Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Cover System Performance Monitoring for Tailings – Are We Doing It Correctly?By R Barritt, P Scott
Across the globe, it is a common scenario that tailings storage facilities (TSFs) are being decommissioned; however, their subsequent impact on the local environment and landscape can often be overloo
Jul 27, 2015
-
Particle Density MeterBy R Nicholson, N D. Cox, N W. A Lambert
"This paper reports on the long-term operation of a particle density meter (PDM) at the Bloomfield coal handling and preparation plant (CHPP). This unit has been operating continuously for over three
Oct 10, 2016
-
Now to the Future – A Path Toward the Future MineBy I Gipps
Each of us has a vision of what the future mine will be and, generally, these visions have many similarities and some differences. One of the major discrepancies in visions of the future mine is not t
Nov 22, 2011
-
Washability modelling and estimation techniques used to improve coal handling preparation plant beneficiationBy P J. Handley
"Predicting how coal seams will be beneficiated through the coal handling processing plant (CHPP) has long been challenging within BHP Coal. Various coal seams from different areas are mined and stock
Sep 20, 2017
-
Ventilation Upgrade at the FrogÆs Leg Mine - Case StudyBy A Llewellyn, M Varvari
The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.
Jul 1, 2013
-
Flotation launder design and the measurement of critical froth transport parametersBy B Wong, R G. Coleman
In flotation, the selection of the size, number and type of cell for a particular duty depends on two important factors. Firstly, the required flotation residence time and secondly, the physical const
Aug 29, 2018
-
Advanced Mill Relining - A Key Operational Control (Not Simply a 'Must Do' Maintenance Function)RME has a vision for a new grinding plant operational paradigm made possible by RMEÆs fast, safe Mill Relining System. Some new liner designs can degrade SAG mill performance because of mill volume lo
Jan 1, 2007
-
Dredging fine tailingsBy S H. Burgmans, B Anderson
This paper aims to define the specific challenges relating to dredging fine tailings from an above ground storage facility for transferral to a mined-out pit. In addition, it compares dredging and min
Jul 1, 2021
-
Data cross validation for a newly commissioned dynamic drop test facilityBy D W. Evans
Research into the dynamic properties of ground support elements continues to grow at a global level, given the increasing importance of this field of application within underground hard rock mining. M
Nov 29, 2022
-
Building better bow-ties – common pitfalls in risk analysisBy B Beale
Bow-tie analysis is a commonly used tool to identify and display risks that have the potential for an undesired hazardous event. The output of the analysis are bow-tie diagrams, which are an effective
Apr 16, 2024
-
Characterisation of Gravity Amenable Gold Ores – Sample Representivity and Determination MethodsBy S C. Dominy
Gravity amenable gold ores are those that after comminution produce liberated particles, composites and/or carriers that can be recovered by gravity separation means. Recovery depends upon mineralisat
Sep 5, 2011
-
Numerical Modelling of Undermined River Valleys ù A Case StudyBy J W. Lee, E Baafi, N Aziz
Ground subsidence due to mining is a common dilemma confronting the underground coal mining industry. The effects of underground longwall mining on river valleys have come under scrutiny, especially w
Jan 1, 2005
-
Off to a Good Start with Lift #2: Drawbell Extraction ù NorthparkesBy M Lovitt, T Hewitt
The extraction of drawbells in Lift #2 at Northparkes Mines E26 orebody was achieved by single shot blasting, enabled through the use of electronic detonators. This paper discusses the designs conside
Jan 1, 2005
-
Geomembranes – from design to handover and some of the lessons learntBy A Marta
Geomembrane (GMB) liners are being used more frequently for the storage or capping of mine waste due to stricter regulatory requirements relating to environmental protection. The longevity of any li
Jul 23, 2018
-
Improving Consistency of Delivery at Mt Rawdon OperationBy M Boon, M Franklin
This paper outlines the journey of cultural maturation and management system development at the Mt Rawdon (MRO) gold mine from its acquisition by Evolution Mining Limited (Evolution) in late 2011 to 2
Jun 22, 2016
-
Depositional Behaviour of Coal Tailings, Co-Disposed Coal Washery Wastes, and Loose-Dumped Coarse Reject (AuslMM '98 - The Mining Cycle)By D J Williams
Coal washery wastes comprise tailings, finer than 0.5 to 0.1 inn depending on the sophistication of the washery, and coarse reject, typically finer than 50 mm. Subaerial disposal of coal tailings sl
Jan 1, 1998
-
Moving mORE for LessBy G Brudek, P Elestedt
Schalker Eisenhütte und Maschinenfabrik GmbH, Nordic Minesteel Technologies and Bombardier Transportation have developed an evaluation tool that considers the main cost drivers of the rail, truck
May 9, 2016
-
Design and operation of large drum scrubbersBy G S. Beros, K M. Edwards
Over the past 20 years drum scrubbers have become a widely adopted technology within iron ore beneficiation plants. Generally, the drum scrubbers in use are considered high-capacity machines capable o
Sep 18, 2023
-
Improved Ground Control Using Hydro Scaling and In-Cycle ShotcreteBy B Upton, J Mitchell
The use of hydro scaling and in-cycle shotcrete to replace conventional jumbo scaling, mesh and bolting as the primary method of ground control for run of mine development has been investigated throug
Jan 1, 2005
-
Gold Mining South Australia The First Fifty YearsBy Fradd WP
South Australia pioneered metal mining in Australia and was the main source of copper for several decades. Gold discoveries and mining also contributed significantly to the development of the Colo
Jan 1, 1987