Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Discovery to Production – The Athena Gold MineBy D Howe
The Athena gold deposit was discovered in 2007 by Gold Fields Australia Ltd, at the St Ives Gold Mine, 35 km southeast of Kambalda, Western Australia. Gold anomalism was identified in sheared Paringa
Aug 22, 2011
-
The Obuasi Mine - Longitudinal Retreat Mining Method Application and ChallengesBy F Owusu-Mensah, F Nsarko
The Obuasi Mine has been in operation for the past 100 years. Within this period a host of mining methods have been employed during its various changing phases. The causes for the changes are multiple
Mar 26, 2012
-
Technology change in underground mining – things to considerBy A G. L Pratt
Change and its relationship with the introduction of new technology is a constant of human history. The mining industry has many examples of this relationship. This record contrasts with its present d
Oct 16, 2017
-
Surface and groundwater monitoring and seepage control at the Sungun Copper MineBy N Pirouznia, F Rashidi Nejad, S Naraghi
Sungun Copper Mine, which is the second largest copper mining operation in Iran has a large tailings storage facility with a seepage control dam located downstream of the main dam. Surface and groundw
Jul 23, 2018
-
High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, PhilippinesBy C Harrison, A Bowskill
The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to
Sep 17, 2014
-
Optimisation of Grinding Circuits at the Lead/Zinc Concentrator, Mount Isa Mines LimitedBy Drinkwater DJ, Watsford RMS, Johnson NW, Munro PD
This paper describes the use of modelling and simulation techniques in the analysis and optimisation of grinding circuits at the Lead/Zinc Concentrator of Mount Isa Mines Limited.The objectives of the
Jan 1, 1985
-
Safety of a Tailings Storage Facility against Dam InstabilityBy D Veneziano, J Van Dyck, R Snow, W Pytel, O Zanoli
Best practice standards generally recommend assessment of the environmental and societal risks posed by tailings storage facilities, but they rarely specify how the analysis should be made. As a case
Jul 27, 2015
-
Application of normative ore mineralogy to geological and metallurgical data sets at the Hera Au-Pb-Zn-Ag mine, New South Wales, AustraliaBy A R. McKinnon
The recently opened Hera Au-Pb-Zn-Ag mine in central New South Wales has provided an ideal opportunity to demonstrate the calculation of sulfide ore mineralogy using normative methods. Normative miner
Sep 20, 2017
-
Starting the Journey – Launching of the Legacy Way Open Face Tunnel Boring Machines in Mixed Face Ground ConditionsBy M Norbert, D O’Connor
The mainline running tunnels for Legacy Way comprise two tunnel boring machine (TBM) driven tunnels. Both TBM drives commenced at the Launch Portal adjacent the Mt Coot-tha Road. Excessive surface set
Sep 17, 2014
-
Segmental Tunnel Lining Breakouts and Cross Connection Tunnels – Adelaide Desalination Plant, AustraliaBy L Drowley
The Adelaide Desalination Plant (ADP) draws raw sea water into the facility and returns saline concentrate to the Gulf St Vincent via subsea conduits. This paper describes the detailed design and cons
Mar 8, 2011
-
Experiments on Rock Burst and its ControlBy L R. Sousa, M He
Rock burst is common in deep underground excavations and is characterised by a violent ejection of block rocks from excavation walls. It is critical to understand the phenomenon of rock burst and part
Nov 5, 2014
-
Quantifying economic and environmental impacts of preconcentrationBy E Amini, M Scott
Grade Engineering® involves the planning, integration and operation of coarse preconcentration techniques to reject uneconomic material as early as possible in the mining value chain to improve the qu
Nov 10, 2020
-
Conducting High Chrome Grinding Media Trials at NewcrestÆs Ridgeway ConcentratorBy C J. Greet, J Kinal, C Hitchen
Following the successful completion of a marked ball test defining the potential wear benefits the high chrome alloys may offer against forged steel, as well as laboratory test work investigating chan
Oct 29, 2012
-
Isasmelt and IsaMills ù Models of Successful R&DMIM Holdings Limited has acquired a reputation for the successful application of R&D to develop break-through technologies for the mining industry. The Isa Process tank-house technology has been licen
Jan 1, 2002
-
Preconcentration in the pit – size mattersBy T BoBo, D La Rosa, P Cameron
Efficient pre-concentration using natural and induced deportment starts with effective blast design. Leveraging these characteristics using Size-Based Grade Engineering® techniques requires detailed u
Nov 10, 2020
-
Evolution and technical considerations to manage tailings at the RPP- 140 mining title (Antioquia - Colombia)By García B., Wolff E.
In Colombia, northeast of Antioquia, there is a gold deposit that has produced continuously since the middle of the XIX century, located within mining title RPP-140, property of Gran Colombia Gold Seg
Jun 17, 2024
-
Rwanda and the Africa Mining VisionBy I H. Wilson
After decades of turmoil, Rwanda launched its Vision 2020 in 2000 aimed at reconstructing government and addressing poverty. Implementation focused on the agricultural sector, infrastructure and educa
Jul 16, 2014
-
Risk management for minesite closure planning and execution – start now! Lessons from the closure of the Leigh Creek Coalfield, South AustraliaBy A Querzoli, B Williams
In late 2014 the Flinders Power Management Team was executing business improvement plans to ensure continued electricity generation until 2028 and beyond. Six months later, in June 2015, the Board ann
Jul 25, 2018
-
Geotechnical strata characterisation using geophysics and its application for coal mine designBy T Medhurst
Recent developments in geophysical borehole log analysis using the Geophysical Strata Rating (GSR) are now routinely used in a number Australian coal mining operations. This allows development of 3D g
Nov 30, 2018
-
On-site Process Mineralogy – Linking Departments and Disciplines with the Common Goal of Increasing Plant PerformanceBy D Morgan, K Jones
"In March 2015 Northparkes Mines (NPM) installed a process mineralogy facility on-site. The laboratory included a TESCAN TIMA scanning electron microscope (SEM) and was the first SEM facility to be co
Oct 10, 2016