Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Multiscale Approach to Hydrothermal Gold Systems - Unravelling Mineralisation Processes at the Plutonic Gold Mine

    By J Walshe, G Duclaux, L A. Fisher, R Hough, J S. Cleverley, M F. Gazley

    Characterisation of hydrothermal gold systems across multiple scales is increasingly important for our understanding of ore deposit genesis and for targeting new mineralisation. Published work on mult

    Sep 26, 2013

  • AUSIMM
    Implementation of a Zoned Trigger Action Response Plan Associated with Changing Mine Conditions at Narrabri Mine

    By M Brady, O Salisbury, C Claassen, B Beamish, H Baxter

    Monitoring for signs of elevated spontaneous combustion in the active goaf behind the longwall face is crucial for early intervention of any potential heating incidents. Typically, trigger action resp

    Aug 31, 2015

  • AUSIMM
    Controlled Blasting for Civil Construction in an Urban Environment

    By R Domotor

    Brisbane’s Airport Link is Australia’s largest road infrastructure project, worth a total value of A$4.8 billion. The project is using surface and underground blasting to excavate hard volcanic r

    Nov 8, 2011

  • AUSIMM
    Risk Assessment Models for Post-Mining Land Use

    By C Smith, R I. Maczkowiack, P D. Erskine

    Open cut coal-mining has been conducted in the Bowen Basin region of central Queensland for almost five decades, and has disturbed an estimated area of 140 000 ha of agricultural land until 2011. Appr

    Jul 10, 2012

  • AUSIMM
    Open Pit Production Scheduling Optimisation - Why the Mining Industry Needs a New Phase Design Approach

    The long-term production schedule of open pit mines that maximises the net present value (NPV) of a given project relies on the proper design of phases (pushbacks) within the ultimate pit limits. Ther

    Dec 6, 2010

  • AUSIMM
    Acid Rock Drainage Prevention Using Inert Gas Mixture Technology

    By H Barrie, L Ameglio

    "Current methods for acid rock drainage (ARD) mitigation revolve around insulation of the waste from oxygen in the atmosphere with water and dry (soils and liners) covers. Both are of limited effectiv

    Jul 27, 2015

  • AUSIMM
    Mill Operators’ conferences – a 40-year retrospective and a vision for the future

    By P D. Munro

    On the occasion of the 14th Mill Operators’ Conference and marking 40 years since the first one was held in Mount Isa in 1978, it is fitting to review the history of the Conference and its development

    Aug 29, 2018

  • AUSIMM
    An Aspect of Community Development in a City Based on Mining and Metallurgy-The Case of Wollongong

    Wollongong* is Australia's largest single centre of mining and metallurgy. Wollongong's total employment in manufacturing of basic metal products (over 26,500 in 1972/1973) was almost 50

    Jan 1, 1976

  • AUSIMM
    Minimum Industry Gold Room Security

    Gold rooms represent a high security area and preventing theft is a challenging task. Where gravity concentrates or high value unit intermediate products are present, particular and specific security

    Aug 1, 2010

  • AUSIMM
    Performance of Mono-Layer Evapotranspirative Covers in Response to High Precipitation and Extended Drought Periods in the Southwestern United States

    By Tzung-mow Yao, S Ki, J Word, J Vinson

    Properly designed evapotranspirative (ET) cover systems can greatly reduce the amount of infiltration and groundwater recharge (deep percolation) into potential acid generating mine waste. In arid and

    Jan 1, 2003

  • AUSIMM
    Development of the production optimiser through collaboration between Evolution Mining and Minnovare

    By C McCracken, R Landers, B Hesse

    Minnovare identified the potential to improve production drilling outcomes in underground long-hole stopes through the adaptation of new technology which was under ongoing development. An approach to

    Mar 15, 2021

  • AUSIMM
    Sulfidisation of Ilmenite Concentrates Contaminated with Chrome Spinels – A New Approach to Impurity Separation

    By M I. Pownceby

    High temperature roasting studies on chrome-spinel contaminated ilmenite concentrates showed that sulfur, introduced through a sulfidising roast treatment, selectively reacted with the chromium in the

    Oct 5, 2011

  • AUSIMM
    A geometallurgical approach towards the correlation between rock type mineralogy and grindability – a case study in the Aitik mine, Sweden

    By R Schmitt, Y Ghorbani, I McElroy, N J. Bolin, M Parian

    Aitik is a large copper porphyry type deposit located in northern Sweden, currently exploited at an annual rate of approximately 45 Mt. The ore’s exceptionally low head grade of 0.25 per cent Cu and v

    Aug 24, 2022

  • AUSIMM
    Supply chain approach to iron ore dust monitoring and remediation – Pilbara, WA

    By G Zhao, S Hapugoda, E R. Ramanaidou, P Hapugoda, Y Jin, G O’Brien

    In 2021 the ports of Port Hedland and Dampier in the Pilbara Region of Western Australia handled 900 Mt of iron ore. This ore was produced in the Hamersley’s mines and transported by trains to the por

    Sep 18, 2023

  • AUSIMM
    The Nova Operation: mining, technology and a look into the EV future

    By P Ring, B Cooper, C Carr, G Laing

    The Nova Ni-Cu-Co Operation, located in the Fraser Range of Western Australia, commenced commercial production in July 2017 only five years after discovery. Owned by Independence Group NL (IGO), the o

    Mar 15, 2021

  • AUSIMM
    Challenges in Modelling Large Complex Orebodies at the George Fisher North Mine

    By M Haydon

    How do you portray a large structurally and stratigraphically complex deposit to return a meaningful resource estimation, and produce a geological model that is useable for planning on a daily basis?

    Jan 1, 2006

  • AUSIMM
    Use of alternative drilling technologies during diamond drilling activities at Ernest Henry Mine – a fractured aquifer case study

    By E Philippa, J Vitanza, C Hawtin, B Miller

    B Miller , E Philippa , C Hawtin and J Vitanza

    Mar 22, 2022

  • AUSIMM
    PanAust Limited’s approach to mine waste and tailings stewardship

    By L P. Trout, D G. Reid

    PanAust Limited (PanAust) has successfully constructed and commissioned two mining operations in Lao PDR over the past decade and undertaken major studies for three new mine developments. The managem

    Jul 23, 2018

  • AUSIMM
    El Teniente New Mine Level Project

    By R Pozo, F Reyes

    Codelco Chile is currently developing the El Teniente û New Mine Level Project (NMLP) in order to increase ore production by seeking to mine the ore deposit located under the current operational orebo

    Jan 1, 2008

  • AUSIMM
    Homogeneity assessment of crushed and pulverised iron ore certified reference materials – implications for laboratory quality control

    By J Carter, B J. Armstrong

    Best practice for the submission of samples to an internal or commercial laboratory requires quality control materials to be included for the purpose of independently and comprehensively assessing lab

    Sep 18, 2023