Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Unlocking value in drill and blast at Olympic Dam – Lime 390 case study

    By P Vaikkattil, K Li, J Bullock

    Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout

    Mar 15, 2021

  • AUSIMM
    Using an undisturbed landform to calibrate long-term predictions of the evolution of a rehabilitated landform

    By G R. Hancock, M J. Saynor, J B. C Lowry, K G. Evans, M Narayan

    Tools such as landform evolution models (LEMs) provide a means of predicting how a landform may evolve over extended periods of time. Here, we utilise the CAESAR-Lisflood LEM to assess a proposed reha

    Jul 25, 2018

  • AUSIMM
    Redefining Competent Persons Criteria for Resource Geologists

    By J Coombes

    There is much debate on the Competent Persons qualifying criteria for providing classified resource estimates for public reporting. The CRIRSCO family of codes including the JORC Code, SAMREC, PERC an

    Aug 18, 2014

  • AUSIMM
    Engineering and Science in Flotation Cell Design

    By J Euston

    In the 1990s round flotation tanks were introduced as a result of the lower fabrication costs for larger cells. It was soon observed that round tanks held a number of further advantages over the tradi

    Aug 8, 2011

  • AUSIMM
    Newmont Tanami Operations – Tailings Storage Facilities

    By S Thacker, M Noakes

    The Newmont Tanami Operations (NTO), formerly the Granites Gold Mine, commenced operation in the mid-1980s with tailings deposition evolving over the past three decades as production has increased and

    Jul 27, 2015

  • AUSIMM
    Lessons learnt from six mine disaster case studies to improve audit and assurance and ESG

    By A Atkins

    Six recent case studies were selected based on the eight main causes of mine disasters (Table 1; Quinlan, 2014) and where credible information sources, such as Royal Commission Reports, Coronial Inves

    May 5, 2022

  • AUSIMM
    Controlled Recirculation and Refrigeration at ValeÆs Taquari Potash Mine

    By S Bluhm, LádeáOliveira, R Funnell

    Taquari Vasouras potash mine (Vale Fertilizantes) has many interesting features including virgin rock temperatures of 50¦C at depths of 700 m. The mine has a relatively small shaft system with limited

    Jul 1, 2013

  • AUSIMM
    Problems Associated with Sampling and Assaying for Gold in Mill Feed at Peko Mines Ltd.

    Prior to 1972, Peko Mines Limited at Tennant Creek used a central mill at Peko, which consisted of a gravity circuit, flotation and cyanidation of tailings, to treat their gold ore from surroundin

    Jan 1, 1978

  • AUSIMM
    Topsoil Management for Long-term Mine Operation and Closure – A Case Study from Alcoa's Bauxite Mining Operations in South-west Australia

    By A Grigg, L Hackett

    Alcoa operates two bauxite mines at Huntly and Willowdale, located within the jarrah forest south-east of Perth in Western Australia. Ore reserves are shallow but extensive, and mining pits averaging

    Jul 16, 2014

  • AUSIMM
    Surface-to-inseam (SIS) Drilling at Oaky Creek Coal Mine – SIS Design Aspects and Drilling Environment

    By E Corpuz, J Weissman, S Winter, R Evans

    The surface-to-inseam (SIS) directional drilling technique has been utilised at Oaky Creek Coal for more than a decade to predrain both the Oaky No 1 and Oaky North mining areas. The cumulative drilli

    Aug 31, 2015

  • AUSIMM
    Diversion decision making with an integrated approach to design for operations and mine closure

    By M Rafty, A Markham, S Atkinson

    Australia contains some of the most productive mining areas and is characterised by ancient landscapes and highly variable hydrology. Historical mining of iron ore, coal and other minerals has targete

    Jul 25, 2018

  • AUSIMM
    Automated, online measurement of bulk material size distribution on conveyor using 3D profile imaging at Boliden Mines

    By M J. Thurley, L Lindqvist, D Degerfeldt, J Nyström, R Nordenskjöld

    Rock breakage is a major component of all mining and mineral processing operations with the particle size distribution linked to productivity through the comminution chain. Optimisation and automatic

    Aug 29, 2018

  • AUSIMM
    Integration of Sustainability Into Mining Schools - Counter-Cyclical Strategies

    By M Scoble

    This paper is based upon the experiences of collaborating academics in two mining schools and their personal view of attempts to integrate the principles of sustainable development into mining educati

    Jan 1, 2009

  • AUSIMM
    Carrapateena Crows Foot Level Layout – Safety in design to support sub level cave production efficiency and automation

    By A Mooney, J Marsden, H Grosser, G Dunstan

    Carrapateena is a copper-gold deposit hosted in a brecciated granite complex, located 500km North of Adelaide, South Australia. The deposit is being mined using the Sub Level Caving (SLC) Mining metho

    Mar 15, 2021

  • AUSIMM
    Mining Under Indonesia's New Environmental Law

    The new law on Environmental Protection and Management (Republic of Indonesia Law 32 of 2009) was passed by the Indonesian parliament in September 2009. This law aims to protect Indonesia's rapid

    Jun 1, 2010

  • AUSIMM
    Mining Open Stopes at Cannington Mine Using a Vertical Retreat Open Stoping (VROS) Method

    Vertical retreat open stoping (VROS) is a variation of sublevel open stoping (SLOS) that has been introduced at Cannington to minimise the influence of subvertical geological structures during stope e

    Jan 1, 2005

  • AUSIMM
    Predicting Iron Ore Fines Shipment Moisture

    By J E. Everett, D Linden, P Maney

    In response to the implementation of a new schedule for iron ore fines in the International Maritime OrganizationÆs (IMO) International Maritime Solid Bulk Cargoes (IMSBC) Code, improved measures for

    Aug 12, 2013

  • AUSIMM
    An Integrated Approach to Proactive Tailings Management

    By T Huynh, K Tungpalan, E Wightman, M Edraki, S Palaniandy

    Most preventive environmental management practices promote proactive integrated approaches to waste management. For example, life cycle assessment is often used to find the ‘hot spots’ of environmenta

    Jul 27, 2015

  • AUSIMM
    Geotechnical Challenges for Underground Commercial Space and Quarrying in Australia

    By A B. Bayooke, A C. Robertson

    In terms of underground tunnelling in metres advance per capita, Australasia compares well with the best world performers. This is because of the large number of metalliferous mines, coalmines and civ

    Nov 5, 2014

  • AUSIMM
    Life-of-Mine Ventilation and Refrigeration Planning for Resolution Copper Mine

    By R G. Moreby, S Bluhm, FávonáGlehn, C Pascoe

    Resolution Copper Mine in Arizona, USA, is planned to be a 2000 m deep panel cave mine with virgin rock temperatures exceeding 80¦C in rock with high crystalline silica content, resulting in a very ch

    Jul 1, 2013