004

  • CIM
    Mattagami River Refractory Clays

    By A. E. Hilder

    Introductory The following pages present the results of field investigations, laboratory and commercial tests, drilling, surveying, and preliminary development of the refractory clays which have been

    Jan 1, 1935

  • CIM
    Field Relations of Matagami Sulphide Masses Bearing on their Disposition in Time and Space

    By John I. Sharpe

    Masses of pyritic copper and zinc ores are entrapped along the contact zone between two volcanic groups in the Matagami area. The upper limits of the sulphide concentrations tend to form concordant co

    Jan 1, 1965

  • CIM
    The Discovery and Delineation of the Heavy Mineral Sand Orebodies at Graauwduinen, Namaqualand, Republic of South Africa

    By G. L. Palmer

    "Abstract- ln 1986, anomalous sampling results for heavy minerals were obtained at various sites in Namaqualand on the west coast of the Cape Province. Drilling in 1987 at Graauwduinen penetrated up t

    Jan 1, 1994

  • CIM
    The Lubrication of Mining Machinery and Equipment

    By A G. Rogers

    This paper discusses the lubrication of surface and underground mining machinery and equipment from the standpoint of machine components. The machine components considered are bearings, cylinders, gea

    Jan 1, 1963

  • CIM
    The application of a tunnel-boring machine for exploration drifting at Kiena Gold Mines Limited, Val d'Or, Quebec

    By D. Vanin

    "Conventional single heading track drifting in the hard rock mining industry has not shown any significant improvements in advance rates, despite the advent of modern track jumbos and igh speed muck h

    Jan 1, 1987

  • CIM
    Jaguar?s Caeté Gold Project in Brazil

    By Ivan C. Machado

    Jaguar Mining Inc. is implementing a 1.1 Mtpy, 7-year LOM gold project in the Iron Quadrangle (?Quadrilátero Ferrífero?), Brazil. Construction is on schedule and startup is programmed for Q2 2010. Mil

    May 1, 2010

  • CIM
    Water Management Design for Cigar Lake Uranium Mine

    By Ken Dyck Sr.

    "Construction of the Cigar Lake uranium mine in northern Saskatchewan is well under way. Production is anticipated to begin in the first half of 2007. When in full production, the mine is projected to

    Jan 1, 2006

  • CIM
    Flotation as Part of Grinding Classification Circuits

    By M. Tarvainen, J. Kallioinen

    "Depressed metal prices coupled with increasing production costs have presented a great challenge for operators to control and reduce the costs of production to maintain profitability. Depleting ore r

    Jan 1, 1984