Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Computer Aided Instruction in Materials Science and Engineering EducationBy Hani Henein, J. Barry Wiskel
"The easy accessibility and power of the PC, as well as the education of our engineering students in the use of these tools, are compelling reasons for developing computer aided instructional (CAI) to
Jan 1, 2000
-
Structural Controls on Massive Sulfide Deposition and Hydrothermal Alteration in the South Sturgeon Lake Caldera, Northwestern OntarioBy A. H. Mumin, A. K. Somarin, K. S. Oran
"Synvolcanic structures played a fundamental role in the genesis, morphology, and siting of volcanogenic massive sulfide ores and associated hydrothermal alteration in the Archean South Sturgeon Lake
Jan 1, 2007
-
Use Of The Mining Rock Mass Rating (MRMR) Classification: Industry ExperienceBy Gabriel S. Esterhuizen, Jarek Jakubec
In 2000, Laubscher’s Mining Rock Mass Rating (MRMR) classification system was updated and published. The new system brought a few fundamental changes that were in direct response to the challenges and
Jan 5, 2007
-
In-Situ Recovery in Hard Rock Applications: Idealistic Notion or Realistic Future Processing Option?By L. Vollert
In-situ recovery of metals is presently experiencing a revival not seen since early applications in amenable copper oxide deposits, uranium and generally applications where neither, porosity and perme
Jan 1, 2019
-
A methodology for the statistical and spatial assessment of soil contamination around mining districtsBy S Durucan, A Korre
The application of simple methods of statistical analysis, coupled with geostatistical analysis and geographic information systems, can only summarise and give an outline of the spatial distribution o
Jun 21, 1905
-
IC 7273 Geophysical Abstracts 115 October-December 1943 - 1. Gravitational Methods7133. Clewell, D. H. The Gravimeter. Prec. and Trans. Texas Acad. Science 1941, Austin, Tex., vol. 25, 1942, pp. 86-88. Static gravimeters, unastatized and. astatized, are considered to be the most
Jan 1, 1944
-
Investigating the Correlation between Coal Geochemistry and Coal BumpsBy David Hanson, Sean Warren, Chaparral Berry
"Coal bumps, also referred to as dynamic failure events or coal bursts (Lawson, Weakley, and Miller, 2016), continue to be a hazard in underground coal mines. While current design methods have signifi
Jan 1, 2019
-
Future Viewed with Optimism By the Iron and Steel IndustryBy L. F. Reinartz
ANOTHER year has rolled by. We are twelve months further away from the start of the depression and. therefore that much nearer to recovery. The accumulated needs and wants 'of our lame, virile po
Jan 1, 1935
-
Dashboards, data sources and a modern data platformBy D Bruce
OZ Minerals’ Carrapateena mine is a Sublevel cave mine located in South Australia, approximately 160 km north of the regional centre of Port Augusta. Carrapateena commenced underground development in
Mar 29, 2023
-
The manufacturing of nanoparticles with a plasma process - SynopsisBy J. T. Nel
Non-transfer-arc linear plasma systems are highly suited to manufacturing nanoparticles. In this paper, the manufacturing of such particles with specially designed plasma systems is discussed. In gene
Jan 1, 2010
-
The sleeper pit lake - a successful model for pit closureBy Martin Williams
During the coming decade, many of the first generation of ‘super-pit’ gold and base metal mining operations in North and Latin America will reach the end of their economic lives. The closure of such p
Apr 22, 2003
-
The Back Pressures Associated With Resin Rock Bolt Installations And Methods To Control And Predict It (1a0250a7-1c1e-4686-8a66-dbfc2dd6e095)By Anthony S. Spearing
The vast majority of the estimated 100 million rock anchors installed in mines in the USA per year use resin cartridges (Tadolini and Mazzoni, 2006). About 4.5 million per annum of these are bolts wi
Jan 1, 2009
-
Uplift Micropile Load Transfer In Unsaturated Missoula Flood DepositsBy John N. Cunningham
Despite the wide use of micropiles for rehabilitating and retrofitting existing structures, little is known regarding the load-transfer distribution of grouted micropiles in various soil deposits. Th
Jan 1, 2011
-
Classification of Roof Strata and Calculation of Powered Support Loads in Shallow Coal Seams of ChinaBy G. Song
"SynopsisAccording to the overlying rock strength and thickness of 10 shallow coal seams in China, the strata are classified into four types: weak and laminated strata (hereinafter referred to as WL),
Jan 1, 2015
-
An Overview of Southern African PGM SmeltingBy R. T. Jones
The largest known platinum group metal (PGM) deposit in the world is the Bushveld Complex in South Africa, with the Great Dyke in Zimbabwe also being one of the biggest. It is therefore not surprising
Jan 1, 2005
-
Notes for the Mining Public Concerning Certain Mistaken IdeasTHOSE who dabble in mining are no exception to the general rule that persons who know a little of a subject are apt to think that they know all about it. Some colour may be lent to the belief that any
Jan 1, 1910
-
Shaft construction at the Gold Fields Wallaby mineBy J Graaf, R A. Murrell
Gold Fields Australia is constructing two major ventilation shafts at the Wallaby gold mine in Western Australia. The new ventilation shafts are required to facilitate the long term ventilation strate
Oct 16, 2017
-
Laboratory Baffled-Column Flotation Of Mixed Campbell/Eagle Seam Bituminous Coal – Preprint 97-121By S. K. Kawatra, K. J. Shoop, T. C. Rao, T. C. Eisele
This study investigates the use of a horizontally- baffled column (7.6 cm inside diameter by 344.2 cm high) to reduce the ash content of a high ash bituminous coal. Tests were carried out to determine
Feb 24, 1997
-
IC 8182 Sandstone As Dimension StoneBy Oliver Bowles
Sandstone, a widely distributed siliceous sedimentary rock, is the third most popular building stone in the United States. It is formed by the breaking down of preexisting rocks by weathering, subsequ
Jan 1, 1963
-
Risk model of planned profit from a surface mining ventureBy R. A. Halatchev
A risk model for assessment of the uncertainty in the forecasts of the planned profit is developed. It is based on the selling price of the metal recovered from the ore and the production per shift of
Dec 1, 1996