    Holding Back The Watchung Mountains

    By Ryan C. Linthicum

    A system of steel sheeting and multiple levels of high capacity double corrosion protected soil anchors were used to restrain a major slope failure that occurred at the base of the Watchung Mountains

    Jan 1, 2003

  • DFI
    Case History: Large Diameter Micropiles for the Highway 53 Relocation Project

    By Nathan W. Iverson, David S. Graham, Paul J. Axtell

    "The Highway 53 relocation project in Virginia, Minnesota, involves construction of a very tall bridge across a currently inactive iron ore mine pit. The inactive pit is partially flooded and serves a

    Jan 1, 2017

  • DFI
    Lateral Earth Pressure On Lagging In Soldier Pile Wall Systems

    By Howard A. Perko

    Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me

    Jan 1, 2008

  • DFI
    Rehabilitation Of Tilted Large Drainage Caisson ? Synopsis

    By M. A. El-Sohby

    The paper describes some problems encountered with the foundation of a deep drainage caisson constructed on the Nile Bank in Cairo. The use of suction dredging while sinking the caisson led to a pipin

    Jan 1, 2010

  • DFI
    UB Digs Deep and Builds Over Adjacent Subway for New Medical Building Hub

    By Lisa R. Papandrea, David Chen, Walter E. Kaeck

    "Construction of the University at Buffalo’s new School of Medicine and Biomedical Sciences (UB-SMBS) required excavation in variable ground to a depth of more than 40 ft adjacent to the NFTA Metro su

    Jan 1, 2016

  • DFI
    250 M Ultra Deep Milled Diaphragm Wall: The New Frontier for the Cut off Wall Depth has Been Doubled by Trevi Group Technology

    By Maurizio Siepi, Stefano Trevisani, Pagliaccim Federico, Daniele Vanni

    "Abstract: The paper describes a large innovative project completed in 2012-20123 by Trevi Group, to develop equipment capable to install ultra-deep diaphragm wall. The project highlights the capacity

    Jan 1, 2014

  • DFI
    Soil Nail And Jet Grouted Excavation Support Wall At Peirce Mill Dam

    By Eric M. Klein

    As part of the Woodrow Wilson Replacement Bridge project several damaged wetland and environmental areas were to be mitigated. One of the mitigation projects consisted of constructing a Denil fish lad

    Jan 1, 2006

  • DFI
    In-Situ Permeability Testing For Cement-Bentonite Cutoff Wall ? Lessons Learned

    By François G. Bernardeau

    Cement-bentonite (C-B) slurry walls have been used for ground water cutoff in deep excavations, contamination containment, and other applications. Hydraulic conductivity is of great concern for cement

    Jan 1, 2008

  • DFI
    Ground Improvement for the Distressed Earth Bund Using Stone Column - A Case Study

    By M. Kumaran, A. Vetriselvan, A. Purantharan

    "This paper presents a case history of evaluating the stability of a distressed earth bund and rectification measures carried out. A 5.45 km long, 7m high earth bund for drinking water storage was con

    Jan 1, 2017

  • DFI
    Advances in Stress-Wave Nondestructive Testing Methods for Evaluation of Deep Foundations

    By Joseph T. Coe, Siavash Mahvelati, Alireza Kordjazi

    This paper introduces recent advances in stress-wave NDT systems for use in assessments of in-service foundation integrity and drilled shaft construction. The primary results of the laboratory experim

    Jan 1, 2018

  • DFI
    Sonic Drilling Offers Quality Control And Non-Destructive Advantages To Geotechnical And Construction Drilling On Sensitive Infrastructure Sites

    By John P. Davis

    The use of conventional, circulatory air rotary and fluid rotary, cased and uncased drilling methods in the vicinity of sensitive infrastructure can have deleterious effects on the ground conditions s

    Jan 1, 2006

  • DFI
    Deep Excavations And Foundations For Locks ? Synopsis

    By B. H. Moore

    Foundation and excavation problems associated with lock construction projects vary widely. Each lock requires a different foundation to respond to a unique geologic setting. The range of heights and f

    Jan 1, 2010

  • DFI
    Securing Rail Infrastructure in Romania

    By Andreas Brandner

    "At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors

    Jan 1, 2017

  • DFI
    Spin-Fin Pile Technology

    By Dennis Nottingham

    Spin-fin pipe piles can develop large loads in tension, thus have evolved as a foundation product of great potential. Currently, over 500 spin-fin piles have been used successfully in dolphins, docks,

    Jan 1, 1990

  • DFI
    New Technology For An Old Seawall: Micropile Installation At Ellis Island National Park In New York Harbor

    By Helen D. Robinson

    The seawalls that surround Ellis Island were constructed in the early 1900s and now show varying degrees of deterioration. An innovative approach to the structural repair of the seawalls was develope

    Jan 1, 2008

  • DFI
    Experiences From The Italian High Speed Rail Network AV Construction

    By Vincent Jue

    In December 2009, the Italian High Speed Rail Network AV began running over the full 1000 km system length from Turin, at the foothills of the Alps to Salerno, on the seacoast south of the volcano Mt.

    Jan 1, 2010

  • DFI
    Deep Caisson Foundations In China ? Synopsis

    By C. Y. Liu

    This paper principally deals with the application of caisson foundation in the Chinese bridge building industry, the different types of caisson foundation adopted, and their spheres of application. Ca

    Jan 1, 2010

  • DFI
    The Realities Of Foundation Engineering ? Synopsis

    By J. O. Osterberg

    The realities of foundation enginering are that the work never proceeds exactly as expected. The various reasons, exploration, design, construction, and legal are discussed. Case histories are present

    Jan 1, 2010

  • DFI
    Seal Slab / Steel Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents results from model and full-scale tests to assess the interface bond between a cast-in-place concrete seal slab and steel H-piles in cofferdams. Three different seal slab placemen

    Jan 1, 2013

  • DFI
    Recent Experience With The Omega Pile And New Applications - Synopsis

    By Maurice Bottiau

    The recent evolution of the piling market clearly shows a growing demand for screw piles with soil displacement. The recently developed Omega Screw pile ful-fill these new expectations, combining the

    Jan 1, 1996