Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Barrick Goldstrike Roaster Facility Engineering and Construction of the Goldstrike Roaster Facility

    By Ray Walton, Ron Colquhoun, Ken Thomas, Dwayne Fentie, Barney Burke

    "The new Roasting Facility at Barrick’s Goldstrike Mine in Nevada, U.S.A. was developed to process 12,000 tons per day of refractory gold ore. The process consists of crushing, dry grinding, roasting,

    Jan 1, 2001

  • CIM
    An Overview of Biological Treatment Concepts for Nickel and Cobalt Recovery, and SO, Removal

    By J. L. Huisman, G. Schouten

    After pyrometallurgy and hydrometallurgy, bio(hydro)metallurgy is the latest development in the ongoing search for efficient and economic metal winning processes. In addition to bioleaching, other bio

    Jan 1, 2005

  • CIM
    Materials Requirements For Canada?s Nuclear Power Program

    By E. C. W. Perryman

    Materials research and development has played an important role in the commercial success of the CANDU- PHW nuclear reactor and in the production of heavy water. Both capital investment and energy con

    Jan 1, 1977

  • CIM
    Oil Sands Projects In Alberta; a Survey

    By David W. H. Ellis

    This presentation will discuss over 2 dozen past, present and future oils sands projects in Alberta. The very early projects as well as the most recent along with the ones that never got off the groun

    May 1, 2004

  • CIM
    Institutional Assessment: Emerging Practice in Sustainable Community Investment

    By Roxanne Scott

    Outline ? Overview of Community Investment in the Mining Sector ? Emerging Good Practice: ?Strategic Integrated Community Investment? ? Assessing Local Context: ? Institutional Assessment ? Partn

    May 1, 2010

  • CIM
    Simulation of an SX/EW Pilot Plant

    By Hossein Aminian, Daniel Hodouin, Claude Bazin, Claude Jacob

    "Solvent extraction followed by electrowinning (SXEW) is an economical option for the processing of low grade and oxidized copper ore. Phenomenological models were developed to simulate the copper sol

    Jan 1, 1999

  • CIM
    Geology and Mineral Deposits of the Gallinas Mountains REE Deposit, Lincoln and Torrance Counties, New Mexico, USA

    By Virginia T. McLemore

    The Gallinas Mountains are in northern Lincoln County and southern Torrance County, New Mexico, USA where a series of alkaline igneous bodies, including porphyritic latite, trachyte/syenite, andesite,

    May 1, 2011

  • CIM
    Oil and Gas in Southwestern Ontario

    By W. A. Roliff

    The renewed interest of the past few years in the Appalachian and Michigan oil provinces has not, as yet, created any marked increase in activity in Southwestern Ontario. During 1960 development drill

    Jan 1, 1961

  • CIM
    Methodology for Quantifying Uncertainty Versus Data Spacing Applied to the Oil Sands

    ABSTRACT The inevitable uncertainty in modelling spatial variables decreases as more data become available. This reduction depends on the properties of the variable being modelled. Spatially continuou

    Jan 1, 2013

  • CIM
    Case Studies on Circuit Design Using Flotation Columns

    By Glenn S. Dobby, Glenn A. Kosick

    "Column flotation circuit engineering has matured to a good level of understanding regarding testing, scale-up and design. Some of the factors important to the process of implementing columns are addr

    Jan 1, 1995

  • CIM
    Improving Quality Control and Combustion in Pyrometallurgical Processes using Multivariate Image Analysis of Flames

    By Gianni Bartolacci, Patrice Nadeau, Szatvanyi. Gerard, Carl Duchesne, Claude Chrétien

    "Combustion is used throughout the mineral processing industry to produce steam in boilers, to dry concentrates in rotary dryers, and to apply heat treatments in pyrometallurgical furnaces. Tight comb

    Jan 1, 2005

  • CIM
    Overview of the Dragon Lake Uranium Prospect, Maybelle River Area Northeastern Alberta, Canada

    By C. Cutts, K. Wheatley

    The Dragon Lake Zone (uranium prospect) comprises a N160º trending vein that is approximately 110 m long, up to 5 m wide and from 1 to 40 m high. The zone is mostly within altered sandstone of the Fai

    Jan 1, 2013

  • CIM
    Some Geological Problems of Central Saskatchewan

    By F. H. Edmunds

    I N presenting this paper, the writer wishes to point out some of the difficulties and problems of geological work in that part of Saskatchewan in which outcrops are few. These problems are well known

    Jan 1, 1937

  • CIM
    Improving Silica Dust Controls for Metal/Nonmetal Mining Operations in the United States

    By Jay F. Colinet

    Researchers at the Pittsburgh Research Laboratory (PRL) of the National Institute for Occupational Safety and Health (NIOSH) work to reduce respirable dust exposures in mining operations. One focus o

    May 1, 2007

  • CIM
    Creating Sustainability at Antamina

    By Steven D. Botts

    The Antamina project, owned by BHP Billiton Plc, Mitsubishi Corporation, Noranda Inc., and Teck Cominco Ltd. , is a $2.3 billion copper/zinc project, located in the Ancash Department in Perú. The proj

    May 1, 2002

  • CIM
    Electromagnetic testing of wire ropes — New developments

    By K. Leung, J. E. Udd, L. B. Geller, F. Kitzinger

    "Sixteen miners died tragically at the Paymaster gold mine in Timmins, Ontario, in February 1945 when a badly corroded hoist rope broke. The investigation of the Royal Commission that followed arrived

    Jan 1, 2003

  • CIM
    Environment Driven Innovation of Hydraulic Excavators

    By Axel Doelcken

    ?? Liebherr excavators in standard configuration are generally designed to operate in an ambient temperature range between -12°C and +55°C (10.4 °F and 131°F). ?? To operate effectively and efficient

    May 1, 2008

  • CIM
    Finite Element Analysis of Serrated Chip Formation in Machining of 7075-T651 Aluminum Alloy

    By W. Jomaa, V. Songmene, O. Mechri, Laval Université, P. Bocher, J. Levesque

    "A 2D finite element modelling (FEM), based on pure Lagrangian approach, is developed for studying the serrated chip formation during high speed machining (HSM) of 7075-T651 alloy. The solution was ac

    Jan 1, 2016

  • CIM
    Toppling failure — A proposed analytic solution

    By J. I. Mathis

    "The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was

    Jan 1, 2004

  • CIM
    Recent Changes at the Sarcheshmeh Copper Mine Flotation Circuit

    By S. Banisi, M. Pourkani, A. Kargar, D. Hamidi, M. Sarvi

    "Flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. To study the stage recovery of copper, one of the

    Jan 1, 2001