Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Overpressure and Ground Vibration for Pipeline Construction Blasting - Measurements and Predictions

    By David Jones, Jeff Bregar, Damien Bell

    We have analyzed overpressure and ground vibration measurements for construction blasting for a large pipeline project. These field-measured levels have been compared to existing prediction curves in

    Feb 1, 2020

  • ISEE
    Blasting, Material Flow & Ore Dilution in Sublevel Cave Mining; State-of-the-Art Review

    By Ayman Tawadrous

    Cave mining offers a flexible technique to exploit large, low grade, deep ore bodies with low operating costs. It is typically done in either a top down approach; i.e. sublevel caving, or in a bottom

    Jan 1, 2015

  • ISEE
    Journal: 100 Years / Zeitschrift für das Gesamte Schiess - und Sprengstoffwesen (Journal for the Fields of Gunpowder and Explosives)

    By (Journal for the Fields of Gunpowder and Explosives) Germany (1914 Issues)

    RBH Note: The following items are a deviation from the usual content of these articles, but I thought they were kind of interesting from an historical point of view (other than just explosives-history

    Jan 1, 2015

  • ISEE
    Presplit Assessment by Signature Hole Blast Vibration with Accelerometer Measurement

    By Remi Proulx, Ruilin Yang

    The effectiveness of presplit in soft or fractured ground is hard to visualize or quantify. There have been many attempts by the blasting community to measure and quantify the effectiveness of prespli

    Jan 1, 2019

  • ISEE
    Investigative Blast Programme on Check Lap Kok - Site for the New Hong Kong Airport

    By Alastair Torrance, George Boucher, Roger Keller

    An investigative blast programme has been carried out to provide information on the best blasting methods to excavate Chek Lap Kok island in Hong Kong for the new airport. The objectives of the progra

    Jan 1, 1992

  • ISEE
    Optimization of Up Raises from Blind-Hole to Multiple Blasting Events Methodology

    By S. Gajardo, E. Valdés Guerra

    Together with Sociedad Punta del Cobre S.A. (Pucobre) and Orica, we are carrying out a study of alternatives for methodology of excavation in Slot Up Raises from actually built with Blind Hole (BH) to

    Jan 1, 2024

  • ISEE
    Journal: Safety Talk / Accident Investigations / Lessons In Prevention for Blasting Safety Managers

    By Ann Barron

    Even though you think your company’s safety program is the best it can be, equipment, processes, supplies, surroundings and people do not always behave or react as expected. Consequently, needless acc

    Jan 1, 2007

  • ISEE
    Improvements in Blasting Technology at Cliffs Natural Resources

    By Scott Giltner, Allan Koski

    Blasting is one of the lowest cost yet most critical parts of the mining cycle. This paper discusses the findings of an audit conducted on the blasting operation at an iron ore mine. The purpose of th

    Jan 1, 2009

  • ISEE
    Journal: Haz Mat 101 / PART 3

    By Tom Snyder, John Brulia

    PART 3 – UN Identifi cation Markings for the Highway Transportation in Commerce of Bulk Explosives, Oxidizers, and Combustible Liquids

    Jan 1, 2015

  • ISEE
    Explosion Hazards and Quantity-Distance Regulations - A Review of their Physical Basis (b24b512b-7da2-4772-bd11-3f3a997ff6c3)

    By B Mohanty

    Currently there exist several explosive quantity-distance (Q-D) rules variously exercised by most countries to protect personnel and property against the effects of accidental explosions. These regula

    Jan 1, 2014

  • ISEE
    A New Approach to 3D Modeling of Blast Free Faces

    By Francisco Sena Leite, Raquel Sobral, Vinicius Gouveia de Miranda, Céu Jesus

    "This document investigates a newly developed technique with the objective of improving terrain triangulation models (horizontal/sub-horizontal and vertical/sub-vertical terrains), mainly blast free f

    Jan 1, 2017

  • ISEE
    Good Blasting Practice: Need for Uniform Standards

    By Richard L. Ash

    A question that frequently arises during litigation concerned with accidents or alleged damages involving blasting is "were the explosives used according to the best known standards"" The question is

    Jan 1, 1975

  • ISEE
    Journal: The Shale Gas Revolution The Technology that made it Possible

    By David Leidel

    A revolution in hydrocarbon well completions within the last thirty years has enabled drillers to tap the resources of known gas plays in an economically viable manner and deliver to market natural ga

    Jan 1, 2014

  • ISEE
    A Need for Drilling and Blasting Specialists

    By Donald H. Matthews

    Drilling and blasting is an every day, sometimes routine activity, that is always fraught with catastrophic capabilities. Under the best conditions it is hazardous, time consuming and expensive. Under

    Jan 1, 1976

  • ISEE
    Designing Blasts with Uncertainty and Tolerance

    By Calvin J. Konya

    When blasts are designed, we normally assume the best case situation. We assume that all burdens and spacings will be properly drilled, holes will be properly loaded, initiators will fire at the nomin

    Jan 1, 1990

  • ISEE
    Benefits of Us DMC_Blast in Open Pit and Underground Mining

    By Dale Preece, Stephen Chung

    Mining and quarrying industries recognize blasting as the most effective method for breaking and removing large volumes of rock. However, the economics of blasting are often offset by the costly trial

    Jan 1, 2002

  • ISEE
    Model Rock Blasting Measures Effect of Delays and Hole Patterns on Rock Fragmentation

    By J W. Edl, F C. Wu

    In instrumented model rock blasting experiments in granite blocks, best fragmentation results were obtained when delays between holes were 1 to 2 milliseconds per ft. of burden and when a rectangular

    Jan 1, 1975

  • ISEE
    How the Blasthole Burden, Spacing, and Length Affect Rock Breakage

    By Norman S. Smith, Richard L. Ash

    Relationships between the three design factors of borehole burden, spacing, and length that control rock breakage were examined by means of reduced-scale bench blasts in dolomite. A set of three indic

    Jan 1, 1977

  • ISEE
    Investigating the Use of Complex Geometry Shock Tunnels to Model Urban Bombings

    By Barbara Rutter, Phillip Mulligan

    This research investigates how changes in shock tunnel geometry affect the pressure versus time waveform. The Large Arena Test Simulator (LATS), which is composed of four different rectangular section

    Feb 1, 2020

  • ISEE
    Journal: 100 Years / MILITARY ENGINEERING (PART IV) MINING AND DEMOLITIONS General Staff, War Office, 1910 LONDON Copyright

    By Robert Hopler

    SECTION 9.---BORING AND BLASTING.*155. Blasting is the operation of bringing down and detaching from its bed or position masses of material by means of explosives.

    Jan 1, 2011