Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Detailed Stress Analysis of Longwall Panels

    By Khaled Morsy

    In the past two decades, high horizontal stress has been attributed to many ground control failures. Most believe that entries parallel to the high horizontal stress is most stable and least stable wh

    Jan 1, 2006

  • SME-ICGCM
    Classification of Chock Shields Behaviour in an Indian Longwall Mine in Real Time

    By Srinivasulu Tadisetty

    The productivity and safety of Indian longwall operations are insignificant because of complex geomechanical conditions. Therefore, the continuous monitoring and forecasting of abnormalities is impera

    Jan 1, 2006

  • SME-ICGCM
    Analytical Investigation of Shaft Damages at West Elk Mine

    By Tim Ross

    Several shear failures were observed in Shaft #1 at the Mountain Coal Company, LLC, West Elk Mine, after mining longwall Panel 23, 1,100 ft to the east of Shaft #1. It was speculated that this shear

    Jan 1, 2006

  • SME-ICGCM
    Deriving Input Parameters for Numerical Modeling of Fully Resin Grouted Rock Bolts

    By Michael Alber

    Resin grouted rock bolts are the major support measure in coal mining. They are rather easy and foolproof to install, take immediately load and are the least time consuming support measure for control

    Jan 1, 2006

  • SME-ICGCM
    Design Of Multi-Level Thick Seam Extractions Under Major Aquifers And Considering Spontaneous Combustion Risk

    By D. J. Reddish

    An understanding of the mechanisms that cause large seismic events in a deep mine provides a foundation for designing effective measures to reduce the incidence of these events, as well as reduce the

    Jan 1, 1996

  • SME-ICGCM
    New Type of Load Cell for Monitoring of Roof Bolt Tension

    By K. Unkug

    It is commonly accepted that the tension of roof bolts can be used as a measure of the effectiveness of roof support performance in coal bearing strata. The conceptual base for the assumption orig

    Jan 1, 1986

  • SME-ICGCM
    Roof Bolter Rocker Pad Deflector Systems (6ff5d1f9-2211-4169-8a90-2ad9493ee24a)

    By Arnold Hammons

    Automated temporary roof support (ATRS) systems have been incorporated into roof bolters since the 1970?s. During roof bolting, many injuries have occurred from large pieces of draw rock falling inby

    Jan 1, 2009

  • SME-ICGCM
    Rib Support Innovation At Daw Mill Colliery (a22a0861-1502-4d3d-a2cd-8a6ba0c13271)

    By Jon Bowler

    Daw Mill Colliery, UK Coal, near Coventry in England, mines the Warwickshire Thick Seam at 800 m/2500 ft depth using longwall retreat with gateroads supported by rockbolts. Over the last eight years

    Jan 1, 2009

  • SME-ICGCM
    Numerical Modeling for Roadway Support Systems ? A Comparison for Single and Multiple Seam Mining

    By Axel Studeny

    Geomechanical-numerical methods are an established tool for planning of underground excavations worldwide. By describing the interaction between heterogeneous layered strata and support elements it is

    Jan 1, 2007

  • SME-ICGCM
    A Case History of the Effect of Mine Subsidence on a Concrete Arch Bridge in Northern West Virginia

    By R. B. Alke

    Request to Mine Beneath Bridge The Jabs Run Bridge is a reinforced portland concrete arch filled bridge located on WV Bouts 7 near Pentress, WV. The bridge has a span of 22.9 m (meters) and a height o

    Jan 1, 1984

  • SME-ICGCM
    Time-Lapse Tomography of A Longwall Panel: A Comparison of Location Schemes (919eac95-0539-40b5-9304-f250d4890ab6)

    By Kray Luxbacher

    Three-dimensional time-lapse velocity tomograms were generated to image stress redistribution around a longwall panel to produce a better understanding of the mechanisms that lead to ground failure.

    Jan 1, 2007

  • SME-ICGCM
    Innovation in Rock Mechanics: Iced Tailings As Structural Backfill for the Citronen Mine, Ironbark Zinc Ltd., Greenland

    By Andrew P. Schissler

    The Citronen Zinc-Lead Project is one of the world?s largest undeveloped zinc-lead resources, containing more than 13 billion pounds of zinc and lead metal. The project is located in northern Greenlan

    Jan 1, 2012

  • SME-ICGCM
    Investigating Abutment Load

    By Ihsan Berk Tulu

    In the Analysis of Retreat Mining Pillar Stability (ARMPS) program, the magnitude of the abutment loading adjacent to a gob area is calculated using an ?abutment angle? concept. The extent of the abut

    Jan 1, 2012

  • SME-ICGCM
    Continuous Improvement In Cuttable Coal Rib Support In Australian Coal Mines

    By Ghassan Skybey

    Australian coal mines uses state of the art technology in coal rib reinforcement. This paper highlights the development over the past 15 years in coal rib support technology, along with the advantages

    Jan 1, 1995

  • SME-ICGCM
    Geologic Conditions Affecting Mineability in the Jane Mine.

    By Stephen J. Harven

    Geologic conditions in eight northern operating sections of Jane Mine, Keystone Coal Mining Complex. Armstrong County, Pennsylvania are defined by utilizing drillhole data and underground geologic map

    Jan 1, 1987

  • SME-ICGCM
    Pillar Design Considering the Plastic Behavior of the Coal Seam

    By Andre Zingano

    The variation in pillar behavior at underground coal mines working in the Bonito coal seam is observed in both research and mining company case studies. There is no consistency in pillar behavior, as

    Jan 1, 2012

  • SME-ICGCM
    Geotechnical Mapping By Seismic Imaging In Underground Mines

    By W. J. Mcgaughey

    A crosshole seismic imaging (tomography) experiment has been carried out in an underground mine in order to delineate waste rock within a massive sulphide ore body. Data comprising 1526 travel time me

    Jan 1, 1989

  • SME-ICGCM
    The Unpredictable Life Cycle of a Coal Pillar (b2bcadc5-82a3-454e-be3a-6b79e9867244)

    By Stephen Tadolini

    A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar

    Jan 1, 2007

  • SME-ICGCM
    An Approach to Predict Rock Mass Deformations in Three Dimensions for a Part of an Open Pit Mine and Comparison with Field Deformation Monitoring Data

    By Pinnaduwa H. S. W. Kulatilake, Biao Shu

    The intact rock properties and discontinuity properties for both Devonian Rodeo Creek (DRC) and Devonian Papovich (DP) rock formations that exist in the selected open-pit mine were determined from tes

    Jan 1, 2015

  • SME-ICGCM
    Application of the Coal Mine Roof Rating, Derived from Drill Core, in the Roof Support Design of a Coal Belt Conveyor Tunnel

    By John Rusnak

    The Coal Mine Roof Rating (CMRR) is a practical rock mass classification system for use in design of mine openings. Data can be obtained for this purpose from exploration drill cores if simple geotech

    Jan 1, 1998