Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Blast Design Using Measurement While Drilling ParametersBy M Higgins
Measurement while drilling (MWD) techniques can provide a useful tool to aid drill and blast engineers in open cut mining. By avoiding time consuming tasks such as scan-lines and rock sample collectio
Jan 1, 2001
-
New Technology for Management and Security of Exploration and Mining InformationA hidden asset in most exploration and mining activities is data. Common practice involves the spending of large amounts of money to discover, define and prove the viability of a mining project. Some
Jan 1, 1999
-
-
A methodology for assessing stope design modifying factors for the Olympic Dam MineBy S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant
The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order
Mar 15, 2021
-
Dynamic grade control modelling processes at the Waihi Underground Gold MineBy A Whaanga, W Vigor-Brown
IGO Ltd’s (IGO’s) Nova-Bollinger Deposit (Nova-Bollinger) is a magmatic nickel-copper-cobalt (NiCu-Co) sulfide deposit found 160 km east-north-east of the town of Norseman in Western Australia (WA). T
Mar 22, 2022
-
Structural Analysis of Acoustic Televiewer Logs for Large Diameter Raise Bored ShaftsBy R M. Stephenson
Large diameter raise boring is a common raise excavation method in the Australian mining industry. Geotechnical investigations were conducted on several large diameter raise bore projects at Gwalia Mi
Mar 24, 2014
-
Advances in In Situ Testing of Ventilation Control Devices for Underground MinesBy M Salu, G J. Kay
"As underground mines increasingly face the challenge of maximising production without losingfocus on safety excellence, the ability to predict the eff ectiveness of mine seals and stoppings andthe id
Jun 1, 2012
-
What category cyclone is devastating your plant?By T G. Vizcarra, B Wong
Optimisation projects are regularly undertaken without knowing the root cause of an issue. It is all well and good to trial a multitude of flotation reagents, change the operating characteristics of y
Aug 29, 2018
-
Ore variability and process plant performance – the impacts to revenueBy A Millar, B Wraith
Process plants are characterised by variability of performance over a wide range of time-scales; reflected in fluctuations in metal recovery, concentrate grade, plant throughput and reagent costs. In
Aug 24, 2022
-
Unlocking resource confidence in coal through use of conditional simulationBy B Haase, R Saha
Conditional simulation (CS) has been extensively used in metal industry to assess uncertainty of geo metallurgical variables to build robust distributions around grade tonnages across different time h
Mar 22, 2022
-
Stakeholder Engagement – Who Are You, What Do You Stand for and Why?By R M. Lonsdale, M D. Goodz
"With an ever-increasing dynamic business environment, successful stakeholder engagement is becoming more fundamental to achieving desired outcomes in today’s mineral resource industries. It is impera
Jun 22, 2016
-
Production at Lift 530 m of Tongkuangyu Copper MineBy K W. Bian, Y M. Liu
Tongkuangyu Copper Mine is currently the only mine in China employing block caving. It comprises two large orebodies known as the No 4 orebody and the No 5 orebody. They are approximately 50° in
May 9, 2016
-
Investigating the Effect of Different Block Dimensions on the Economic Life of Open Pit MinesBy P Moarefvand, M Osanloo
The anticipated economic life of the mine, which defines the rate of mine production, is dictated initially by the design capacity of the mill/concentrator and the production capacity of the mine rela
Sep 26, 2011
-
Be Open to Closure - It Can Save You MoneyBy J Heyes
Historically mining engineers haven't spent enough time planning waste dumps, but waste movement costs often outweigh ore haulage costs. There is a real incentive to plan waste dumps right the fi
Jan 1, 2009
-
Regional scale structural influence on the Ernest Henry orebody below current mining levelsBy E Philippa, B Miller
Material characterisation, ore sequencing and process capability are commonly regarded as the key parameters to consider in designing and operating an effective pit to plant supply chain. Therefore, a
Mar 22, 2022
-
Monitoring Haul Truck Operator Fatigue Using Gyroscope DataBy L van Latum, A Koh, I Thomas
Haul truck drivers are at a high risk of developing fatigue due to the monotonous nature of the work and demanding shift rosters. In the mining industry, fatigue is identified as a major contributing
Sep 26, 2011
-
Optimisation of the Sepon Copper Milling CircuitBy A Jakowetz
OxianaÆs Sepon Copper Operation (part of the combined Sepon Gold and Copper Operation) is located in Savannaket Province, in southern central Lao PDR. The site is relatively remote, being some five ho
Jan 1, 2006
-
Costerfield – a Narrow Vein Case StudyBy M McCarthy
Over the last six years Mandalay Resources has increased production rates and improved safety outcomes at its Costerfield mine in Victoria, Australia. This mine is an underground operation utilising n
Jun 22, 2016
-
Truck Haulage Improvements at the Phu Kham Mine – the Journey to 97 per cent Utilisation of AvailabilityBy S P. Young, K R. Monro
Reducing metal prices have forced mining operations to become more efficient and innovate in order to do more with the existing base. Much of this effort has focused on improving the efficiency of loa
Jun 22, 2016
-
Understanding Ore Characteristics and Equipment SelectionBy K T. Broekman, R L. Koenig
"The Braemar Iron Formation is atypical ore when compared to the current magnetite ores being processed. In attempting to process and economically recover the vast quantities of iron ore stored within
Aug 12, 2013