Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    The Computerized Design Program for Tunnel Blasting

    By Jeon Jeon, Yong-Kun Choi, Chung-In Lee, Yong-Hun Jong, Hag-Soo Kim

    In this study, a computer program to design tunnel blasting pattern has been developed. The program consists of two parts; one is for tunnel blasting pattern design and the other is for blasting model

    Jan 1, 2005

  • ISEE
    Vibration Effects on Historic Structures

    By Randy Wheeler

    One of the more difficult topics to address concerns the effects of vibration on historic structures. Not only blast induced vibration, but also vibration from other transient and semi-continuous sour

    Jan 1, 2004

  • ISEE
    Evaluation of the Methods to Determine Constituents of Bulk Commercial Explosives used in the Mining Industry

    By Kush Patel, Gary Cavanough

    Mining operations consume over 2.5 Billion Australian dollars’ worth of bulk explosives annually (Richardson, 2018). Despite the large volume of product used, current practices only conduct a cup dens

  • ISEE
    Detonation Line Standards and Specifications-Someday?

    By James A. McGrath

    "The predominant key word associated with all commercial blasting methods is “safety”. Safetyshould take precedent over all other aspects of the entire explosives industry which on a wholehas had an e

    Jan 1, 1999

  • ISEE
    Close-in Pipeline Trench Blasting – Why PipeBlast Does Not Work

    By N. Skopak, C. Aimone-Martin, J. Redyke, B. O. Meins

    PipeBlast is a spreadsheet-based calculator based on research conducted by Southwest Research Institute (SwRI), used by the pipeline industry to determine if proposed blasting planned near existing pi

    Jan 1, 2024

  • ISEE
    Use of Basic Statistics for the Overlapping Timing Analysis of a Single Blast Hole

    By Lifent Li, Jhon Silva-Castro

    Since millisecond-delay detonators were first introduced, at least two variables, among others, have been more closely considered when timing a mining blast: the accuracy and the precision of the init

    Jan 1, 2015

  • ISEE
    New Methodology for Excavation of High Drawbells With Pre-Loading.

    By Guillermo Lazcano Ríos, Jorge Parvez Aguirre, Alejandro G. Díaz Berríos, Felipe Rodriguez Alveal

    Codelco's Chuquicamata Underground Division (DCHS) faces issues due to collapses in its subsidence streets, which hinders the advancement of the subsidence front and leads to the loss of areas and res

    Jan 21, 2025

  • ISEE
    Modular Ballistic Pendulum for Measurement of Impulse from Tamped Explosives

    By Roland Alford

    The ballistic pendulum is a well-established piece of test equipment originally developed for estimating the velocity of bullets and projectiles. When trying to understand the effects of different tam

    Feb 6, 2023

  • ISEE
    The Possibility of use of the Electronic Initiation Systems in Slovene Mining Industry

    By Julijan Bratun, Joze Kortnik

    Production of technical stone is an important economic branch in Slovenia. In 2009, we had 95 dolomite quarries, 27 limestone and 6 silicates quarries, according to the Ministry of Economic Affairs. T

    Jan 1, 2011

  • ISEE
    Improvement on the Fragmentation Results for Effect of the Reflective Planning Generated by the Pre-Split.

    By Jorge Cárdenas Miranda, Hector Espinoza

    Currently in open pit mining in Peru with double bench, it is a challenge to optimize fragmentation in the drill rows near to the slopes to ensure the performance in the loading and haulage operation

    Feb 6, 2023

  • ISEE
    A Summary of Transportation Incidents and Accidents Involving Class 1 Materials from 1993 to 1998 in the United States

    By Lon D. Santis

    This paper summarizes explosives transportation incident and accident data collected by the U.S. Department of Transportation (DOT) from 1993 to 1998. The paper briefly describes the legislation and r

    Jan 1, 2000

  • ISEE
    The Impact of the Explosive’s Energy on Shovel Diggability in an Open Pit Gold Mine

    By Paulo Couceiro, Juan Navarro

    The impact of rock blasting fragmentation and heave on digging performance in open-pit mining operations is usually the first true indicator of blasting outcomes. Within the typical excavation cycle,

    Jan 21, 2025

  • ISEE
    A Method to Measure Detonation Front Curvature of Emulsion Explosives

    By Nikolaos Petropoulos, Daniel Johansson, Håkan Schunnesson

    The optimization of the explosive performance is of great importance since blasting is extensively used in civil projects and mining industry. An improved understanding of how the energy from the deto

  • ISEE
    Journal: Safety Talk / Standard Operating Procedures

    By Wm. Reisz

    There is no universal standard for Standard Operating Procedures (SOP’s). Every blasting operation has its own unique circumstances, its own methodologies and its own unique demands. It would be nearl

    Jan 1, 2010

  • ISEE
    An Experimental Method of Determining Explosive Equivalency When Scaled Distance Approaches Zero

    By R. Hazael, R. Alford, R. Critchley

    The ability to compare explosives is fundamental. Numerous methods are used and while simple conversion factors are often used, the use of TNT Equivalency (TNTe) is not a simple subject as explosives

    Jan 1, 2024

  • ISEE
    Downstream Benefits of Optimized Drilling

    By Kevin Landey, Eric Gerst

    Expanding blast patterns to near the limit of an explosives’ ability to do the necessary amount of work is a common practice to reduce drilling and blasting costs. Choosing less expensive explosives s

    Jan 1, 2018

  • ISEE
    10th International Symposium on Rock Fragmentation by Blasting - Fragblast 10 (FB 10) 24-29 November 2012, New Delhi India

    By Agne Rustan

    The goal of this paper is to describe Fragblast 10 for those who did not have the opportunity to attend the Symposium and also give some examples of new research findings used in practise in some coun

    Jan 1, 2013

  • ISEE
    Success Case: Technical and Operational Assurance of Blasting Near Neighboring Mine Structures

    By Hector O. Romero, Paulo C. Fernández A, Claudio C. Gajardo

    Phase 06 of the Los Bronces mine, currently under extraction for development, has the particularity of being close to the installations and buildings of a neighboring copper mine. Therefore, the blast

    Jan 21, 2025

  • ISEE
    Elimination of Ground Vibrations and Fly Rock: A Case Study of an Opencast Mine

    By V. Sastry

    Signgareni Collieries Company Ltd. is operating the JK Opencast Project, at Yellandu, with a rated annual capacity of 1.6 Mt of coal with an average stripping ratio of 4.3. This opencast coal project

    Jan 1, 2001

  • ISEE
    Summer Internship Project at an Underground Gold Mine

    By Tristan Worsey

    This work was performed during the summer of 2008 during the junior year of a BS in Mining Engineering. It was observed that the mine was having a problem with back break during the blasting of develo

    Jan 1, 2010