Search Documents

Search Again

Search Again

Sort by

  • SME
    Mitigating Tunnel Launch and Reception Challenges

    By Steven W. Hunt

    Appropriate seals, portal ground improvement, and compatible shaft construction techniques are vital elements for launching and receiving tunnels effectively in urban areas where adjacent property req

    Jan 1, 2008

  • SME
    Survey And Experimental Studies On Engineering Control Of Machine Noises In Longwall Mining Faces

    By Yi Luo, Jeremy Slagley, Arunkumar Rai, Steve Guffey, Syd S. Peng

    Research was conducted to study the characteristics of longwall mining machine noises and to develop engineering controls for the reduction of noise exposure at longwall faces. Time-motion noise dosim

    Jan 1, 2005

  • ISEE
    Recent Projects - Hilton Hotel Beirut, Lebanon Shot Date: Sunday, July 14, 2002

    By Stacy Loizeaux

    The Beirut Hilton Hotel, which was built in 1975, but never occupied, was imploded on Sunday, July 14, 2002 by Controlled Demolition, Inc. (CDI) of Phoenix, Maryland and their client, Optimal Engineer

    Jan 1, 2003

  • AUSIMM
    Enabling iron ore concentrate for the production of direct reduced iron with pre-existing beneficiation lines

    By B Hiebl, J Martens, L Petzold

    A research team at the Iron and Steelmaking department at Primetals Technologies has established new upgrading measures for improving the efficiency of the beneficiation process in ironmaking plants,

    Jul 24, 2017

  • NIOSH
    Avoid the Shock - Contractors need to take steps to prevent the leading on-the-job killer ? electricity.

    By Gerald T. Homce

    Data from the U.S. Bureau of Labor Statistics show that 89 water well drillers died on the job between 1992 and 2002, and 28 of these deaths were electrocutions (Figure 1). In fact, elec­trical accide

    Jan 1, 2008

  • ISEE
    A Numerical Study of Bench Blast Row Delay Timing and Its Influence on Percent-Cast

    By Dale S. Preece

    The computer program. DMC Qistinct Motion &de), which w&s developed for simulating the rock motion associated with blasting, has been used to study the intluence of row delay timing On rock mOtiOn. Th

    Jan 1, 1994

  • AUSIMM
    Study on Ball Mill Grinding of a Cassiterite-Polymetallic Sulfide Ore

    Study on Ball Mill Grinding of a Cassiterite-Polymetallic Sulfide Ore

    Sep 13, 2010

  • SME
    Gravity Circuit Improvements at Montana Tunnels

    By Byron T. Darnton

    Gravity concentration at the Pegasus Gold/Montana Tunnels Mine, near Helena, MT, began in June 1991 when a coarse-gold-scalping circuit was commissioned. It processes a small portion of the ball-mill

    Jan 1, 1995

  • AUSIMM
    Non Statute Mineral Ownership Determination in New Zealand

    Mineral ownership determination is not always straight forward as in many cases the relevant details are not recorded on the latest Land Transfer title held in the local Land Registry Office. To deter

    Jan 1, 1998

  • NIOSH
    Communicating The Same Message With Different Media: An Example From Hearing Loss Prevention

    By Robert F. Randolph, Jeffery L. Kohler, David C. Byrne

    Multiple versions of an educational message can reach a diverse population more effectively than a single version. For instance, some workers are trained in formal classrooms while others are self-tau

    Jan 1, 2002

  • DFI
    Numerical Analysis of Pile-Supported T-Walls Subject to Large Settlements and Flood Loading

    By Alexander B. Reeb, Richard J. Varuso, George M. Filz, Jehu B. Johnson

    "T-walls, which are concrete floodwalls in an inverted “T” shape, are an integral component of the Greater New Orleans Hurricane and Storm Damage Risk Reduction System (HSDRRS). In order to resist lar

    Jan 1, 2017

  • AUSIMM
    Development of an iron ore microparticle binder for increasing the concentrate content of sinter blends

    By Y Yamaguchi, S Nomura, M Matsumura, C Kamijo

    In order to increase productivity and decrease reducing agent rate (RAR) of blast furnaces, slag content of sinter ore must be decreased. However, gangue content in iron ore tends to increase because

    Jul 24, 2017

  • ISEE
    The Effect of Confinement on Ground Vibration Amplitude

    By Jay Rodgers

    There has been a longstanding acceptance that burden plays a major role in the magnitude of ground vibration amplitudes generated from surface blasting. Much of the data that this belief is based upon

    Jan 1, 2003

  • AUSIMM
    An Example of the Use of Chemical Analyses in Evaluation of a Mineral Prospect

    A numerical method for discriminating between replacement and sedimentary processes is applied to a folded stratiform sulphide occurrence. It is shown that numerical treatment of chemical analyses fro

    Jan 1, 1973

  • NIOSH
    Evaluation Of Polyurethane Injection For Beltway Roof Stabilization In A West Virginia Coal Mine

    By Gregory M. Molinda

    Extremely difficult ground conditions were encountered in the main belt entry in a room and pillar mine in West Virginia. Several generations of supplemental support, including cable bolts, cribbing,

  • IIMP
    Mejora del Desempeño de Socios Estratégicos. Caso Antamina

    By César Arce

    El presente texto establece una plataforma de comunicación oficial entre la empresa y sus socios estratégicos logrando la estandarización del comportamiento empresarial y humano en temas relacionados

    Sep 9, 2007

  • SAIMM
    Phase Transformations And Surface Characterization Of The Platinum-Chromium Coated System - Synopsis

    By N. Hanief

    This research involves the investigation of phase transformations in the platinum-chromium coated system. Single-layer 0.1 µm platinum coatings were deposited via electron beam deposition on 99.98 per

    Jan 1, 2012

  • ISEE
    The Efficiency of Blasting Versus Crushing and Grinding

    By Jack Eloranta

    "This paper compares energy requirements for blasting, crushing and grinding. By tracking electricalconsumption for various powder factors, a general trend has appeared. This study involved over 100mi

    Jan 1, 1998

  • SME
    Slurry TBM Tunnel In Rock, The Modified Detroit River Outfall No. 2

    By William H. Hansmire

    The Modified Detroit River Outfall No. 2 (MOD DRO-2) will discharge treated wastewater to the Detroit River. Construction of a 6.4-m-diameter, 1.9-km-long tunnel was halted in 2003 by flooding during

  • SME
    The effect of reductive roasting on the electrostatic separation of rutile and zircon

    By D. Bessinger, J. Nell

    The electrical conductivity of rutile was optimised as a function of time, temperature and gas composition. These optimised conditions were used to treat rutile/zircon feed prep concentrate samples fr

    Jan 1, 2005