Search Documents

  • SME
    Construction Works Of Large-Section Vertically Parallel Twin Tunnels In Close Proximity

    By Kentaro Kuraji

    INTRODUCTION Background Tokyo, the capital of Japan, is one of the largest cities of the world. As many as 33 million people live in Tokyo and three neighboring prefectures although the city occupi

  • DFI
    Slope Stabilisation Of A Section Of The Thirlmere Aqueduct By The Use Of Spaced Micropiles And Permeation Grouting

    By David Preece

    The Thirlmere aqueduct was constructed over 110 years ago to provide water from the Lake District (in the north-west of England) to the city of Manchester some 60 miles (100 km) away. The aqueduct rem

    Jan 1, 2011

  • SME
    Analysis of the Hydro-fracture Potential Around Water Tunnels in Rock

    By Emad Iskander

    The seepage forces generated around pressurized water tunnels in rock are investigated using the analysis tools of geomechanics. The theoretical background of the two-phase material behavior is explai

    Jan 1, 2008

  • SME
    Development Of An Energy-Balance Model To Predict The Economic Impact Of Installing A Tailings Wash Thickener At The Fort Knox Mine, Fairbanks, Alaska

    By J. T. Hollow

    The Fort Knox Mine is located in Alaska?s interior, where the average ambient air temperatures range from -24°C (-11°F) in January to 16°C (61°F) in July. The mill processes a free-milling gold ore ut

    Jan 1, 2007

  • CIM
    Requirements for Underground Mine Backfill Monitoring

    By David O. DeGagné

    While mine backfill plants are becoming increasingly more automated and instrumented, especially with paste fill operations, underground backfill distribution systems have hardly changed over the year

    May 1, 2001

  • AIME
    Producing - Equipment, Methods and Materials - Practical Use of Recent Research in Multiphase Vertical and Horizontal Flow

    By K. E. Brown, J. P. Brill, A. R. Hagedorn, T. C. Doerr

    A recent correlation for multiphase vertical flow by Hagedorn and Brown1,7 has been used to examine the effect of numerous variables such as pipe size, gas-liquid ratio, liquid flow rate, liquid visco

    Jan 1, 1967

  • SME
    Pitfalls And Lessons Learned In Pump Station Construction

    By Steven R. Lowe

    Construction of a pump station, consisting of an inlet chamber, wet well and pump chamber, required excavation to a depth of 9.7 m (32 ft) below ground surface and more than 7.6 m (25 ft) below the gr

    Jan 1, 2011

  • AUSIMM
    Surface Tensions of Molten Heavy Metal Iodides and Their Relation to Sulphide Paragenesis

    The sulphides can be arranged in a series determined by the relative amounts of ionic and covalent bonding present. This series is similar to the paragenetic series common to most sulphide ore deposit

    Jan 1, 1956

  • AUSIMM
    The Base Metal Mineral Potential of New Zealand as Related to Tectonism and Metamorphism

    An understanding of the origin of mineral deposits and their relationship to local and global geotectonics is essential if regional targets for mineral exploration are to be chosen. Volcanism, metamor

    Jan 1, 1976

  • SAIMM
    Applications Of Fibre-Reinforced Shotcrete (Fibrecrete) Support In Drifts At Nchanga Underground Mine.

    By Simon Mundike, Muwindwa Lipalile

    A scraper based block cave method has been successfully applied to extract the Lower Ore Body at Nchanga since the 1950?s. Since inception, scraper drifts and service ways have been supported using st

    Jan 1, 2005

  • NIOSH
    IC 8865 Underground Metal And Nonmetal Mine Fire Protection - Proceedings: Bureau Of Mines Technology Transfer Seminars, Denver, Colo., Nov. 3, 1981, And St. Louis, Mo., Nov. 6, 1981

    These proceedings consist of an overview of the underground metal and nonmetal mina fire protection research currently being conducted by the Bureau of Mines. The following papers address the areas of

    Jan 1, 1981

  • NIOSH
    MLA 70-86 - Mineral Resources Of The Desatoya Mountains Study Area, Churchill And Lander Counties, Nevada ? Summary

    By David A. Benjamin

    At the request of the U.S. Bureau of Land Management, the U.S. Bureau of Mines studied prospects, claims, and mineralized sites in a 43,053-acre portion of the 51,262-acre Desatoya Mountains Wildernes

    Jan 1, 1986

  • CIM
    In situ testing in underground backfilled stopes

    By Malcolm Scoble, Jean-Marc Robert, Luciano Piciacchia

    "An approach to the in situ testing of mine backfills is outlined. It has been developed to provide a measure of the effective strength and stiffness of such materials after placement in stopes. This

    Jan 1, 1987

  • AUSIMM
    Evaluation of Gippsland Basin Onshore Structures for Compressed Air Energy Storage

    By Wilson D, Kirkland J

    Compressed air energy storage (CAES) uses low cost off-peak energy to compress air and pump it into pressurised underground storage. Expanding the air through a modified form of gas turbine generate

    Jan 1, 1992

  • DFI
    Foundations On Karstic Limestone In Kuala Lumpur Malysia ? Synopsis

    By J. M. Mitchell

    Kuala Lumpur, Malaysia is underlain by karstic limestone. Firm clays, mudstones and siltstoncs of the Kenny Hill Formation overlie the limestone for about two thirds of the city. The remaining third h

    Jan 1, 2010

  • AUSIMM
  • NIOSH
    RI 8758 Corrosion-Resistant Sulfur Concretes

    By William C. McBee

    Sulfur concretes have been developed by the Bureau of Mines as construction materials with physical and mechanical properties that suit them for use in acid and salt corrosive environments where conve

    Jan 1, 1983

  • SME
    Image Issues Could Hurt Canadian Oil Sands Plans

    While the United States and the rest of the world struggles with record-setting oil prices Canadian oil sands producers are ramping up production to meet demand for oil while also fighting against a h

    Jan 1, 2008

  • AUSIMM
    Potential for Revegetating Base-Metal Tailings at the Tui Mine Site, Te Aroha, New Zealand

    By P E. H Gregg, D Horne, R B. Stewart, N Bolan

    The Tui mine site is situated on the NW flank of Mt. Te Aroha, at approximately 400 m altitude. During underground mining operations two lead-copper-zinc ore bodies were exploited and processed on sit

    Jan 1, 1995

  • CIM
    Impact of air distribution profile on banks in a Zn cleaning circuit

    By R. Dahlke, J. A. Finch

    A campaign was undertaken during the greater part of 2001 at Noranda’s Brunswick mine concentrator to investigate the role of gas (air) superficial rate (Jg) distribution to the cells in the final Zn

    Jan 1, 2004