Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Problem-Solving Curriculum for Metallurgical Process Engineering

    Part of a four-year course in metallurgy, dealing with metallurgical process engineering, was designed for students to acquire knowledge and skill from physical science, metallurgy, process engine

    Jan 1, 1984

  • AUSIMM
    Current Practice at the C.S.A. Mine Concentrator, Cobar

    By King CJ

    The C.S.A. concentrator of Cobar Mines Proprietary Limited was expanded in 1974 to treat 80 000 tonnes of copper-lead-zinc ore per four week period. Jaw crusher product is fed to two par- allel prim

    Jan 1, 1978

  • AUSIMM
    Human Relationships in Mining Towns - Non Integrated and Integrated

    A unique set of circumstances has devel oped in the Mt. Newman Mining Co. Pty. Limited's project in the Pilbara because the mining town of Newman was built almost entirely by the Company where

    Jan 1, 1973

  • AUSIMM
    Artificial Neural Networks Applied to Mineral Potential Mapping - Case Studies for Iron Oxide Copper Gold (IOCG), Platinum Group Elements (PGE) and Orogenic-Gold Deposits in the Amazon, Brazil

    By E P. Leite, L A. Magalhpes

    The Amazon Craton is one of the largest cratonic areas and comprises one of the est-endowed metallogenic provinces in the world. It hosts a number of different ore deposit types for which a variety of

    Jan 1, 2008

  • AUSIMM
    Trends in Iron and Steelmaking Refractories

    By Fitchett K

    Refractory application in the major iron and steelmaking units are discussed. Mechanis- ms of refractory consumption as revealed by pre- vious studies are reviewed and current practice is evaluated.

    Jan 1, 1972

  • AUSIMM
    Industrial Relations in the Broken Hill Mining Industry - A Discussion (c958f930-cad7-4b69-bb46-c2381098ff91)

    As world demand for various minerals increases the mining industry in its endeavour to satisfy this demand will, eventually,look to the extraction of orebodies which previously may have been uneco

    Jan 1, 1975

  • AUSIMM
    Screening Process: Modelling and Application of the Model to Sizing of Screens

    By Rubisov DH

    This paper is related to the problems of the mathematical modelling of vibrating screening process and to predicting the screening operation results. The authors propose a model of screening based o

    Jan 1, 1993

  • AUSIMM
    Leaching of sulphated calcine

    Fluid bed sulphation roasting followed by leaching at low pH was developed as a means of separating copper and bismuth from a mix- ture of flotation concentrates and flash fur- nace flue dust. A 65

    Jan 1, 1986

  • AUSIMM
    Computer Packages For Chemical Modeling of Aqueous System - Blind Faith!

    Predictive chemical models facilitate the selection, design and assessment of aqueous chemical processes. The development of expertise in aqueous themochemistry has not matched the explosion in comput

    Jan 1, 1996

  • AUSIMM
    Determining the Distribution of Gold in Pyrite Arsenopyrite Material from its Response to Bioleaching

    By Smith T

    Bacterial oxidation is often attributed with the advantage that a high level of gold recovery can be obtained at a relatively low level of sulphur oxidation. This is sometimes attributed to the bact

    Jan 1, 1991

  • AUSIMM
    Mining and the Environmental Protection Legislation in N.S.W.

    In September 1980 the N.S.W. Environ- mental Planning and Assessment Act was gazetted. This legislation created a new arena of government involvement in the procedure for obtaining approval to open

    Jan 1, 1983

  • AUSIMM
    Mineral Reserve Reporting For Government Requirements

    By Morrison J

    Considerable confusion is to be found in the methods of estimating mineral reserves. The solution appears to be more cooperation between industry and government to agree upon a classification syste

    Jan 1, 1979

  • AUSIMM
    Thermodynamic Properties and Phase Diagram of the Binary Alloy System Gold-Nickel

    Activity-composition-temperature relations for both gold and nickel have been determined for the solid and liquid states of the gold-nickel system by the application of the Margules equations. These r

    Jan 1, 1971

  • AUSIMM
    Engineering of a Modern Coal Preparation Plant

    The detailed engineering of a coal preparation plant is important from the point of view of optimum constructibility, operational security, ease of maintenance, operating costs, meeting environment

    Jan 1, 1982

  • AUSIMM
    Simulation of Grinding and Mineral Liberation Processes in Industrial Circuits: A Non-Linear Model

    A universal grinding circuit model suitable for an arbitrary structure of flowsheet has been suggested. In this model classifiers and mills are described in a most general form. What puts the model

    Jan 1, 1993

  • AUSIMM
    Findings of Trials to Improve Bolt Installation Quality in Undergronnd Coal Mining

    During the period May to July 2003, East Mine overcored and recovered from goaf edges a total of 55 1.8 metre CVX grade bolts to analyse installation quality. Some 95 per cent of the pneumatically (ha

    Jan 1, 2003

  • AUSIMM
    The Effect of Aluminous Goethite on the Evaluation of Bauxite Deposits

    The mineralogy of ten trihydrate bauxites and their leached residues from bomb digestion tests at 140, 180 and 2400C was investigated and the resultsòcorrelated with analytical data. It is shown th

    Jan 1, 1973

  • AUSIMM
    Aggressive Productivity Improvement: Killing Waste and Adding Value Using True TQM

    Extensive personal experience in the USA and Australia has shown that Australians working in suitable work environments are capable of world-class performance. To build such work environments, minin

    Jan 1, 1995

  • AUSIMM
    Future Directions in Australian Contract Mining

    The Australian underground contract mining industry has grown from almost nothing 25 years ago to the point today where half the countryÆs underground mines are using contractors to produce their ore

    Jan 1, 2005

  • AUSIMM
    Introduction to the Project

    The mining activities on the North Mine leases have, over the years, followed the orebody from the shallower depths at the southern end of the lease as it continued northwards at progressively increas

    Jan 1, 1957