Computational density functional theory study of triazine adsorption on sperrylite (100) surface
By X Zhang, B McFadzean, P E. Ngoepe, B Nemutudi, P P. Mkhonto, S Pikinini
There is still a huge challenge in efficiently recovering the arsenides minerals that are largely concentrated in the Platreef Bushveld Complex which constitutes about 21 per cent of the platinum grou
Aug 24, 2022
-
Hydroseparation Concentrates and Automated Precious Metal Searches Used to Characterise Process Products from Selected Mines
By R Lastra, Y Choi, C Hamilton, P Kondos
Hydroseparation (http://www.cnt-mc.com) was used to concentrate sized fractions (from <38 ¦m to 150 ¦m) of various ore products ahead of carbon-in-pulp (CIP)-treatment. The resulting size-by-size c
Jan 1, 2008
-
Flotation of Unclassified Ball Mill Discharge for the Recovery of the Lead and Zinc Concentrates
The sulphide ore occurring in the North Mine at Broken Hill is of a complex nature, consisting of an intimate mixture of argentiferous galena, marmatite (zinc-iron sulphide), and gangue minerals. A ty
Jan 1, 1933
-
Quantifying Uncertainty in a Narrow Vein Deposit – An Example from the Augusta Au-Sb Mine in Central Victoria, Australia
By A Fowler
The unpredictability of the location, grade and width of narrow-vein deposits presents difficulties for mine geologists and engineers attempting to estimate, schedule, forecast and mine their deposit
Aug 22, 2011
-
Rock Stresses at Ok Tedi, Papua New Guinea
By L Mollison, K W. Mills, N R. P Baczynski, M F. Lee, I A. de Bruyn
This is the first of two papers concerned with rock stress inputs to various mine design issues at the large Ok Tedi open pit mine in Papua New Guinea. The companion paper (also published at this conf
Nov 5, 2014
-
Developing Resilient Water Monitoring Programs in Changing Climate Conditions
By A D. Price, W J. Germs, O Patterson, T R. Weaver
"Understanding controls on groundwater and surface water flow and quality at mine sites throughout all mine stages is critical to effectively manage environmental impacts over the entire mine life. Mo
Nov 26, 2013
-
Limnological Processes in the Development of Acid Pit Lakes
Limnological processes are often overlooked when trying to assess the long-term water quality of pit lakes. It is essential to deal with these aspects, since they determine the geochemical and redox c
Jan 1, 2003
-
Queensland Nickel - Value-Added Products from Technological Advances (c558ef59-3d56-447f-a7ad-fc4833bf589d)
The Yabulu refinery of Queensland Nickel Pty Lld near Townsville now imports more than three million wet tonnes per year of nickel laterite ore from New Caledonia and Indonesia, making it the largest
Jan 1, 1995
-
The designed approach to mill liner optimisation – experience at Pustynnoye mine, Kazakhstan
By J Geronimo, P Kumar, Z Yussupova, M Yahyaei, M Powell
This work goes beyond the general perception of how the well-known mine to mill process can be applied, by applying deeper knowledge along the mining chain. Grade deportment and dilution are considere
Aug 29, 2018
-
Effect of Iron Removal and Reduction on Gold and Silver Extraction by Thiourea Leaching of a Pressure Oxidation Product
By Woodcock J. T, Zhu T, Sparrow G. J
A lead-zinc-pyrite flotation middling was pressure oxidised to give residues containing iron hydroxy sulphates (a mixture of basic iron sulphate (BIS) and a hydrated iron sulphate (HIS)) and lead su
Jan 1, 1991
-
Rock stress measurements – a site geotechnical toolkit
By P B. Hills
Increasingly over the past couple of decades, the importance of understanding the in situ stress regime in underground hard rock mines has become accepted by all. Providers have responded to this requ
Nov 29, 2022
-
Calibrating Comminution Models Using Operating Data to Forecast and Optimise Plant Performance
By A L. Zawadski, B G. Putland
"This paper discusses a method to build a calibrated comminution circuit model, using historic operating data and blend information that is useful for forecasting and optimising plant performance, as
Oct 10, 2016
-
Assessment of Underground Production Blast Designs and Blasting Performance
By B Mohanty, D Zwaan
Systematic near-field vibration monitoring of stope blasts was carried out in a large, deep underground mine. A total of 31 production blasts were studied in order to investigate the effectiveness of
Aug 24, 2015
-
Fine grinding circuit process improvement at the Karara mine concentrator
By H Ishikawa, H Zhou, M Spagnolo, R Halomoan, S Palaniandy
The Karara Mine concentrator commenced operation in November 2012 to produce high-grade magnetite concentrate. The circuit consists of three stages of comminution plus magnetic separation at each stag
Sep 11, 2017
-
Application of Design by Measurement for Support and Pillar Design in Mechanised Room and Pillar Coal Mining in India
By I D. Gregson, A Gandhe, A S. Garcia, K M. MacAndrew
"Falls of ground still cause around one-third of all underground mining fatalities. The recent introduction of mechanised room and pillar working into Indian coalmines is an example of the application
Nov 5, 2014
-
A Decade of Gravity Gold Recovery
By A Bax, G Wardell-Johnson, W P. Staunton, J McGrath, J J. Eksteen
Since 2001, the AMIRA P420 gold processing technology project series has been studying the recovery of gold using gravity devices, with particular emphasis on the centrifugal units, Knelson and Falcon
Sep 26, 2013
-
A Study of Anomalous Copper-Lead-Zinc Values in Relation to Rock Types and Weathering Profiles in an Area North of Mount ISA
In an area north of Mowit Ica chip sampling of limonitic outcrops on a regional scale led to the investigation of a number of areas considered to be geochemically anomalous for copper and zinc. Th
Jan 1, 1973
-
Evaluation of a Single-Layer Desulfurised Tailings Cover
By G W. Wilson, M Aubertin
A desulfurised tailings cover was installed at the Detour Lake Mine in Ontario, Canada, to reduce oxygen penetration into the underlying sulfidic tailings. The cover ranges from one to 1.5 m in thickn
Jan 1, 2003
-
Applications of Exhaust Steam Turbines to The Power Plants of Mines.
The cost of power is an important matter to mining companies generally and this thought that the members of the Australasian Institute of Mining Engineers, as well as the engineering and mining profes
Jan 1, 1911
-
Site Investigation and Design for Melbourne’s New Metro
By H Asche
The Melbourne Metro project has evolved from the Victorian Transport Plan. MM1 is the second major phase of the proposed separation of Melbourne’s radial railway system, creating a line that will oper
Mar 8, 2011