A Novel Method For Assessing The Reuse Of Under Reamed Piles As Part Of The Southbank Place Project
By Stuart Hardy, Xiangbo Qiu
The South Bank Place project comprised the redevelopment of the iconic Shell Corporation headquarters in Waterloo, located on the Southbank of the River Thames in central London. The site was original
May 1, 2022
-
Execution of Diaphragm and Cut-Off-Walls in Rock – Applications, Performance and Limits
By Albert Neumann, Franz-Werner Gerressen, Giancarlo Santarelli
"Diaphragm walls are known as underground structural elements commonly used for retention systems and permanent foundation walls or elements. In addition they are also quite often used as deep groundw
Jan 1, 2016
-
A Review Low Strain Integrity Testing Practices In India And Complexities Involved In Evaluation Of Test Results
By RavikiranVaidya, Vishal Dhamecha
Low Strain Pile Integrity Testing has been used in India since 1990’s and several have tried to demonstrate the utility and benefits of this method. However, use of this technology was limited till 19
Sep 1, 2022
-
TECHNICAL NOTE: Direct Solution of the Brinch-Hansen 90% Pile Ultimate Failure Load
By Don W. Dotson
In 1962, Kondner prepared several papers dealing with hyperbolic stress-strain response of cohesive soils. The following year, Brinch Hansen proposed 80% and 90% failure criteria for stress-strain be
Aug 1, 2013
-
Design And Construction Of Underground Basin Using Composite Slurry Wall 500 Feet Away From The Pacific Ocean
By Ihab Allam PE, Meeok Kim. PE. Ph. D
The wet weather equalization basin (EB) planned for Pacifica, CA is a 45 feet deep rectangular shaped underground water tank containing over 2.1 million gallons of water, and located only 500 feet awa
-
Session 24 "Compaction Grouting and Consensus Guide"
By Richard Berry
The spacing of grout injections is typically about 2 to 2 V½ meters if the purpose of the grouting is densification of the in-situ soils. Hole spacing will vary with the in-situ soil properties and th
Feb 10, 2003
-
The Waterloo Barrier - A Sealable Joint Steel Sheet Piling For Groundwater Control And Remediation - Presented At The Deep Foundations Institute Annual Meeting & Conference Toronto, Ontario, October 15-17, 1997 - Summary
By Murray Gamble
A new type of groundwater cutoff wall has been developed at the University of Waterloo. The Waterloo Barrier? is a steel sheet piling system that incorporates a sealable cavity at each interlocking jo
Jan 1, 1997
-
Bertha Rescue Shaft – SR99 Tunnel
By Lance Rasband, Richard Hanke
"Seattle Tunnel Partners (STP) started mining on Seattle’s SR99 tunnel on July 30, 2013, working slowly through a 15 ft (4.6 m) thick fiber-reinforced concrete headwall. Once through the headwall, the
Jan 1, 2015
-
Deep Stabilisation in Sulphide Soil for Embankments in Sweden - Laboratory and Field Studies
By Bo Westerberg, Mattias Andersson, Yvonne Rogbeck
"Deep stabilisation has been used in Sweden for decades. The method has been improved to allow it to be used in different types of soils and with new binders. One challenging soil type in Sweden is so
Jan 1, 2015
-
Foundation Behaviour Of A Large HS-Train Viaduct After 4 Years' Operation
By Michel Bustamante
The Arbre viaduct, 200 metres long, is the most important structure on the Belgian portion of the High Speed Train line between Paris and Brussels. The particular geotechnical conditions of the soil w
Jan 1, 2002
-
Building Above And Excavating Below An Iconic Building In Manhattan
By John S. Civetta, Seth Martin, Marc J. Gallagher, Arthur J. Alzamora, Ronald Peralta
The Crown Building, built circa 1921, is a 26-story iconic building located at West 57th Street and Fifth Avenue in the heart of Manhattan. The paper highlights collaboration between the geotechnical
-
Sustainability Assessment of Deep Foundations: Case Study
By Krishna R. Reddy, Jyoti K. Chetri, Girish Kumar
Geotechnical engineering encompasses a major portion of the civil and infrastructure projects. The large amounts of energy and resources typically used in these projects leads to undesirable emissions
Jan 1, 2019
-
Retaining Wall Installation Beneath An Existing Structure
By Kenton W. Braun
Concourse B at the Anchorage, Alaska International Airport is currently being renovated while retaining the original building structure and foundations. Part of the renovation includes the installati
Jan 1, 2008
-
Session 26 "Groutability and Grout Evaluation"
By Peter Yen
This session consists of five papers. Three involved research on the properties of grout materials, specifically ultrafine cements and polyurethane grouts. Two papers present the development of soil g
Feb 10, 2003
-
Installation Of Drilled Piers In Shales ? Synopsis
By A. C. Ackenhell
The geologic environment of Pittsburgh, Pennsylvania is both inviting and challenging to drilled pier installation. The shales and clayey soil zone of the hills are favorable but the alluvial soils of
Jan 1, 2010
-
Geophysical Methods For Site Characterization For Marine Foundations
By Richard E. Sylwester
Evaluating surface and subsurface conditions for marine foundations (bridges, causeways, terminals, etc.) is often done with a limited amount of data. Subsurface information for these projects is pri
Jan 1, 2013
-
Seepage Barrier Mix Design Development, Installation, and Evaluation
By George W. Little, John Councilman
"The selection, evaluation, and modification of contractor mix designs for self-hardening seepage barriers, completed by the slurry trench excavation method, can be one of the most critical and challe
Jan 1, 2016
-
Large Diameter Helical Piles for Refinery Expansion
By Chris Normand, Paul Volpe, Eric Wey, Howard Perko, Burt Ogilvie, Patrick Murray
"A refinery expansion project for Marathon Petroleum Company in Southern Louisiana required existing medium to large pipe racks to be expanded for additional capacity. Foundation modifications were ne
Jan 1, 2017
-
Field and Laboratory Mix Trials for a Deep Soil/Cement/Bentonite Cut-Off Wall Using CSM Equipment
By Russell J. Denny
"A 25m deep cut-off wall is required for environmental remediation of a Former Chlor-Alkali Plant. Extensive trials were conducted to verify the effectiveness of the mixes proposed, with the requireme
Jan 1, 2015
-
Quality Assessment of Seismic Data Sets and the Impact on Interval Velocity Estimates in DST
By Gerald Verbeek, Erick Baziw
"Downhole Seismic Testing (DST) is an important geotechnical testing technique for site characterization as it provides low strain (<10-5) in-situ interval compression (Vp) and shear (Vs) wave velocit
Jan 1, 2017