Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Status Quo and Future Evaluations of Global Rare Earth Mining (with Respect to Special Rare Earth Element-industry Criteria)By H Mischo, G Barakos, J Gutzmer
The continuously growing demand for rare earth elements (REEs), in combination with the crisis of 2009 and the price spike of 2011, has initiated a treasure hunt for rare earth deposits all over the w
Nov 4, 2015
-
Analytical Fingerprint of Columbite-Tantalite (Coltan) Mineralisation in Pegmatites - Focus on AfricaBy A Gerdes, H BrStz, E GSbler, D Davis, F Henjes-Kunst, S Dewaele, T Graupner, T Oberthnr, M Sitnikova
Following the United Nations initiative to fingerprint the origin of conflict materials, the German Federal Ministry for Economic Cooperation and Development has decided to fund a pilot study on colta
Jan 1, 2008
-
Geometallurgical Guidelines for Miners, Geologists and Process Engineers - Discovery to DesignBy D David
Geometallurgy is often a misunderstood and poorly defined concept. The first thing the paper will attempt is to provide a definition of geometallurgy. Ultimately this paper has been written to provide
Sep 29, 2013
-
From Blasthole to Reverse Circulation Sampling – Changing Grade Control Methods at Black Star Open Cut Zinc-Lead Mine, Mount Isa, QueenslandBy B Young
Variable bench heights, interaction with underground workings and a steeply dipping orebody are challenges faced daily by geologists at Xstrata Zinc’s Black Star Open Cut (BSOC) Zinc/Lead/Silver mine
Aug 22, 2011
-
Influence of Shot Design Parameters on FragmetationBy Smith N. S, Rholl S. A, Otterness R. E
The Bureau of Mines is conducting research to develop blast designs for the control of fragmentation and rock displacement and the reduction of overall mining costs. This Bureau experiment, a progra
Jan 1, 1990
-
Controls on Disseminated Gold Mineralisation at Fosterville, Victoria, AustraliaThe Fosterville Goldfield has a modest past production (0.3 Moz), but is now emerging as a significant goldfield (2.6 Moz resources, including 1.1 Moz reserves) with implications for exploration withi
Jan 1, 2005
-
Shifting Waters in the Pilbara’s Iron Ore IndustryBy I Brandes de Roos
Water has played a key role in the Pilbara’s 60-year history of iron ore operations. In contrast to many of the current-day mining environments, iron ore mining was initially hosted by geological form
Jul 13, 2015
-
Faulting in Heavy Mineral Deposits – Friend or Foe?By C Buchanan
For a long time there has been a known relationship between the northern Heavy Mineral (HM) deposits of the Murray Basin to the extensive north east trending ridges in the area. These ridges have been
Aug 22, 2011
-
QAQC – proactive Quality Management (QM) supporting reconciliation resultsBy O Dominguez
Significant value can be added to ore supplied from the mine to the mill by measuring its quality in real time and performing grade control additional to that within the mine. Responsibility for ore q
Mar 22, 2022
-
Impact of Co-disposing Mixed Plant Rejects on Spoil Pile SettlementsBy D J. Williams, A K. Kho, A Shokouhi, N Tucker
The disposal of dewatered coalmine tailings and coarse reject within spoil piles is gaining popularity as a means of eliminating separate surface tailings storage facilities or dams. The contrasting c
Jul 27, 2015
-
The Restructuring of Ranger - A Case Study or Necessity is the Mother of InventionBy S S Solomons
In 1991 the uranium spot market price dropped to approximately US$7/Ib U308, a historical low in real terms and the short-term outlook for the industry in the next five years was grim. At this time
Jan 1, 1994
-
The Use of a Portable Aerosol Counting System to Characterize Dust Clouds and Evaluate Control Methods in Underground Metal MinesBy Bigu J, Grenier M. G, Knight G
Particulate control is a major concern in underground mining and the subject of continuing research world wide. In Canada the federal government's Mining Research Laboratory at EIIiot Lake, O
Jan 1, 1988
-
Passivation effect of immobilised ferric (hydroxy-)xanthate upon calcium/magnesium precipitates on the pyrite depression in alkaline conditionsBy T Suwa, S Ishida, J Xue, S Fuchida, H Shimada, Y Aoki, C Tokoro
Pyrite depression with prolonged pre-conditioning treatment in high salinity water has attracted much of researchers’ interest in recent years considering the increased utilisation of multiple stage f
Aug 24, 2022
-
Combining Multi-Camera-Data of Flotation Circuit with PCA and PLSBy H Hy÷tyniemi
In this paper multivariate data analysis performed on a new multi-camera system implemented to zinc flotation circuit of PyhSsalmi mine is presented. Image-analysis-based system was developed to take
Jan 1, 2005
-
Whole-of-System Analysis Using CFD to Reduce Emissions of Fugitives Gases Inside a Copper Smelter BuildingBy E Nik, A Manzoori, H Namavari, P Witt
The smelter building at Sarcheshmeh Copper Complex, Iran, houses two reverberatory furnaces and five Pierce-Smith converters. Under normal operating conditions SO2 emissions fill the building, posing
Jan 1, 2004
-
Alignment and Differences between the Australian Water Accounting Standard and the Water Accounting Framework for the Minerals IndustryBy A Woodley, A N. Danoucaras
In 2012 the Bureau of Meteorology, under the banner of the Water Accounting Standards Board, released the Australian Water Accounting Standard 1 (AWAS 1). This standard has been in development since 2
Nov 26, 2013
-
Laboratory Testing and Stability Analysis of Paste Backfill at the Golden Giant Mine (d53b2c09-d9ab-48b2-94c6-0c6f856d783f)By Bawden WF, Paynter JT
This investigation involves laboratory testing and stability analysis of paste fill at the Golden Giant Mine. Site-cast samples are tested in unconfined, confined, and consolidated-undrained triaxia
Jan 1, 1998
-
An Overview of Current Planning and Production Systems at McArthur River MineBy M Gwynne
McArthur River Mine is located approximately 50 km south-east of the NT township of Borroloola and approximately 120 km from the Gulf of Carpentaria. The mine hosts a series of layered shallow dipping
Jan 1, 1998
-
Application of an Integrated Liberation Leach Model for Process OptimisationBy T D. H McGrath, R Byleveld, W P. Staunton, J J. Eksteen
"The Gold Technology Group at Curtin University through the AMIRA P420 series of projects has recently developed the integrated liberation leach model (ILLM) for optimisation of gold plants. The model
Oct 10, 2016
-
A Holistic Viewpoint for Selecting the Vertical Haulage System – Shafts and ConveyorsBy R M. Krek
The haulage system used to convey ore from an underground mine to a surface stockpile at the mine process plant is a vital component of the mine’s overall infrastructure and economic viability. The sy
Mar 24, 2014