Search Documents

Search Again

Search Again

Sort by

  • DFI
    Advantages of Pressed-In Sheet Piles for New Orleans’ Hurricane and Storm Damage Risk Reduction System Flood Control Project

    By Ian Vaz, Takefumi Takuma

    "The New Orleans area has been repeatedly flooded by major storms and hurricanes since its French colonial era. After severe flooding in May 1995, the U.S. Congress authorized a massive flood protecti

    Jan 1, 2017

  • NIOSH
    RI 5925 Iron-Gadolinium Phase Diagram ? Summary

    By M. I. Copeland

    The investigation of the iron-gadolinium phase diagram is part of a project undertaken by the Bureau of Mines and sponsored by the Atomic Energy Commission to investigate rare-earth alloys. Data from

    Jan 1, 1962

  • CIM
    Optimization of the paste backfill plant at Louvicourt Mine (930a856d-d697-4cc4-918f-5d8dfe68aeb0)

    By Jean Cayouette

    "In 1995, Louvicourt Mine started one of the first paste backfill operations in Canada. From 500,000 tonnes in 1995, the annual paste backfill tonnage produced reached 800,000 tonnes in 1999. The maxi

    Jan 1, 2002

  • ABM
    INFLUÊNCIA DOS PARÂMETROS DE RECOZIMENTO INTERCRÍTICO SOBRE AÇOS BIFÁSICOS MICROLIGADOS AO Nb-Mo EM FUNÇÃO DOS TEORES DE C e Mn

    By Fernando Generoso Neiva Ferreira

    O aumento crescente dos requisitos de segurança a serem atingidos pela indústria automotiva vem cada vez mais exigindo a utilização de aços com maior conteúdo tecnológico, que é o caso do aço bifásico

    Aug 16, 2017

  • AUSIMM
    Problems and Findings of Applied Petrology in Relation to the Upgrading of Brown Coal

    Regions with extensive reserves of brown coal but with inadequate deposits of hard coal provide a particularly suitable field for the application of brown coal petrology.In fact, this discipline is in

    Jan 1, 1968

  • AUSIMM
    Characterisation of Manganese Ores

    Characterisation of Manganese Ores

    Sep 13, 2010

  • AUSIMM
    The Gold-Antimony Veins of Costerfield, Victoria

    THE township of Costerfield is situated in the parish of Costerfield, county of Dalhousie, and lies 6 miles east of Heathcote and 30 miles south-east of Bendigo. It is separated from Heathcote by the

    Jan 1, 1922

  • AUSIMM
    Managing the Cumulative Groundwater Impacts of Multiple Iron Ore Projects at Cape Preston (or à One Plus One Plus One Plus One Does Not Equal Four)

    By J Hall, A Gallardo, M Strizek

    Mineralogy and coproponents Sino Iron, International Minerals and Austeel are in the process of developing four world class magnetite iron ore mines with multiple open pits along a 25 km strike length

    Jan 1, 2009

  • NIOSH
    OFR-16(1)-80 Three-Dimensional Finite Element Analysis Of Crosscut And Entry Intersection Of A Double - Entry Coal Mine

    By M. B. Balachandra

    A three-dimensional finite element analysis was performed of an instrumented section of a double-entry coal mine in order to provide a comparison between field measurements and existing analytic techn

    Jan 1, 1976

  • NIOSH
    OFR-75-79 A Statistical Evaluation Of The Effects Of Environmental And Operational Parameters On The Production Of Coal Mine Dust

    By G. D. Andria

    Contract J0275007 was to consist of a thorough two-phase statistical analysis of respirable coal mine dust data from USBM Contracts H0232061, H0232060, H0230029, H0230031, H0210050, and H0242013. Cons

    Jan 1, 1978

  • NIOSH
    RI 7800 Degasification Of Virgin Pittsburgh Coalbed Through A Large Borehole (6080190f-0d98-45f0-83dd-b714a20ad923)

    By H. H. Fields

    The Bureau of Mines is in the process of degasifying a virgin area in northern West Virginia from the base of an 839-foot-deep vertical borehole¬. An in situ gas pressure hole 199 feet long, and seven

    Jan 1, 1973

  • NIOSH
    OFR-67-73 Permissible Automatic Data Acquisition System - Section I - Introduction

    By G. P. Houston

    This is the final, report submitted for the Contract No. H0220002 with the U. S. Bureau of Mines for the design and development of a Permissible Automatic Data Acquisition System (PADAS) to measure an

    Jan 1, 1973

  • NIOSH
    OFR-45-79 Development Of Water Capsules

    By Clarke E. Schuetze

    This project had as its objective the experimental investigation of water capsule production utilizing the Southwest Research Institute's submerged nozzle encapsulation apparatus (U.S. Patent 3,3

    Jan 1, 1978

  • NIOSH
    OFR-166(2)-82 Selective Placement Of Strip Mine Overburden In The United States - II Appendices

    The selective placement of coal stripmine overburden is examined. Physical and chemical properties of spoil detrimental to revegetation and groundwater are detailed. The United States is divided into

    Jan 1, 1981

  • NIOSH
    OFR-9(1)-84 Development Of Models For Simulating Stormwater Runoff From Surface Coal Mined Lands - Unit Hydrograph Models

    By Michael E. Meadows

    The results of tests to determine the .regional applicability of four synthetic unit hydrograph models are presented. The SCS curvilinear (Haan), SCS single triangle, Williams and TVA double triangle

    Jan 1, 1983

  • NIOSH
    IC 8936 Electron Microscopy Studies Of Explosion And Fire Residues

    By Daniel L. Ng

    This Bureau of Mines report describes the results of scanning electron microscopic (SEM) studies of the combustion residues of carbonaceous dust particles resulting from explosions and thermal ignitio

    Jan 1, 1983

  • NIOSH
    OFR-102-83 Computer Simulation Of Mining Subsidence Using The Zone Area Method - I. Introduction

    By M. Karmis

    Surface subsidence is an inevitable consequence of many underground mining operations and has been recognized as such since the fifteenth century. Damage resulting from this phenomenon ranges from sim

    Jan 1, 1983

  • NIOSH
    OFR-22-74 Development Of Techniques And The Measurement Of Relative Permeability And Capillary Pressure Relationship In Coal

    By J. J. Taber

    Gas and water permeabilities of a large number of samples from the Pittsburgh and Pocahontas coals were measured at various overburden and mean flow pressures. A wide variation in the air and water pe

    Jan 1, 1974

  • SME
    The Expectations For Coal: Is Our Government And The Coal Industry Prepared?

    By M. S. Miller

    With prevailing assumptions that plentiful domestic coal reserves will be available for meeting our Nation’s expectations for on future low emission, coal-fired power plants, major government funding

    Jan 1, 2004

  • NIOSH
    RI 7790 Methane Control By Isolation Of A Major Coal Panel-Pittsburgh Coalbed (64d8fde6-2783-4e55-b6e4-9e5a47a1fed9)

    By Charles Findlay

    As one of its projects for degasification of major panels of coal prior to mining within them, the Bureau of Mines conducted methane emission studies during development of a set of three headings 1,80

    Jan 1, 1973