Search Documents

Search Again

Search Again

Sort by

  • SME
    Hoisting Systems (a4900c29-13ab-4c51-a9d4-095a976b1923)

    By Christopher J. Bise

    INTRODUCTION The transportation of men, supplies, and mined material from an underground operation is the connecting link between the mine plant and the surface plant. Unless the mine is accessed by

    Jan 1, 1986

  • SME-ICGCM
    Subsidence Control Over Abandoned Mines

    By Victor V. Nazimko

    Long term stability of the pillars that have been remained after R&P extraction causes postponed subsidence. To prevent unforeseen subsidence and to diminish postponed subsidence 25-50% new method for

    Jan 1, 1996

  • ISEE
    Analysis of Rock Fragmentation by Blasting Using Combined CFD/FEZ/DEM Models

    By Alejandro Ferrada Vergara, Héctor Espinoza Muñoz

    Drilling and blasting stages are considered factors that impact downstream processes significantly and over all the mining business value chain. Adequate control of these processes may represent energ

    Jan 1, 2016

  • SME-ICGCM
    Comparison Of Empirical, Analytical, And Numerical Methods Of Pillar Design And The Development Of A Site Specific Pillar Formula

    By Vincent A. Scovazzo

    Many accepted and useful methods have been developed and used for pillar design. Each method has its own particular strengths and weaknesses. Three methods addressed in this paper are; empirical, anal

    Jan 1, 1995

  • DFI
    Practical Experience With Nondestructive Testing Of Augered Cast-In-Place Piles

    By Bernard H. Hertlein

    All methods of deep foundation construction present challenges to the contractor and engineer that vary according to the method employed, and the geotechnical conditions in which it is being used. Aug

    Jan 1, 1997

  • CIM
    Erection and Commissioning Issues for Large Grinding Mill Circuits

    By Randolph R. Dreher, Michael L. Schreder

    "In recent years, FFE Minerals has designed, installed and commissioned several large grinding mill circuits. This paper discusses the issues related to the erection and commissioning of large grindin

    Jan 1, 2001

  • AUSIMM
    The Southern Coalfied, N.S.W., and its Potential Development

    By Brown H. R, Wright E. A

    The authors identify the workable coal seams, their distribution in relation to quality and economic occurrence and relate their analytical characteristics to industrial use. The development of establ

    Jan 1, 1958

  • DFI
    Driven Pile Foundation Design And Construction Genentech Hall - UCSF Mission Bay Campus

    By Robert E. Fosse

    Driven 14-inch-square concrete piles were used as the foundations of Genentech Hall at the new University of California, San Francisco Mission Bay Campus. The five-story, steel eccentrically-braced fr

    Jan 1, 2002

  • SAIMM
    Witwatersrand Gold Reef Evaluation: The ?Variancegram? Tool

    By C. Lemmer

    The resolution with which the different categories of resources are forecast for Witwatersrand gold reefs should ideally tie in with block sizes that are optimal in terms of the variability structures

    Jan 1, 2014

  • SME
    Tunnelling on the South East Transit Project

    By T. W. Peglas, J. Doherty, R. A. Day

    The South East Transit Project is a $520 million project in Brisbane, Australia which includes the construction of a 32 km Busway to access the south-eastern suburbs. Close to the centre of Brisbane,

    Jan 1, 2001

  • TMS
    Manufacture of High Nitrogen Austenitic Stainless Steels by Pressurized Electroslag Remelting

    By Zhouhua Jinag

    The attempt has been made to manufacture high nitrogen austenitic stainless steels by pressurized electro-slag remelting furnace with maximum nitrogen pressure of 7MPa. To obtain high nitrogen content

    Jan 1, 2009

  • SME-ICGCM
    Dynamic rock anchors

    By James J. Scott

    Dynamic rock anchors are interior fixtures developed by the author which promise to be a revolutionary development in the field of ground control. The fixtures are designed to be placed in the ground

    Jan 1, 1989

  • IOM3
    Development of platinum-group minerals in laterites - initial comparison of organic and inorganic controls

    By A. P. Gize, J. F. W. Bowles, D. J. Vaughan, S. J. Norris

    Paper presented at the IAGOD international symposium on mineralization related to mafic and ultramafic rocks held in Orleans, France, 1-3 September 1993. Geological evidence from tropical laterites in

    Apr 1, 1994

  • AUSIMM
    Discovery of Uranium Mineralization in the Manyingee Channel, Onslow Region of Western Australia

    By Morabito J, Harrop D. W

    Uranium exploration was commenced in 1973 and carried out at a regional scale over a wide area of the northern part of the Camarvon Basin of Western Australia by Minatome Australia Pty Limited and the

    Jan 1, 1981

  • AUSIMM
    Characteristics Analysis of a Bastnaesite Rare Earth Mineral for Recovery of Cerium

    Characteristics Analysis of a Bastnaesite Rare Earth Mineral for Recovery of Cerium

    Sep 13, 2010

  • ISEE
    Effect of Artificial Discontinuities Formed by Presplitting with Different Depths on Structural Damage Risk

    By Enver Alan

    This Research & Development (R&D) study was conducted in the field of applied blasting engineering in Ethiopia, within the AKH Railway Project, which was built in Girena, within the boundaries of the

  • AUSIMM
    The Production of Gold in Australia

    GOLD has played a part in the development of Australia. The total yield exceeds SIX hundred million pounds sterling, while the glamour of gold-mining and the unfailing demand for the product have enha

    Jan 1, 1924

  • IOM3
    Comparison of stereological correction procedures for liberation measurements: discussion

    By C. L. Schneider, C. O. Gomes, R. P. King, J. A. Finch, D. Lin

    Discussion is presented by Prof. King and Dr. Schneider of the paper by Lin, Gomez and Finch published in Trans.IMM C, vol.104, 1995, p.C155-C161. They conclude that the correction procedures used for

    Jun 19, 1905

  • AUSIMM
    Cave Tracker Flow Monitoring System Installation at Argyle Diamond Mine

    By M Wilson, D Whiteman, P Kuiper, S Talu, G Watt, A van As

    Once the draw process has begun in a block cave, it is very difficult to identify which regions of the cave have successfully propagated, where the caved material is flowing from and where it is flowi

    May 9, 2016

  • SAIMM
    Neural network performance versus network architecture for a quick stop training application

    The relationship between neural network (NN) performance and the parameters that form the architecture of the neural network is complicated. This paper studies an issue that is still controversial—the

    Jan 1, 2003