Search Documents

Search Again

Search Again

Sort by

  • SAIMM
    The Re-Engineering Of The Ground Handling System At Cullinan Diamond Mine

    By A. W. Bester

    Paper written on project work carried out in partial fulfilment of B. Eng. (Mining Eng.) Cullinan Diamond Mine currently handles 3.2 million tons of run of ore per annum. This is done by means of a

    Jan 1, 2005

  • AUSIMM
    Sub-Level Open Store Design on Northern Rhodesian Copperbelt

    The paper is a general review of practice in design of sub-level open stopes in Northern Rhodesian copper mines and gives examples of some interesting developments during the last five or six years. I

    Jan 1, 1954

  • AUSIMM
    Implicit Geological Modelling of Iron Ore Deposits

    By A-A Latscha, C Boyle

    Geological modelling has historically been done using sectional interpretation of paper sections or on a computer screen. Boundaries of geological units or grade shells are interpreted by a geologist

    Aug 12, 2013

  • SME
    Pregrouting in Rock: Contemporary Basic Principles

    By Donald A. Bruce

    Pregrouting is an extremely important part of many rock tunneling projects. However, poor and unsatisfactory performances have been frequently recorded often with very severe consequences, technically

    Jan 1, 2005

  • AUSIMM
    Surveying the 1,480 Ft Level Drive, Broken Hill South Limited, Broken Hill

    The 8 ft by 91/2 ft drive which joined No. 7 Shaft with Browne Shaft on the 1,480 ft level was extended from both ends and met at a point approximately 12,000 ft from No. 7 (2,000 ft from Browne).The

    Jan 1, 1965

  • AUSIMM
    The Geology of Tinaroo Area, North Queensland

    The upper amphibolite-grade mctasediments of thc rinaroo area, North Queensland, form part of a regional aurcole to the large Tinaroo Batholith and are the stratigraphic equivalents of the Hodgkinson

    Jan 1, 1982

  • SME
    Cliffs And Associates Limited Circored® Iron Plant

    By E. C. Dowling, S. A. Elmquist, L. A. Kipfstuhl

    The Cliffs and Associates Limited (CAL) 500,000 tpy HBI plant located in Trinidad was commissioned after modifications in early 2001. This plant employs the novel Lurgi Circored® process to reduce iro

    Jan 1, 2002

  • IOM3
    Bioleaching of iron-stained sands

    By A. F. Neil, A. S. Bahaj, P. Watkins, P. M. Hyslop, C. E. Kirby, P. A. B. James

    The results of initial work indicate that for 3 of the 5 quarry sands bioleaching reduces the iron oxide content to a commercially acceptable 0.035 wt% Fe20 3, although the time taken to achieve this

    Jun 18, 1905

  • NIOSH
    Practical Techniques To Improve The Air Quality In Underground Stone Mines

    By R. H. Grau, S. B. Robertson, F. Garcia, A. C. Smith, T. P. Mucho

    Researchers working for the National Institute for Occupational Safety and Health (NIOSH) at the Pittsburgh Research Laboratory are developing ways to protect the health of miners. Part of that effort

  • ISEE
    Dutch Harbor, Alaska Unisea Quarry – Using Near Field Vibration Measurements to Improve Blasting Results Close to Structures

    By Mike Cammack, Logan Huppert, Gustavo Azpilcueta

    During the summer of 2015, Unisea Inc. sought proposals for the G1 Dock Replacement Project in Dutch Harbor, Alaska. It would be a one year project and construction was scheduled to begin in the sprin

    Jan 1, 2018

  • DFI
    Managing SOE Construction Risk through Design-Build Systems

    By Rob Jameson

    "The demand for commercial and residential construction has continued to evolve across the United States over the last decade. Our markets demand larger, deeper and inherently more complex structures,

    Jan 1, 2017

  • AUSIMM
    Dolomite at Mount Burnett, North-West Nelson, New Zealand

    The only economically significant deposit of dolomite in New Zealand is at Mount Burnett, in north-west Nelson. The dolomite, associated with marbles and schists, is complexly deformed, and is of Pale

    Jan 1, 1969

  • ISEE
    Hole Deviations in Mining Operations: Types, Sources and Effects

    By Sam Kangwa, Thomson Sinkala

    Th e re are three basic types of hole deviations in long hole d ri l l i n g , n a m e l y collar i n g , alignment and tr a j e c t o r y dev i a t i o n s . In mining, the accur a cy in drilling has

    Jan 1, 2004

  • NIOSH
    RI 5638 Producing Nickel-Bearing Iron From Cuban Ores In A Batch Rotary Kiln - Summary

    By Warren M. Mahan

    A rotary kiln process was developed by the Federal Bureau of Mines to produce consistently an iron product containing 3 to 7 percent nickel. Cuban laterite and serpentine ores were smelted in a gas-fi

    Jan 1, 1960

  • ISEE
    Evaluating Delay Effects on Ground Vibrations with Simulated Vibration Waveforms

    By Randall M. Wheeler

    It is important to be able to quantify the effects of blast delay designs on vibration characteristics. White was the first company to develop commercially available software, called Alpha-Blast, for

    Jan 1, 1994

  • SAIMM
    Uncertainty Assessment For The Evaluation Of Net Present Value: A Mining Industry Perspective ? Synopsis

    By Ö. Erdem

    The investment decision making process in the insurance and finance industries is affected by new advances such as simulation techniques. These advances have improved the discounted cash flow method (

    Jan 1, 2012

  • CIM
    Technical Challenges in Laser Additive Manufacturing of Metallic Parts

    By J. Y. Hascoet, M. Marya, S. Marya

    Additive manufacturing (AM) brings disruptive changes over the ways parts and products are designed, tested, qualified, assembled, inspected and marketed. With these changes come real technical challe

    Jan 1, 2014

  • AIME
    Geology, Geological Engineering - Fiberglass Plastic Casing Overcomes Corrosion Problem in Water Wells in West Pakistan

    By Don K. Smith

    The Reclamation Program for the Northern Zone of the Indus Plains in West Pakistan involves the construction of 30,000 irrigation wells to serve 20 million acres with an annual pumpage of nearly 40 mi

    Jan 1, 1970

  • SAIMM
    AziSA: improving mining decisions with real- time data ? Synopsis

    By D. Vogt

    South African underground hard rock mines are typically managed using measurements made daily, weekly or even monthly of key parameters such as face advance, readiness to blast, blast success, tempera

    Jan 1, 2009

  • DFI
    Soil Nail And Jet Grouted Excavation Support Wall At Peirce Mill Dam

    By Eric M. Klein

    As part of the Woodrow Wilson Replacement Bridge project several damaged wetland and environmental areas were to be mitigated. One of the mitigation projects consisted of constructing a Denil fish lad

    Jan 1, 2006