Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Gold Mill Expansion at Kambalda

    The design, construction and operation of a 500,000 tonne per year Carbon-In-Pulp (C.I.P.) plant at Kambalda embracing the period from 1980 to 1982 has been previously discussed (Sceresini, 1982).Sinc

    Jan 1, 1984

  • AUSIMM
    Recent Developments in Blast Furnace Practice

    Developments in furnace construction and design have been very rapid in recent years. Larger furnaces operating at high top pressures with much improved burdens are giving extremely high productio

    Jan 1, 1972

  • AUSIMM
    Feasibility Study for a Silicon Industry in Southland, New Zealand

    Reserves of high-grade quartz gravel, lignite, and timber suitable for the production of silicon metal and ferrosilicon on large scale occur within 40 miles of Bluff Harbour. Undeveloped hydroelectric

    Jan 1, 1971

  • AUSIMM
    Carbon-in-Pulp Testwork and Flowsheet Development

    By Sehic OA

    One aim of testwork and flowsheet development is to ultimately provide a reliable and flexible plant that is simple to operate and maintain. Testwork can indicate amenability of ores to CIP treatmen

    Jan 1, 1982

  • AUSIMM
    Influence of Backfill Stability on Stope Production in the Copper Mine at Mount Isa Mines

    By Morland R

    Recent influence of backfill stability on stope production in the Copper Mine at Mount Isa Mines Limited is described. Changes to the mining process to improve fill stability are described, includin

    Jan 1, 1995

  • AUSIMM
    Experience with Operating and Controlling and In-Pit Portable Crushing and Conveying System

    Portable crushing at Duval Corporation's Sierrita open pit mine has proven both the economics and operability of large, hardrock, portable systems. In-house expertise was utilized to create a sys

    Jan 1, 1985

  • AUSIMM
    Prediction of Ground Vibration Use due to Blasting

    In engineering applications of explosives for rock breaking, the released energy is expended mainly into heat, rock crushing and fracturing, seismic waves, air blast, and noise. Those parts of ene

    Jan 1, 1986

  • AUSIMM
    Discovery of the Hamersley Iron Deposits (Duck Creek - Mt.Pyrton - Mt. Turner Area)

    By Burks WG, Hughes FE, Muceniekas E, Whitcher IG

    The area containing the iron field, recognised by the writers, is part of an uplifted, portion of the 'Western Australian Plateau,' ranging in elevation from about 1,000 feet to about 30

    Jan 1, 1964

  • AUSIMM
    Thermal Processing of Petroleum Fly Ash for Vanadium Recovery

    Thermal Processing of Petroleum Fly Ash for Vanadium Recovery

    Sep 13, 2010

  • AUSIMM
    A Case Study on the Technical and Safety Aspects of the Robe River Experience

    Robe River Mining manages a large open pit iron ore mine in the Pilbara region of the North-West of Australia. The mine is managed for various joint venture participants.In July 1986, Robe River Minin

    Jan 1, 1992

  • AUSIMM
    Evaluation of a Dragline-Hopper-Truck Mining System

    By Dickerson A. W

    The most important mining problem facing many of the established surface coal mines in the Bowen Basin area of Queensland is the rising cost of overburden stripping associated with increasing depths t

    Jan 1, 1992

  • AUSIMM
    The Drilling and Evaluation of an Exploratory Oil Well

    By Hammett PHJ

    Oil Exploration Companies are primarily interested in how much oil or gas is present in the rocks in an area in which an exploratory well is drilled. The solution of this problem requires a combined

    Jan 1, 1964

  • AUSIMM
    Development and Application of the Computer Model of the Slag Fuming Processf at Port Pirie

    By Barnett LJ

    The Kellogg slag fuming model is extended to apply to the Port Pirie plant which uses recuperative heating of secondary air. Exten- sive investigations of plant operations pro- vide parameters for u

    Jan 1, 1975

  • AUSIMM
    Development Rates Using Conventional Continuous Miner Technology in Deep Underground Mines in Australia

    By Misra A

    The development of roadways in underground mines in Autralia is by conventional continuous miner technology. The rate of development achieved using this technology is improved by modifications to this

    Jan 1, 1991

  • AUSIMM
    Characterising the Mining Environment for Underground Mass Mining

    The purposes of defining the mining environment for underground mass mining and the uses of characterisation data are outlined. The requirements for data in the areas of geology, surface and groundwat

    Jan 1, 2000

  • AUSIMM
    Simple Prediction of the Processing Characteristics of Ores Using QEM*SEM

    By Johnson CR, Wilkie G

    The aim of the study was to use quantitative mineralogical measurements to predict the processing characteristics of an ore. Samples were taken from a wide range of concentrators processing ores of

    Jan 1, 1989

  • AUSIMM
    The Environmental Factor in the International Mining Development Equation

    By Opitz E. A

    The integration of environmental and permitting strategies into development has become a routine part of doing business for the international minerals industry. Paralleling the development schedule

    Jan 1, 1997

  • AUSIMM
    An Approach to the Flotation of Western Australian Nickel Ores

    By Tilyard P. A

    Recent exploration has established depos its of nickel sulphide in several areas of Western Australia. To assist in their develop- ment Amdel has investigated the beneficiation of many samples from

    Jan 1, 1973

  • AUSIMM
    Mine Ventilation at Renison Limited

    By Ross T. J

    Renison Limited operates an underground tin mine employing both cut and fill and open stope methods, at Renison Bell on the west coast of Tasmania. Mining in the region commenced in the 1890'

    Jan 1, 1988

  • AUSIMM
    Construction and Utilisation of the Olympic Dam Service Decline

    The mining production rate of two million tonnes per annum at Olympic Dam required greater servicing capacity than was available with the existing Whenan Shaft. To increase servicing capability a

    Jan 1, 1988