Water Powered Percussive Downhole Hammers – Energy Savings And Productivity
By Shyam Chengalath, Johan Jeansson, Magnus Hörman
Down-The-Hole (DTH) drilling usually uses compressed air to power the hammer. However, there are now DTH hammers on the market which instead of compressed air use high pressure water to power the hamm
Sep 1, 2022
-
Data Drives Herbert Hoover Dike (Hhd) Rehabilitation Efforts
By Michael Arnold, Jignyash Manyam, Yoav Rappaport
The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun
Oct 1, 2022
-
Construction of a Deep Soil Mixed Cut-Off and Retaining Wall in Richmond BC
By Keith MacKay, John Carter, David Siddle, Fernando Faminia
"The River Green Residential development, is located in the municipality of Richmond, BC adjacent to the Fraser River. Ground conditions at the site consisted of medium to fine grained alluvial sands
Jan 1, 2016
-
John F. Kennedy Airport Site Redevelopment: Tapertube Pile Foundation
By Gisele R. Passalacqua, Aly Mohammad, Joanna Smith
The $13 billion John F. Kennedy (JFK) airport construction redevelopment program includes new terminals and buildings that are supported on piles to meet the airport expansion demand due to increased
-
Nicholson In The Neighborhood: Virginia’S North Hill Project
By Dominic Ammon, Mark Rothbauer, Paul Landers P. E.
Across the Potomac River from the location of the DFI47 Annual Conference (October 2022), in Alexandria, VA, two large permanent anchored walls with a decorative shotcrete face were recently construct
Oct 1, 2022
-
Urban High Capacity Deep Foundation Solutions in Sites with Complex History and Geology
By Karen C. Armfield, Gisele R. Passalacqua, Joanna Smith
New York City is an urban environment with a history spanning over 200 years. The coastline of New York has changed over the years. In the East River, old bulkhead and remnant of relieving platforms t
Jan 1, 2019
-
Predicting Geotechnical Drilled Shaft Capacity: Are We Close?
By James G. Ulinski, Sebastian Lobo-Guerrero, Vishal B. Patel
"Recently modified design equations used in the transportation industry to calculate side friction and end bearing capacity for drilled shafts are now providing more realistic estimations of capacitie
Jan 1, 2017
-
Excavation Support by Deep Soil Mixing- Challenges on Depth and Long Term Exposure
By D. Barber, A. D. Miller, P. A. Bray
The project was to develop an area within the existing West County Wastewater Treatment Plant which would enable the construction of a new Raw Wastewater Pump Station (RWPS) with a footprint of approx
Jan 1, 2017
-
An Enhanced P&H Tensionless Pier Foundation for Onshore Wind Turbines
By Yazen Khasawneh, Osvaldo P. M. Vitali, Mohammad Nassim
The demand for renewable energy is growing as the conventional energy resources are becoming more limited and we are more conscious about the negative impact of conventional energy sources on the envi
Sep 8, 2021
-
The Need For Air Control In Down The Hole Hammer Casing Advancement Drilling
By Frank J. Purcell
“Down The Hole” (DTH) hammer drilling is often necessary to advance the casing during pile construction where the test bores have determined difficult drilling conditions with obstructions such as bou
Nov 1, 2022
-
Drilled Shaft Design, Testing and Construction in New Jersey Turnpike - Case Studies
By Abu B. Siddique, Anthony S. Crincoli
"The New Jersey Turnpike Section 2 widening program consisted of widening between Interchange 6 in Mansfield Township, Burlington County and Interchange 9 in East Brunswick Township, Middlesex County.
Jan 1, 2015
-
Emergency Stabilization to Maintain CN Rail Service
By Rick Deschamps
"Fountain Slide is located approximately 10 mi (16 km) northeast of Lillooet, British Columbia, Canada, within the Coastal Mountain Range, and has been locally active since the 1970s. The project site
Jan 1, 2017
-
Jet Grouted Foundation for 57-Story Tower
By Robert Alperstein, Nidal AbiSaab, Joe Pastore
"This paper describes the design and construction aspects of the foundation support for a 57-story building currently under construction in lower Manhattan. The site is located near the East River wit
Jan 1, 2016
-
Overcoming Constructability Challenges for Drilled Displacement Pile Installation in Difficult Geology
By A. Rod Kern, Michael A. McNicholas, Yaser Taheri
Deep foundations were required for construction of an 18,000 ft2 (1,672 m2) 4-story office building and an adjacent 23,750 ft2 (2,206 m2) 5-story parking garage in Queens, New York due to an existing
Jan 1, 2019
-
Large Diameter Open-End Pipe Pile Driveability Analysis Including Geotechnical Friction Fatigue
By Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
Large diameter open-end pipe piles are increasingly used as deep foundations to support heavy onshore and offshore structures. During the driving process, several factors such as subsurface conditions
Jan 1, 2019
-
Data Collected and Lessons Learned from Load Test Program for ACIP Piles Supporting Highway Bridges
By Reinaldo J. Villa, Joshua C. Adams
The I-395/SR-836/I-95 reconstruction project is an $818-million design-build construction effort that includes construction of viaduct, segmental and signature bridges in Miami leading into Miami Beac
Sep 8, 2021
-
Deep Foundations for Top-Down Construction of High-Rise Project
By Martin B. Hudson, Kenneth S. Hudson, Gwendolyn Arreguin
A twin high-rise project site in Century City posed several foundation engineering challenges for the design team. One portion of the twin high-rise project site was required to utilize top-down const
Jan 1, 2019
-
Design, Installation And Performance Of Earth Retention System To Limit Ground Movements Around Sensitive Structures In Washington, Dc
By Douglas R. Hardin, Stanley L. Worst, Joanna Mason
A challenging earth retention project presented itself in Washington, DC in the backyard of the historic House of the Temple (The Scottish Rite of Freemasonry, Supreme Council 33°). Located at 15th St
Oct 1, 2022
-
Creative Solution For Sydney Data Centre
By M. Krzaninski, Y. Zou, A. Frost
The foundation solution for a data centre building in Sydney, Australia comprised two alternatives, the first of which incorporated the use of CFA piles founded in rock at approx. 27m depth to support
Nov 1, 2022
-
Horseshoe Secant Compression Shoring System For Tunnel Repair
By Karen Talbot, Noah Maier, Rob Jameson, Giuseppe Gaspari
A storage and drainage tunnel advancing below I-75 in Detroit, Michigan experienced sudden subsidence. The Tunnel Boring Machine (TBM) was damaged to the extent that its shield, cutting head and exten
Oct 1, 2022