Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Field Evalution of Explosives Performance

    By Cameron A

    In recent years there have been significant developments in the tech- nology available for blast monitoring, analysis and simulation. Progress in these areas has been achieved through research conduc

    Jan 1, 1988

  • AUSIMM
    Steel Wire

    The man in the street (and no doubt most members of the Institute) thinks of wire, if he gives it any thought at all, as a most commonplace commodity. It is an accepted necessity, and like most necess

    Jan 1, 1947

  • AUSIMM
    Technical Note on an Improved Cyclosizing Technique

    The design and operating characteristics of the hydraulic cyclone elutriator were described in detail by Kelsall and McAdam (1963), and the method of operation of the commercially available version, t

    Jan 1, 1974

  • AUSIMM
    The Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe

    By R Chinamatira

    Several technical and economic factors have to be taken into consideration in developing an optimal mining method. This paper describes some of the important factors learnt during the evolution of the

    Jan 1, 2000

  • AUSIMM
    Practical Implicit Geological Modelling

    By H J. Ross, R K. Beatson, T J, W R. Fright

    Traditional method of explicitly defining three-dimensional (3D) ore-waste and geological boundaries relies heavily on a time-consuming process of manual digitisation. This method of modelling can be

    Jan 1, 2003

  • AUSIMM
    Justifying Slope Design Risks and Costs

    By N M. Player, R P. Varden, E Jones

    "An effective geotechnical design provides an accurate and appropriate assessment, balanced with a mining company’s risk profile. Justifying the cost of slope assessment requires an understanding of t

    Nov 15, 2016

  • AUSIMM
    Study on Paste Tailings Capping Ecology Reclamation on Acid Mine Waste Rock Dump

    By Z Lianbi, Z Yibin, Z Youhong, P Bin

    Without adequate soil available, it is difficult to rehabilitate a large area of acid mine waste dump with sustainable plant communities, which has a strong potential acid generation. In the present p

    Jul 10, 2012

  • AUSIMM
    Evolution of Cretaceous - Recent Drainage Networks and Distribution of Associated Gold Placers in Otago and Southland, New Zealand

    The development and distribution of gold placers in Otago û Southland is related primarily to the evolution and architecture of three distinctly different drainage networks that developed during and s

    Jan 1, 2006

  • AUSIMM
    Circum-Pacific Suspect Terranes and Lost Microcontinents: Chip off the Old Blocks

    A number of terrane reconstructions conflict with global plate histories or with data from adjacent regional studies. Paleogeographic maps have ignored terranes thus are over-simplified. This pape

    Jan 1, 1987

  • AUSIMM
    Applications of Exhaust Steam Turbines to The Power Plants of Mines.

    The cost of power is an important matter to mining companies generally and this thought that the members of the Australasian Institute of Mining Engineers, as well as the engineering and mining profes

    Jan 1, 1911

  • AUSIMM
    A Predictive Model for Beneficial Use of Rehabilitated Mine Tailings for Grazing Cattle after Mine Closure

    By B N. Noller, J C. Ng, S L. Bruce

    Mining activities can result in the transfer of harmful elements, including arsenic and lead, into the environment. In Australia, one of the potential future uses of rehabilitated mine land is to stoc

    Jul 16, 2014

  • AUSIMM
    Mineral Resource Policy Issues for Sustainable Development: Corporate and National Imperatives (e3355e4c-7484-44c3-ab2f-95b2e231f322)

    Constraints on the mineral industry are best treated as issues that have to be understood and managed in partnership rather than in conflict with communities. The Zapopan development at Mt Todd in

    Jan 1, 1995

  • AUSIMM
    Health and Safety ù A Key to Tomorrow

    Two characteristics of the modern mining industry are that there is a skill shortage and that young professional people rise rapidly into highly responsible supervisory positions. With this responsibi

    Jan 1, 2005

  • AUSIMM
    Determination of the Optimal Direction of Mining Works Expansion in Open-Cut by the Volume Simulation Method

    By Bukeikhanov D. G, Syedin V. F, Sagyngaliyev K. S

    The present paper describes a method of simulating deposits of com- posite structure by means of computers. The method employs mathematical tech- niques to study the openworks zone formation dynamic

    Jan 1, 1977

  • AUSIMM
    Open Pit Production Scheduling Optimisation - Why the Mining Industry Needs a New Phase Design Approach

    The long-term production schedule of open pit mines that maximises the net present value (NPV) of a given project relies on the proper design of phases (pushbacks) within the ultimate pit limits. Ther

    Dec 6, 2010

  • AUSIMM
    Geological Controls on Drilling and Blasting Operations

    By T N. Little

    This review paper presents an integrated and practical insight to blasting geology and its importance. This approach involves developing blasting objective up front and implementing geology specific b

    Nov 8, 2011

  • AUSIMM
    A geostatistical Approach to Coal Reserve Classification

    By Just GD, Gillies ADS

    There is an increasing need for reliable and comparable coal resource data and it is necessary to standardize the traditional classification procedures by quantifying the three basic evaluation crit

    Jan 1, 1987

  • AUSIMM
    Implications of the Carbon Price and Developing a Carbon Strategy

    By P Holt, M Allen

    On the first of July, 2012, the Australian GovernmentÆs Clean Energy Act commenced. From this point, a price of $23/t of CO2-e will apply to facilities that trip the liability threshold. This first pa

    Nov 20, 2012

  • AUSIMM
    Rock Strength Anisotropy and Its Importance in Underground Geotechnical Design

    By M Sandy, A Vakili, J Albrecht

    Although rock strength anisotropy is a well-known phenomenon in rock mechanics, its impact on geotechnical design is often ignored. No widely accepted guideline currently exists for its characterisati

    Nov 5, 2014

  • AUSIMM
    Coal Drift Construction by Tunnel Boring Machine

    By D Sibthorpe

    The employment of a tunnel boring machine (TBM) is the default delivery method for the realisation of traffic, utility and primary resource underground space worldwide, with hundreds of kilometres com

    Sep 17, 2014