Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Computational Fluid Dynamics Modeling Of Spontaneous Heating In Longwall Gob AreasBy L. Yuan, A. C. Smith
To provide insights for the optimization of ventilation systems for U.S. underground coal mines facing both methane control and spontaneous combustion issues, a computational fluid dynamics (CFD) stud
-
Prediction of Detonation Parameters (95f7a43f-745c-4ae7-ad4e-74c781870372)By P D. Katsabanis
This chapter describes the principles for the derivation of the equations for a detonation wave. The importance of the equation of state for the detonation products is demonstrated and commonly used e
Jan 1, 1991
-
Skirt Suction Foundation - Application To Strait Crossings -By Takashi Saito
Since early 1970?s skirt suction foundations (skirted foundation / bucket foundation) have been used as support for large fixed substructures or anchors for floating structures in offshore hydrocarbon
Jan 1, 2013
-
Trazadores litogeoquímicos de fertilidad del magmatismo vinculado a pórfidos de Cu (-Mo, -Au) en el sur del Perú, del Jurásico al MiocenoBy Alonso Marchena, William Martínez, Joel Otero
En Arequipa, Moquegua y Tacna se han definido diversos arcos magmáticos. En los arcos jurásico, paleoceno y oligo-mioceno ocurren pórfidos de distintas características, los cuales presentan diferencia
May 22, 2019
-
Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)By Larry DeGraff
With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr
Jan 1, 2009
-
Mining Faculty in the United States: Current Status and SustainabilityBy M. K. McCarter
The history of mining education, like the history of the mining industry, is typified by “boom and bust” cycles. In academia, the perpetual problem can be stated as “too many graduates for the jobs o
Jan 1, 2007
-
Neutralization Of Smelter Gases With Limestone In A Countercurrent Multiple Fluidized Bed System.A three?stages countercurrent fluidized bed prototipe reactor to neutralize the SO2from smelter gases has been developed. For gases with 8 vol-%SO2, at 800°C and for 4 h mean reaction time of the lim
Jan 1, 2006
-
Analysis Of Sampling And Slurry Flow Using Multi-Physics Modeling - Preprint 09-058By D. McBride
Representative samples are required from process streams in order to accurately measure chemical and physical characteristics. This information can then be used by process operators and metallurgists
Jan 1, 2009
-
Explosively Loaded Vessel for Dynamic Experiments at Advanced Photon SourceBy Christian J. Sorensen, Christopher Armstrong, Andrew Matejunas
A team consisting of junior and senior mechanical engineering students at New Mexico Tech worked on the design of an explosively loaded vessel, with a maximum load of 15 grams (0.53 oz) TNT equivalent
Jan 1, 2015
-
Evaluation Of The SKC® DPM Cassette For Monitoring Diesel Particulate Matter In Coal MinesBy James D. Noll, Eileen Birch
In a previous study, the e?cacy of commercial and prototype impactors for sampling diesel particulate matter (DPM) in coal mines was investigated. Laboratory and ?eld samples were collected on quartz-
-
Improving Raisebore Stability Assessments and RiskBy B. M. Coombes
The McCracken and Stacey (1989) method of assessing geotechnical risk for largediameter raisebored shafts has been the basis for most Australian pre-construction raisebore investigations for the past
May 1, 2011
-
Brightman Street Bridge Replacement ProjectBy Arturo Ressi di Cervia
Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, conc
Jan 1, 2003
-
Information Strategy Planning on Nuclear Power Plant Project Management SystemBy Son Hye Jin
Abstract ? KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. ? We want to improve our construction project management process. ? So we are now developing the
Aug 1, 2013
-
Communicating Confidence in Mineral Resources and Mineral ReservesMining is an inherently risky business; from the technical, environmental, social, and economic uncertainties associated with advancing an exploration prospect to a viable project to the operating, ma
Jan 1, 2014
-
Latest Electrode Technology Delivering Improved Electrode Performance In Submerged Arc FurnacesBy Henk van der Bijl, Sean Rogers, Eugene Sidorski, Alan Carpenter
The electrode column is the heart of the submerged arc furnace. Superior electrode performance provides improved furnace performance. This paper describes the main features of the electrode column tha
Jan 1, 2007
-
Mining Engineering Education Initiatives in AustraliaBy Bruce Hebblewhite
Australia’s Minerals Tertiary Education Council (MTEC) has achieved several successes during its first three years of operation. This initiative was developed through the Minerals Council of Australi
Jan 1, 2006
-
Winding Machinery on the Bendigo GoldfieldsIn the Bendigo district, with its large number of comparitively small leases worked by separate companies, we might naturally expect to find many different arrangements of winding machinery and, as a
Jan 1, 1902
-
Design Analysis Of Underground Mine Ore Passes: Current Research ApproachesBy Stephen R. Iverson, Bill M. Stewart, Michael J. Beus
The U.S. Mine Safety and Health Administration (MSHA) has identified ore pass hazards as a significant safety problem in underground metal mines in the United States injury and fatality data show that
-
Lessons Learned from Measuring and Monitoring the Social License to OperateBy Ian Thomson
The Social License to Operate ? We are operating in an era where social license in the resource industry is as important ? if not more important ? than mineral potential ? Concept proposed by Plac
Aug 1, 2013
-
Blended waste rock, tailings and slag to produce cover systems for closureBy G. Ward Wilson
Waste rock and tailings may be combined through intimate blending to create new materials with superior physical and hydraulic properties. The new material, termed Co-Mix, has high shear strength char
Sep 12, 2005