Search Documents

Search Again

Search Again

Sort by

  • SME
    A Tunnel Boring Machine at the South Pole

    By Michael R. Walsh, John H. Wright, Eivind B. Jensen

    A tunnel boring machine (TBM) was designed and built at the Cold Regions Research and Engineering Laboratory in 1992 for use in Antarctica. The TBM system was tested at the South Pole where a 120-m lo

    Jan 1, 2001

  • NIOSH
    RI 3606 Manganese Investigations - Metallurgical Division - 1. Ore-Dressing Studies Of Manganese Ores - Concentration Of Manganese Ores From The Drum Mountain District, Utah ? Introduction

    By S. R. Zimmerley

    As a result of the drilling program of the Mining Division, Bureau of Mines, large amounts of manganese ores have been blocked out in the Drum Mountain District of Utah. The ores, as mined, would not

    Jan 1, 1942

  • TMS
    Influence of TCP Phase on Enduring Property of Single Crystal Nickle-Based Superalloys

    By Tian Sugui

    By means of the measurement of the enduring property and microstructure observation, an investigation has been made into the influences of the element Re and TCP phase on the enduring property of the

    Jan 1, 2010

  • AUSIMM
    Recent Secondary Extraction Experience at Cook Colliery in a Multi-Seam Environment

    Cook Colliery currently mines in the Argo Seam, beneath old workings in an overlying seam. The Argo seam is up to 4.8 m thick and a continuous haulage system behind an ABM25 is used to develop first w

    Nov 25, 2010

  • NIOSH
    OFR-24(6)-84 Mining And Rock Mechanics Research In Oil Shale And Nahcolite, Horse Draw Shaft, Colorado - Appendix Volume A-4 Surface Testing

    During the period 1979 thru 1982, Multi Mineral Corporation conducted a mining research program at the United States Department of the Interior's Bureau of Mines Oil Shale Mining Environmental Re

    Jan 1, 1983

  • NIOSH
    OFR-52(2)-84 Surface Coal Mine Spoil Stability Study Eastern Coal Province - Volume II

    By Paul G. Swanson

    This investigation was conducted to identify the principle causes of spoil instability problems in the Eastern Coal Province. The study was also conducted to develop a matrix to predict the strength a

    Jan 1, 1983

  • NIOSH
    OFR-42-83 In Situ Shear Strength Of Rock In Open Pit Benches (Development Of Equipment And Field Procedures)

    By M. K. McCarter

    Previous investigations suggest the possibility of determining shear strength of geologic materials by measuring the force necessary to rupture the web between two closely-spaced, parallel holes using

    Jan 1, 1982

  • NIOSH
    OFR-54-(2)77 Exploration Of Illumination Concepts For Underground Coal Mines - Appendix D -- Design Drawings

    By Lon A. Williams

    This appendix contains drawing lists and drawings of components and assemblies designed for the prototype portable and machine mounted lighting systems per Tasks II & IV of Contract No. H0220065.

    Jan 1, 1976

  • NIOSH
    IC 8557 Offshore Petroleum Studies - Composition Of The Offshore U.S. Petroleum Industry And Estimated Costs Of Producing Petroleum In The Gulf Of Mexico

    By L. K. Weaver

    The objective of this study is twofold, The first is to present the composition of the offshore petroleum industry in terms of lease bonuses and the value of hydrocarbons produced from Federal offshor

    Jan 1, 1972

  • NIOSH
    OFR-49-83 State-Of-The-Art Environmental Assessment Of Onshore Disposal Of Manganese Nodule Rejects

    By P. A. Kennedy

    An environmental assessment or impact statement for onshore waste disposal under the Notional Environmental Policy Act is expected to occur with the development of commercial deep seabed mining. An en

    Jan 1, 1982

  • SME
    Construction Of A TBM Launch Box In A Complex Urban Environment

    By Vincent Tirolo

    The proposed Second Avenue Subway is a new two-track subway line running from 125th Street and Park Avenue at the north, east along 125th Street to Second Avenue and south along Second Avenue to the F

    Jan 1, 2013

  • NIOSH
    OFR-172-83 Theoretical Study, Design And Analysis Of An Improved Shuttle Car Cable Reel

    By PW Meisel

    An hydraulic-powered reel system to minimize peak tension transients in shuttle car trailing cables has been theoretically designed and analyzed using a computer. A single spring-loaded take-up sheave

    Jan 1, 1983

  • NIOSH
    RI 7731 Materials Handling Research: Shear Properties Of Several Granular Materials

    By G. A. Wancheck

    Shear tests were performed on several prepared samples of granular and powdery bulk materials to investigate the following parameters: Particle size and distribution, particle movement, moisture conte

    Jan 1, 1973

  • NIOSH
    OFR-162(3)-83 Mining In Low Coal - Volume III: Clothing Design Study

    By D. K. Caddel

    Several problems exist with the present design of coveralls used by miners in low coal (seam height 48 inches or less). The back portion of the coveralls often tears when roof bolts or rough areas in

    Jan 1, 1982

  • NIOSH
    RI 7151 A Model For Molten Pools In Arc Melting

    By F. W. Wood

    The use of consumable.-electrode arc melting as a production technology is growing. One advantageous feature of this process is that it avoids ingot contamination by soluble crucible materials by empl

    Jan 1, 1968

  • NIOSH
    RI 8547 A Mixed Kinetics Dump Leaching Model for Ores Containing a Variety of Copper Sulfide Minerals

    By B. W. Madsen

    To help maintain an adequate supply of minerals to meet national economic and strategic needs, the Bureau of Mines developed a mathematical model that describes acidic ferric sulfate leaching of coppe

    Jan 1, 1981

  • NIOSH
    OFR-16-79 Evaluation Of Coal Deposits In The Narragansett Basin, Massachusetts And Rhode Island

    This report summarizes the results of the Narragansett Win Projec't's activities during the U.S. Bureau of Mines (BOM) Phase 1, which was transitional from and which followed the National Sc

    Jan 1, 1979

  • NIOSH
    IC 7734 Administration Of The Federal Coal-Mine Safety Act, Calendar Year 1954 - Introduction

    By James Westfield

    This report covers the calendar year 1954 and has been prepared and submitted to the Congress of the United States in accordance with the provisions of Sec. 106(a) and Sec. 2l2(c) of the Federal Coal-

    Jan 1, 1956

  • NIOSH
    OFR-7(2)-80 An Annotated Bibliography Of Coal Mine Fire Reports - 1.0 - Introduction

    This document is Volume II of a two-volume report on underground and surface coal mine fires occurring between 1950 and 1977. Volume I discusses the methods of data acquisition, data analysis procedur

    Jan 1, 1979

  • DFI
    Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing Results

    By Yogesh Prashar

    Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December

    Jan 1, 2002