Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Increasing Cast Blasting Benefit with the Use of High Speed Motion Picture Photography and Analysis
By John L. Floyd
The use of explosive energy to displace overburden or waste material can provide substantial savings to operations which normally rely on mechanical means for material removal. To optimize the availab
Jan 1, 1988
-
Using Digital Electronic Detonator of Blasting LS and LDT Buildings
By Zheng Deming, Li Hongwei, Lei Zhan, Dai Chunyang
This paper introduces the application of a digital electronic detonator in the demolition blasting of largescale (LS) and long delay time (LDT) frame-shear structure buildings. The whole building to b
Jan 1, 2019
-
Close-In Construction Blasting -- Impacts and Mitigation Measures
By Andrew F. McKown
This paper will discuss the mechanisms of potential damage from close-in construction blasting, concentrating on two mechanisms: elastic ground vibrations and non-elastic (permanent) ground deformatio
Jan 1, 1991
-
Potential Applications of Ultra High Intensity Blasting, UHIB
By Egonk Arriagada, Jair Alarcon
The efficient use of energy in the ore comminution process is an increasingly important strategic issue for improving the productivity and competitiveness in the mining industry as is in recent years
Jan 1, 2015
-
Coal Recovery Improvement Using Stratablast™ at the Colowyo Coal Company
By Gary Anderson, J. P. Remi Proulx
Rio Tinto’s Colowyo Coal Mine produces 2.1 million tons per year in northwest Colorado. Colowyo uses the terrace mining method to recover up to seven coal seams ranging in thickness from 5 to 20 feet.
Jan 1, 2012
-
Assessment of Damage inRock Subjected to Explosive Loading
By Dal Sun Kim, Michael K. McCarter
"Comminution (crushing and grinding) of rock materials is energy-intensive and expensive. Mucheffort has been directed to improve the efficiency of conventional milling practice, but relatively little
Jan 1, 1993
-
The Prediction of Frequency Content Using Spectral Analysis and Blasting Parameters
By Terry Nichols, Karl E: Warkwick Burgher, Charles J. Wideman
The application of Fourier spectral analysis to records of ground vibration generated by over 100 explosions from an open pit mine is used to develop empirical predictor equations that relate the resp
Jan 1, 1990
-
The Laboratory Determination of Dynamic Pressure Resistance of Cap-Sensitive Explosives
By Michael Wieland
Sharp transient stress waves generated during the delay blasting of underground coal can damage unfired borehole charges remaining in the delay pattern. These tremendous stress pulses in coal bear a s
Jan 1, 1990
-
The Odd Challenges of Backcountry Trail Blasting (1b065404-a403-4c07-96f7-7a9b8e26646e)
By Miie Shields, Ed Billington
Trail blasters for the National Park Service (NPS) live and work in remote mountain terrain throughout the western states, where any support or resupply may be sporadic and ditlicult and mountain weat
Jan 1, 2002
-
Diagnostics of Production Blasts in a Deep Underground Mine
By F. Malek
An extensive blast monitoring program has been carried out to study explosive performance and the effectiveness of blast designs in production blasts in a deep underground mine. Comprehensive monitori
Jan 1, 2013
-
Design of a Passive Underwater Pressure Gauge
By S. Lim, G. Walsh, V. Romero
The cable television show, Mythbusters, contacted the New Mexico Institute of Mining and Technology requesting a pressure gauge to be used in underwater testing. The requirements for the gauge were: i
Jan 1, 2009
-
Production Drilling and Blasting Techniques at the Escalante Silver Mine
By Eddie L. Catbagan
The Escalante silver-bearing deposit, consisting of a relatively wide and continuous quartz vein, contains openings ranging from minute to a few feet wide on the footwall and hanging wall. These openi
Jan 1, 1983
-
Low Level Continuous Vibration and Potential Damage
By Edward J. Jr Walter, Edward J. Walter
The vibration problem is approximately fifty years old. The original investigation of the U.S. Bureau of Mines was begun in 1930. Significant investigation into the problem was done by Crandell, Lange
Jan 1, 1979
-
Optimal Delay Periods and Complex Timing Sequences Using Electronic Delay Detonators
By Y. Idrogo
Electronic delay detonators have been used in most types of blasting application with great success, with the accuracy and precision being used effectively to control negative environmental impacts li
Jan 1, 2018
-
Large Scale Measurement of Velocity of Detonation
By Alastair Torrance, Braden T. Lusk, MinGi Seo, Gary Cavanough
Velocity of Detonation (VOD) is the most commonly used method to determine explosive performance as VOD is a function of the confinement (ground conditions) density and composition of the explosive. T
Jan 1, 2019
-
Digital Shock Tube
By Theirry Bernard
The era of non-electric systems as an initiating system has revolutionised the blasting world by introducing a very safe initiating system that is reliable, with initiation sequence possibilities that
Jan 1, 2007
-
Near-Field Elastic Ground Response Spectra for Multi-Hole Surface Explosions
By G E. Frantii
In the exploitation of low grade mineral deposits, blasting engineers are vitally concerned with maximizing the efficiency of explosive fracturing of rock while simultaneously limiting deleterious env
Jan 1, 1977
-
Diameter-Effect Modelling in Unconfined Steady Non-Ideal Detonations
By Paulo Couciero
Since explosives are the source of all energy used for rock blast fragmentation and heave, multidimensional effects in the detonation driving zone become essential to better describe the detonation pr
Jan 1, 2019
-
Prediction and Determination of Explosive-Induced Fracture
By J R. Hearst, T R. Butkovich
Explosive-induced fracturing and permeability enhancement far from a free face were studied. A one-dimensional computer program, SOC, was used to predict the total failure-associated distortional stra
Jan 1, 1976
-
Facing the Drilling and Blasting Difficulties at Helwan Quarry, Egypt
By M. Khaled, K. Abdel Rahman, M. Khattab
Helwan limestone quarry is located at a distance of 35 km (21.7 miles) to the south of Cairo downtown. Drilling and blasting operations are used to extract the limestone for the Helwan Cement Company
Jan 1, 2008