Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Use of Genetic Algorithms in Underground Mine Scheduling

    By Schofield D

    The problem of production scheduling is sufficiently complex to negate the use of many conventional optimising techniques as there are numerous and diverse factors that must be considered when tryin

    Jan 1, 1995

  • AUSIMM
    Development in Elevated Temperature Ground of the 500 Orebody Mount Isa Mines

    By T Davis

    The 500 orebody in the upper levels of Mt Isa Mines in north-west Queensland was mined by sublevel caving and block caving from 1962 to 1969. The hot and reactive rock mass of this orebody provided si

    Jan 1, 2008

  • AUSIMM
    Coal Mine Modernisation and Production Reliability in China

    By Jiang G

    The Chinese Central Government attaches great importance to the development of its coal industry. Besides carrying out the policy of simultaneous development of large, medium and small coalmines,the m

    Jan 1, 1991

  • AUSIMM
    Paper No. 186. The Electrolytic Refining of Auriferous And Argentiferous Copper at Lithgow, in New South Wales.

    FOR some reason there is not any extensive literature in print on the electrolytic refining of copper, although the method is in general use in America and Europe. In Australia there are but three pla

    Jan 1, 1911

  • AUSIMM
    Stability Control and Monitoring in Deep Latrobe Valley Open Cuts

    By Fraser CJ

    Stability control plays a prominent part in the planning and execution of coal winning in the deep open cuts in the Latrobe Valley operated by the State Electricity Commission of Victoria (SECV). D

    Jan 1, 1982

  • AUSIMM
    Water Jet Drilling for Large Diameter Stress Relief Borehole in Cole Seam

    By Higuchi K, Sekimoto Y

    In this report,the results of the large diameter drilling tests in coal seams assisted with water jet are described. The stress relief in coal seams by this new method is as effective as by the co

    Jan 1, 1987

  • AUSIMM
    A Review of Progress in Shear-Flocculation

    Shear-flocculation is one of a munber of potential processes for upgrading deposits of finely-grained minerals and, more generally, for separating different types of particles suspended in a fluid.The

    Jan 1, 1993

  • AUSIMM
    The Depositional Setting of Ohai Coals as Inferred from Coal Petrography

    Upper Cretaceous and Eocene coal measures of the Ohai Coalfield are stratigraphically complex, and coal seam geometry and quality are influenced by washouts and partings resulting from accumulation in

    Jan 1, 1983

  • AUSIMM
    Resources of Mineral Sands, What of their Future?

    In 1985 BMR assessed Australia's economic demonstrated resources of mineral sands as follows: rutile 8.0 Mt, ilmenite 41.4 Mt, zircon 11.5 Mt, and monazite 229 000 tonnes. These resources are

    Jan 1, 1986

  • AUSIMM
    Hilton Mine Dewatering-North West Queensland, Australia

    By Whincup P

    Hilton deposit comprises en-echelon silver-lead-zinc orebodies with reserves in excess of 50 million tonnes. The host rock to the ore is a dolomitic and pyritic shale/siltstone which dips steeply we

    Jan 1, 1988

  • AUSIMM
    Maximising the Output of a Surface Bulk Air Cooling Installation on a South African Mine

    By T Baard, A Pieters

    This paper deals with the design and implementation of a 17 MW (nominal) surface cooling installation at Impala Platinum No 14 shaft located in Rustenburg, North West Province, South Africa.The coolin

    Jan 1, 2005

  • AUSIMM
    Studies on Chlorination of Rutile and Struverite

    By Azizan A

    The paper presents the results of chlorination of beneficiated rutile and struverite (a tantalum-niobium bearing, rutile type mineral in alluvial tin deposits) by carbon tetrachloride in the range 6

    Jan 1, 1996

  • AUSIMM
    Lessons from Manufacturing-Integrating Mining and Milling for a Complex Orebody

    By Tucker G, Clark A, Young M. F, Johnston M

    Mount Isa Mines has made a huge commitment to process control in milling. Yet in lead zinc we still failed to achieve a steady operation. Comparisons with manufacturing plants showed the key differe

    Jan 1, 1998

  • AUSIMM
    Planning for Access to the Deep Copper Orebodies at Mount Isa Mines Limited

    By Slater R

    The initial planning and detail design phase leading to the development of a 7.5 m internal shaft to service the deep 3000 and 3500 copper orebodies at Mount Isa, Queensland is well advanced. The

    Jan 1, 1982

  • AUSIMM
    The Design of Pre-split Blasts

    Effective pre-splitting is a key feature of wall control blasting. Most mining operations use historical designs or rules-of-thumb for designing pre-split blasts. If productivity and safety benefits

    Jan 1, 1995

  • AUSIMM
    Control of Product Variability in a Large Open Pit Iron Mine

    By Shrivastava P, Humphreys M, Guibal D, Deraisme J

    Customer requirements concerning the final products of iron mines are extremely stringent. Because of this, there is an ever-increasing need for mine operators to monitor and strictly control the qu

    Jan 1, 1994

  • AUSIMM
    Open the Matrices Wear and Self-Sharpening of Impregnated Diamond Drill Bits

    By Hll J. K, Zhang Y. G

    The wear mechanisms of impregnated diamond drill bit matrices are complex and believed to be the key point in solving drill bit self-sharpening problems. A method has been developed to find the chan

    Jan 1, 1989

  • AUSIMM
    Interfacial Chemistry in Flotation of Diasporic Bauxite

    China has abundant bauxite resources, but these resources are mostly of a diaspore, which has a feature of low Al2O3 to SiO2 mass ratio, typically ranging from four to six. Compared to other materials

    Sep 13, 2010

  • AUSIMM
    Ore Reserves Estimation For Copper Orebodies At Mount Isa Mines Limited

    Ore Reserves estimation for the two producing copper orebodies at Isa Mine, Mount Isa, Queensland is discussed. The principal estimation techniques used and discussed are first, a computer based in

    Jan 1, 1979

  • AUSIMM
    The possible manufacture of carbon anodes from Victorian brown coal

    By Wright S, Rogers L. J, Precious T. H

    Brown coal and its char were investigated as substitutes for petroleum coke in the manufacture of anodes for Hall-Heroult cells. The char, which had been densified by several techniques, was made into

    Jan 1, 1986