Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Reducing the Energy Required in Grinding Clinker to Cement – Some Case Studies

    By H Benzer

    Grinding clinker to finished cement consumes more energy than any other comminution process. World production of cement in 2009 was 2840 million tonnes and the energy required for comminution was 40-6

    Aug 8, 2011

  • AUSIMM
    Guidelines for the Design of Rope Guides

    Rope guides, consisting of ropes spanning between anchor points at the top and bottom of shafts, have frequently been considered as a viable alternative to fixed guides, comprising buntons and guides.

    Jan 1, 2005

  • AUSIMM
    Multiple Indicator Kriging - Is it Suited to My Deposit?

    By D Guibal, J Vann, M Harley

    Many sample value distributions are highly skewed and present variograms with high relative nugget effects and/or short-range structures. In consequence, significant deskewing of the histogram and var

    Jan 1, 2000

  • AUSIMM
    The Ernest Henry Mine Project - "The Mining Cycle"

    By T Amiconi

    Ernest Henry Mining commenced operations on its copper-gold project in August 1997, some two months ahead of schedule and ten per cent ($35 million) under budget. The mine is located in the highly pro

    Jan 1, 1998

  • AUSIMM
    Progress towards Data-driven Mine Planning via a Virtual Geometallurgical Laboratory

    By E Vargas, A Egana, M Alarcon, X Emery, A Barberan, A Lopez, N Morales, C Friedrich

    "As the cost in time and money of data from sensors and small-scale tests has reduced, additional challenges have arisen. Although many mine data sets are not big relative to those in other discipline

    Jun 15, 2016

  • AUSIMM
    The Role of Stress Waves and Fracture Mechanics in Fragmentation

    This paper will review some of the work conducted in the past at the Dynamic Effects Laboratory to examine the use of stress waves and fracture mechanics in understanding dynamic fracture and fragment

    Aug 24, 2015

  • AUSIMM
    Blasting for Mine to Mill Optimisation

    By S S. Kanchibotla, S Morrell

    In recent years there has been a growing recognition of the impact that mining practices have on the efficiency of mineral processing operations. Head grade, dilution, particle size distribution and t

    Jan 1, 1999

  • AUSIMM
    Coal Seam Modelling and Mine Planning Using Results of a 3D Seismic Reflection Survey û An Example from Huntly Coalfield, New Zealand

    Geological hazards such as faulting, basement ridges, and zones of "thin" (

    Jan 1, 1998

  • AUSIMM
    The role of the regulator in promoting a highly reliable mining industry

    By S Johnston, L Howe, S Stevens

    Regulators have an important role to play in fostering and enabling reliable, effective, environmental management. Given this, it is perhaps surprising that there has been relatively little debate on

    Aug 2, 2023

  • AUSIMM
    Beneficiation Study of an Ultra-Fine-Grained Hematite Ore Slime

    By W Liu, S Gao, D Wei, B Cui, Z Guan, Y Shen

    Beneficiation of low-grade fine-grained hematite ores becomes increasingly important due to rapid depletion of high quality iron ore resources. However, fine particles, especially ultra-fine particles

    Aug 12, 2013

  • AUSIMM
    Non-magmatic versus Magmatic Fluids in the Genesis of Archean and Palaeoproterozoic Iron Oxide-copper-gold Systems of the Carajás Mineral Province (Brazil)

    By E S. B Santiago, C P. N Moreto, L V. S Monteiro, G H. C Melo, R P. Xavier

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Iron oxide-copper-gold (IOCG) systems of the Carajás mineral province (Amazon craton, Brazi

    Mar 18, 2015

  • AUSIMM
    Bulk Mineable Vein Type and Disseminated Gold Mineralization of the Fairbanes Mining District, Alaska

    By Caivin JS, Freeman CJ

    The Fairbanks Mining District in central Alaska was discovered in 1902 and since then approximately 7.5 million troy oz of placer gold, 250,000 troy oz of lode gold, and several thousand short ton

    Jan 1, 1987

  • AUSIMM
    Gold and Silver Leaching from an Oxidized Gold Ore with Thiourea under Controlled Conditions

    By Woodcock JT, La Broody SR

    As part of a project on the application of thiourea leaching to a variety of Australian ores, the systematic variation of pH, redox po- tential, and thiourea concentration were in- vestigated on an

    Jan 1, 1984

  • AUSIMM
    Crust and Uppermost Structure of the Arc Regions of the West Pacific Islands

    Single station group velocities of fundamental made Rayleigh waves over the period range 15-100 s are carguted for five provincial profiles of the West Pacific. Based on recordings of earthquakes arou

    Jan 1, 1990

  • AUSIMM
    Circum-Pacific Porphyry Copper, Gold and Molybdenum Deposits

    By P Hollings, J Holliday

    Porphyry copper, gold and molybdenum deposits form in subduction-related settings in association with calc-alkalic or alkalic magmatism. Hydrothermal alteration assemblages are zoned, with potassic co

    Jan 1, 2008

  • AUSIMM
    A New Look at Multiple-Point Geostatistics for Geological Modelling

    By B F. J Kelly

    Multiple-point simulation is a family of methods used to generate conditional facies simulations that present the same spatial dependence as a user-defined training image. The main advantage of using

    Sep 26, 2011

  • AUSIMM
    The use of 3D laser scanning for deformation monitoring in underground mines

    By D Beck, E Jones

    The measurement and management of deformation in underground excavations is a key responsibility of geotechnical and mining engineers. A critical aspect of these roles is to ensure there is sufficient

    Oct 16, 2017

  • AUSIMM
    Optimisation in Long Hole Stope Production Drilling

    By R LEATHAM

    Long hole drilling underground has come a long way since 'down the hole' surface drills were first taken underground. The underground miners have progressively developed the use of long ho

    Jan 1, 1992

  • AUSIMM
    Feasibility Study and Economic Evaluation for Deposit No 3 of Gol-e-Gohar Iron Ore Deposit

    By H Dehghan Jan Abadi, K Shahriar

    The iron ore district of Gol-e-Gohar (GEG) is located 60 km south-west of the city of Sirjan, in the Kerman Province of the Islamic Republic of Iran. Six exploration targets have been identified and i

    Jan 1, 2007

  • AUSIMM
    Rock Texture and BWi Relationships, El Teniente Ore Deposit, Chile

    By M Oyarzún

    Direct relationships between rock texture and BWi (grindability index) have been established based on geological and metallurgical information supported by optical microscopy observations, gathered fr

    Sep 5, 2011