Search Documents

Search Again

Search Again

Sort by

  • AUSIMM
    The Future of Mining on Pitjantjatjara Lands

    In 1976 the Pitjantjatjara Council was established under the Associations Incorporation Act 1985 (SA), for the initial purpose of organising and bringing together three similar Indigenous groups. Thes

    Jan 1, 2002

  • CIM
    Comparison of Uranium Solvent Extraction Strip Options

    By Deon van Tonder, Chuck Edwards

    "Solvent extraction is used in many acid leach uranium circuits to upgrade and purify the uranium bearing solution prior to final product precipitation. A number of strip options are available to reco

    Jan 1, 2013

  • SME-ICGCM
    Passive Seismic Imaging for Determination of the Longwall Rear Abutment Location

    By Erik Westman

    Few studies have been conducted regarding the location, movement, and relative magnitude of the rear abutment of a longwall coal mine. The rear abutment, or the abutment pressure arch in the gob area,

    Jan 1, 2012

  • ISEE
    Discovery, Analysis, and Elimination of Instantaneous Misfires in Underground Production Blasts

    By Norman Disley, David B. Counter, Lionel Hebert

    Misfires in underground and surface production blasts can be costly. Costs can arise from loss of resource, production interruptions, having to redrill or otherwise refire the blast (a hazardous proce

    Jan 1, 1996

  • AUSIMM
    Plant and Method of Manufacture of Portland Cement at Limestone Island

    WITH the exception of the deposits of the Milburn Cement Co near Dunedin, Wilson's Portland Cement Co., on the Mahurangi River (a short distance north of Auckland), and those of the New Zealand P

    Jan 1, 1912

  • AUSIMM
    Evidence of Reduced Water Infiltration by Microhardpans û Electrical Resistivity Measurements at Pe±a de Hierro, Rio Tinto, Spain

    By M Furche, U Noell, C Grissemann, J A. Meima, T Graupner, A Romero-Baena

    The mining residues at the abandoned copper mine site Pe±a de Hierro, located at the headwaters of the Rio Tinto, contribute substantially to the pollution of the river with high loads of Fe, As, Pb,

    Jan 1, 2008

  • CIM
    Hydro-geotechnical and geochemical characterization of column consolidated cemented paste backfill

    By T. Belem

    The main objective of this study is to better understand the effect of underground CPB placement conditions on its microstructural, hydro-mechanical and geochemical properties. To reach this objective

    May 1, 2007

  • SME
    Mining 1986

    By J. D. Morgan

    Introduction In 1986, the US economy passed the $4 trillion mark. However, the value of domestically processed materials of mineral origin fell slightly to $240 billion. The value of metals produced

    Jan 5, 1987

  • AUSIMM
    Land Reclamation Trials and Practices at Martha Hill Gold Mine, Waihi, New Zealand

    By P E. H Gregg, R B. Stewart

    Reclamation field trials commenced in 1985, two years before the granting of the Mining Licence. The level of pasture production on varying soil depths (0 cm, 5 cm, 15 cm and 25 cm) overlying both tai

    Jan 1, 1995

  • AUSIMM
    Bulk Explosives - Availability and Application for Small Users

    For tax purposes a mining company is a New Zealand company whose principal source of income is from the business of mining, or exploring for certain specified minerals in New Zealand. New Zealand tax

    Jan 1, 1988

  • AUSIMM
    The Application of Magnetic Assessment to Ironsands Production

    By A J. Falconer

    Two magnetic parameters are proposed as a basis for the assessment of ironsands beneficiation. The parameters are determined for raw sand prior to dredging and for magnetic separator head feed over a

    Jan 1, 1980

  • AUSIMM
    Soil Washing and Bioremediation of Slime Dam Material from a Gold And Uranium Mine

    The solvent extraction section of an old Uranium Plant in the Vaal River region (North West Province in South Africa) produced a substance called CRUD (Chalk River Unidentified Deposit) that formed wi

    Jun 1, 2010

  • SAIMM
    Friction Hydro Pillar Process As An Alternative Repair Technology For Creep Evaluation Sites On Thick-Walled 10CrMo910 Creep-Resistant Steel Structures ? Synopsis

    By D. L. H. Bulbring

    The removal of a cylindrical core from thick-wall sections for creep analysis by the relatively new Weldcore® process represents a very exciting methodology for obtaining more representative creep dam

    Jan 1, 2013

  • AIME
    New York Paper - Magnetite Deposits of Eastern Porto Rico (with Discussion)

    By Charles R. Fettke

    In connection with the gathering of data for a report on the geology of the Humacao district of southeastern Porto Rico during the summer of 1916, under the auspices of the Scientific Survey of Porto

    Jan 1, 1924

  • CIM
    Recovery of Platinum Group Minerals from Grinding Circuits: A Protocol for Prediction

    By N. Mejia, Z. Xiao, D. Fragomini, A. R. Laplante

    "The adaptation to platinum-group minerals (PGMs) of a protocol developed to predict gold recovery by gravity is presented. The protocol is based on three different data sets: ore characterization of

    Jan 1, 2004

  • CIM
    An agent-based framework for open pit mine planning

    By K. Awuah-Offei

    Long-term production scheduling optimization has been a challenging issue for the mining industry because of the size and complexity of the problem. The current planning algorithms have limitations in

    Jan 1, 2008

  • CIM
    Including In-Process Inventories in the Metal Accounting of Flotation Plants

    "Increasing demand for timely and accurate information about flotation plant performance requires metal accountants to increase the scope and reporting frequency of plant production. This trend has br

    Jan 1, 2014

  • CIM
    Safe Rapid Drifting - Support Selection

    By Fidelis T. Suorineni

    Rapid drifting enables quicker access to orebodies, higher production rates and a resultant reduction in production cost. The Mining Innovation, Rehabilitation and Applied Research Corporation (MIRARC

    May 1, 2004

  • CIM
    Metallurgical mapping of the San Nicolas deposit

    By A. H. Winckers

    "The San Nicolás deposit is a complex fine grained polymetallic volcanogenic massive sulphide deposit located in central Mexico.Metallurgical testwork was carried out in 1999 and 2000 to develop a flo

    Jan 1, 2002

  • AUSIMM
    Metallogeny and Evolution of the Asia-Australia W-Sn Metallogenic Belt on the Western Pacific Rim

    By X Qiu

    According to the temporal and spatial distribution of regional metallogenesis, thePacific Rim can be divided into four global metallogenetic systems. The Asia-Australia W-Sn metallogenetic belt is the

    Jan 1, 1995