Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Selective Open Pit Gold Mining at Harbour Lights

    Gold mining commenced at Telfer in Western Australia in 1977. Ore mining was carried out by owner equipment and personnel with waste stripping by a contractor. Initial ore reserves were in predominant

    Jan 1, 1986

  • AUSIMM
    A Review of Standard Physical Ore Property Determinations

    By Dunne RC

    The physical properties of an orebody require determination for virtually all mining projects, new and existing. The extent and regularity of such determinations being subject to the size and homogene

    Jan 1, 1997

  • AUSIMM
    Opening Address to Gold Conference

    EARLY HISTORYIt is 91 years since the epic discovery of gold at the eastern end of Kalgoorlie's main street appropriately named Hannan's Street after the prospector who found the first gold

    Jan 1, 1984

  • AUSIMM
    Note on Geochemical Investigations in a Deep Lateritic Weathering Profile at Woodcutters L5 Lead-Zinc-Silver Prospect, N.T.

    Geochemical investigations carried out in the Woodcutters area, Rum Jungle district, NT., consisted of a programme of C-horizon soil geochemical sampling followed by rotary-percussion and diamond dril

    Jan 1, 1978

  • AUSIMM
    Technology-Key to Capital Growth and its Significance as an Export Commodity

    During the post war era, the requirements of the "Third" World for modern civil works, energy and industry, coupled with an insistence that these capital installations are understood and controlled

    Jan 1, 1975

  • AUSIMM
    The Recommissioning of the Treatment Plant at Mary Kathleen Uranium Ltd.

    The recommissioning of the plant at Mary Kathleen involved several distinct phases. The previous plant process was modified significantly, the plant capacity was increased by the addition of new eq

    Jan 1, 1978

  • AUSIMM
    Review of Static and Seismic Stability of a Cross-valley Sand Tailings Embankment in a High-rainfall, High-seismicity Setting

    By B P. Wrench, M J. Gowan, P J. Chapman

    Embankment dams constructed mainly of sand or non-plastic fine soils are susceptible to liquefaction, particularly in high-rainfall, high-seismicity environments where there is sufficient water to sat

    Jul 27, 2015

  • AUSIMM
    Computerised Deposit Modelling, Volumetrics, and Production Scheduling

    By Davey CJ

    An integrated computer software system has been developed by Fluor Australia for modelling, mine planning and production scheduling of single or multi-strata deposits. Modelling of both quantitative

    Jan 1, 1983

  • AUSIMM
    Computing Education of Graduating Mining Engineers

    By Upfold RW, Nguyen VU

    The extraction and utilisation of metals and materials is the basis of modern civilisation, and will remain so for many decades, Traditional metals are facing some challenges and research is needed

    Jan 1, 1986

  • AUSIMM
    Monitoring of Underground Mobile Equipment at Mount Isa Mines Ltd

    By Cook B, Cunningham J

    At Mount Isa Mines, a system has been developed for general monitoring of underground mobile equipment. It can provide unit condition monitoring data such as oil pressures and motor temperatures as

    Jan 1, 1995

  • AUSIMM
    Assessment of Rock Slope Stability Using the Rock Mass Rating (RMR) System

    The Rock Mass Rating (RMR) and Rock Mass Strength (RMS) classification systems for jointed rock masses are briefly reviewed, with particular reference to their use in slope stability studies. A correl

    Jan 1, 1992

  • AUSIMM
    Improving Fines Recovery by Grinding Finer

    By D Curry, M F. Young

    æConventional wisdomÆ believes that fine particles have low flotation recoveries. Plant size û recovery graphs often have the classic æhillÆ shape û high recovery in the mid sizes and low recovery at

    Jan 1, 2004

  • AUSIMM
    The Relationship Between Coal Particle Size and Hydrophobicity in the Formation of Particle-Stabilised Froths

    By Smitham J. B

    A selection of Australian washed coal samples was examined to determine the effect of sample hydrophobicity (rank) and particle size on froth stability in the flotation process. The results indicate d

    Jan 1, 1988

  • AUSIMM
    Reshaping Minerals Tertiary Education in Australia

    University education in Australia is changing, driven by greater market orientation, reduced funding available per student, especially in the higher-cost minerals industry disciplines, and the call fo

    Jan 1, 2000

  • AUSIMM
    Paper No. 125. Notes on The Desulphurisation of Slimes by Heap Roasting as Conducted by The Broken Hill Proprietary Company, Limited.

    Before proceeding to the main portion of the above subject, a few remarks as to the general question of our mill slimes seem called for, and, with this in view, it is intended to briefly refer to the

    Jan 1, 1903

  • AUSIMM
    Design of Mine Winding Systems

    By Deutsch G. P

    The output of an underground mine often depends entirely on the mine winding system. -Decisions made--at the design stage affect the economy and operation'of the mine'.througb -its entir

    Jan 1, 1973

  • AUSIMM
    The Practical Method of Handling Methane in a Fully Mechanized High Output Coal Face

    By Yuanping H

    There is a practical method of handling methane in a fully mechanized high output coal face when the methane outflow rate from the face is too high to be handled by ventilation alone, a combined m

    Jan 1, 1988

  • AUSIMM
    Late Cainozoic Uplift of the Ediacara Range, South Australia

    Drilling has disclosed a sequence of Cainozoic sediments immediately to the west of the Ediacara mineral field containing little or no dolomitic debris in the lower and middle sections, but with grave

    Jan 1, 1972

  • AUSIMM
    Confidence in Mine Planning ù The Role of Intelligent Technologies

    Mine planning is difficult. Even for small operations, it involves reasoning with complex variables and the practical difficulties of mining. It is also about predicting and planning the future in an

    Jan 1, 2003

  • AUSIMM
    Impact-Response-Monitoring-Evaluation Framework - Well-Being of the Australian Mining and Regional Communities

    In Australia a social impact assessment (SIA) is generally required prior to the approval of a mineral resource extraction or processing projects as a part of the Environmental Impact Assessment (EIA)

    Jun 1, 2010