Search Documents

  • SME
    Understanding Geologic and Mining Conditions for Mine Management Decisions: A Case Study

    By Kevin Andrews, Terry Hamric, Scott Nelson

    "Mining conditions in underground coal mines are dictated by the environment in which the coal seams were geologically deposited. Depositional features can change rapidly, significantly affecting mini

    Jan 1, 2019

  • CIM
    Spiral Surface Property Investigation

    By X. Louw

    "This paper examines the change in surface properties of the Polyurea used on spirals at different operational times: unused spiral, 28 months in operation and 58 months in operation. This is being do

    Jan 1, 2017

  • AUSIMM
    The Occurrence of Gold Antimonide in the Antimony Veins of Costerfield, Victoria

    Gold in the stibnite veins of Costerfield, Victoria, was described in 1922 1, prior to any mineragraphic examination, as (a) free yellow gold (b) free rusty gold and (c) combined gold. The free yellow

    Jan 1, 1952

  • NIOSH
    RI 8849 - Purification of Zirconyl Sulfate by Solvent Extraction

    By D. J. MacDonald

    The Bureau of Mines has conducted bench-scale investigations leading to the design of an integrated process for producing reactor-grade zir-conium oxide (Zr02) from zircon sand, which avoids the air p

    Jan 1, 1984

  • AUSIMM
    Innovations and State-of-the-Art Technologies Employed in the Continuous Casting of Slabs and Beam Blanks

    By Zajber A, Kulchen R, Letzel D, Weyer A, Schwellenbach J

    The search for modem casting plant concepts today focuses more and more on the harmonisation and optimisation of overall concept lines to obtain a continuous quality control and reduce the cost of

    Jan 1, 1999

  • CIM
    The U.S. mineral property evaluation patchwork of regulations and standards

    By T. R. Ellis

    The valuation of mineral properties in the U.S. is only partially regulated. The regulations which have jurisdiction or impact appear to have such mainly as a consequence of unintended fallout, sin

    Mar 1, 2002

  • CIM
    The U.S. mineral property valuation patchwork of regulations and standards

    By T. R. Ellis

    "The valuation of mineral properties in the U.S. is only partially regulated. The regulations which have jurisdiction or impact appear to have such mainly as a consequence of unintended fallout, since

    Jan 1, 2002

  • NIOSH
    RI 9248 - Assessment of Experimental Longwall Recovery Rooms for Increasing Productivity and Expediting Equipment Removal Operations

    By Eric R. Bauer

    The U.S. Bureau of Mines, in cooperation with a southwestern Pennsylvania coal mining company, BethEnergy Inc., Mine No. 60, Eighty-Four, PA, recently assessed the feasibility of using pre driven reco

    Jan 1, 1989

  • SAIMM
    Characterisation studies of Tectonised Clay shales and implications in the excavation of large size tunnels

    By Marco Barla, Mariacristina Bonini, Giovanni Barla

    ABSTRACT: The paper describes the characterisation studies of Tectonised Clay Shales at laboratory and in situ scale. The interest relates to tunnelling under squeezing and swelling conditions, in Ita

    Jan 1, 2003

  • AIME
    Producing – Equipment, Methods and Materials - Prevention of Carbonate Scale Deposition: A Well -Packing Technique with Controlled Solubility Phosphates

    By Karl A. Bauer, Cornelis Bezemer

    The deposition of calcium carbonate scale on surface and subsurface production equipment creates an operation problem in many oil fields. The formation water in which the carbonate-scale-forming compo

    Jan 1, 1970

  • AUSIMM
    Hourly Ownership and Operating Cost Projection - Rubber Tyred Loaders

    Underground equipment owners and users in order to compete and succeed in being viable business propositions must continually balance costs with productivity. By reducing their hourly ownership, ope

    Jan 1, 1990

  • CIM
    Forecasting Potential Slope Failure in Open Pit Mines -Contingency Planning and Remediation

    By Nick D. Rose

    Outline ?Background ?History of inverse-velocity for failure prediction ?Methodolog ?Case Histories ?Three case examples of predicted slopefailure to actual date of occurrence ?One case example

    May 1, 2006

  • SAIMM
    Blast fragmentation optimization at Tarkwa Gold Mine using 6 Sigma methodologies

    By A. Amiel

    Tarkwa Gold Mine is owned by Gold Fields Ghana, IAMGOLD and the Government of the Republic of Ghana in a 71%, 19% and 10% ratio. The mine is operated by Gold Fields Ghana. This large, low-grade, open

    Jan 1, 2008

  • SME
    Carbon Black Production From Waste Tires

    By B. P. Faulkner, M. Weinecke

    Svedala started a development program in 1997 to develop a process to convert waste tires into valuable commodities. A review of numerous approaches revealed short-comings in the various approaches

    Jan 1, 2001

  • TMS
    Multi-scale Solidification Model for Laser Engineered Net Shaping (LENS) Process

    By Hebi Yin

    A two-dimensional multi-scale solidification model was developed to study the heat transfer, fluid flow, and grain growth occurring in the molten pool during the laser engineered net shaping (LENS) pr

    Jan 1, 2010

  • SME
    Health Of The Underground Construction Industry Evident At RETC

    In spite of a global economy that continues to seesaw and a U.S. Congress that is at odds with the president and themselves, cities around the world are still spending billions on their infrastructure

    Jan 1, 2011

  • ISEE
    Algorithms for Adaptive Solutions: Essential Tools for Operational Blast Optimization

    By Sushil Bhandari, Amit Bhandari

    Blast optimization in open-pit operations is a task that often remains at a theoretical stage. Indeed, when it comes to operational blast design and onsite implementation, time restrictions and field

    Jan 1, 2019

  • CIM
    Utilizing Strain Criteria to Predict Highwall Stability Performance

    By H. Warren Newcomen

    Assessments of the stability performance of open pit highwalls have traditionally been based on consideration of surface movement rates. Although generally accepted in industry, this approach presents

    May 1, 2004

  • NIOSH
    IC 9398 Critique Of Pillar Design Equations From 1833 To 1990

    By C. Babcock

    When a flat-lying mineral deposit such as a coal seam is mined, some coal is left to separate the roof and floor so that miners and machines can safely mine the seam. The mineral left is in the form o

    Jan 1, 1994

  • AUSIMM
    The Mount Victor Gold Mine, Eastern Highlands Province, Papua New Guinea

    By Sie A

    After completing a feasibility study in 1987, Niugini Mining Limited (NML) obtained five Gold Mining Leases within PA 632, covering the Mount Victor and Clarkes Ridge gold deposits. Reserves prior

    Jan 1, 1991